First Look at the July-August12 TestBeam Data T. Alexopoulos, G. Iakovidis, S. Leontsinis, K. Ntekas 1.

Slides:



Advertisements
Similar presentations
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Advertisements

Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Incline Tracks Theo Alexopoulos, George Iakovidis, Venetios Polychronakos 12 /10/
GIF++ DAQ architecture 1. Requirements Support of SRS, VMM (UDP packets), VME Several groups can run at the same time Each group should be able to start,
July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.
Finger Sci (SA) Beam profile wire chamber 727 TEST BEAM SETUP Jul-Aug2012 ( ) Si3 Si6 Y-inverted 26 Jura TOP VIEW SIDE VIEW.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
GEM MINIDRIFT DETECTOR WITH CHEVRON READOUT EIC Tracking Meeting 10/6/14 B.Azmoun, BNL.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Elec 関係、情報収集 ( 中。。 ). Design review for NSW electronics (2015/2) Design review for NSW ASIC (2015/4)
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
T.K. Hemmick. Background in SoLID Trackers Studies by Richard Holmes. PVDIS w/no baffles… 2 Signal Projective Bkg non-Projective Signal MIP BKG Large.
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
ATLAS micromegas activities (MAMMA)
Estimates of GEM chamber costs for the Solenoid spectrometer.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
Studying the efficiency and the space resolution of resistive strips MicroMegas Marco Villa – CERN MAMMA meeting Tuesday, 13 th December 2011 CERN, Geneva.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
Florida Institute of Technology, Melbourne, FL
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
2007 detectors study at CERN 1.SiPM time resolution 2.MAPD S60 3.Blue sensitive MAPD 4.New 16ch board 5.New HV.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
Status report - Tracking code - T.Gogami 9/30/2010.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Abstract Muon tomography for homeland security aims at detecting well- shielded nuclear contraband in cargo and imaging it in 3D. The technique exploits.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
FNAL beam test data analysis A Hands-on session at CMS Upgrade School Aiwu Zhang Florida Institute of Technology On behalf of the CMS GEM collaboration.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
Planes, Telescope, System
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
The Status of the Data Analysis of the Beam Test at FZJ
Testing and Configuration for VMM1 on the mini-MMFE
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Preliminary Performance of the L2 Chamber (Side A)
Large CMS GEM with APV & SRS electronics
Status of the Front Tracker GEM
Electronics and DAQ for the GEM Detector
DESY drift chambers efficiency and track reconstruction
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
Characterization of Wired-OR prototype board
Presentation transcript:

First Look at the July-August12 TestBeam Data T. Alexopoulos, G. Iakovidis, S. Leontsinis, K. Ntekas 1

finger Sci (SA) Beam profile wire chamber 727 TEST BEAM SETUP Jul-Aug2012 ( ) Si3 Si6 Y-inverted 26 Jura TOP VIEW SIDE VIEW Si1 26 s1 s640 New movable table (π -, -80 GeV/c) z x z y y x x veto Sci SB SD 5 SB Saleve SC 5 Si1 26 s1 s640 Si6 Y-inverted 26 Si3 26 s1 s Info: Test MM: T1-8, p=0.4mm, sw=0.3mm, gp=5mm X X X X X X X X T1 T2 T3 T4 T5 T6 T7 T8 XY Tmm3 Tmm2 XY Tmm5 X X X X X X X X T1 T2 T3 T4 T5 T6 T7 T8 XY Tmm3 Tmm2 XY 120 Freiburg frame -θ-θ Info: Ref MM: Tmm2-6, p=0.250mm, sw=0.150mm, gp=5mm XY Tmm6 XY (π -, -120GeV/c after Mon 30.07) Tmm6 Tmm5 s1 s64 s256 s1 s L1 s64 2

3

APV Elx 4

Ineffic.= π(d 2 /4)/L 2 =0.011 for d=0.3mm & L=2.5mm L d pillars Plane Efficiency Define Normal tracks Use cluster position as a hit x x x x x x x T1 T2 T3 T4 T5 T6 T7 T8 5

missing Missing cluster positions pilar x x x x x x x T1 T2 T3 T4 T5 T6 T7 T8 6

Normal Tracks 0.21mrad x x x x x x x T1 T2 T3 T4 T5 T6 T7 T8 x mrad Define Normal tracks Use cluster position as a hit [rad]

Position Resolution 8 Normal Tracks x x x x x x x T1 T2 T3 T4 T5 T6 T7 T8 x Define Normal tracks Use cluster position as a hit Calculate residuals σ in mm x x x x x x x T1 T2 T3 T4 T5 T6 T7 T8 σ ex final σ=(σ in *σ ex ) 1/2

9 Angular Resolution T1 T2 T3 T4 T5 T6 T7 T8 θ Odd MM earliest-time strip Even MM earliest-time strip All MM earliest-time strip Odd MM Average strip Even MM Average strip All MM Average strip Odd MM track info Even MM track info All MM track info sisi sfsf x x Odd MM cluster info Even MM cluster info All MM cluster info

Theta=20 degrees uTPC mode 10 θ

T12 T34 T56 T78 ? 11

Theta=30 degrees 12

T12 T34 T56 T78 ? 13

Theta=40 degrees 14

T12 T34 T45 T56 ? 15

mrad 0.21mrad 0.37mrad0.47mrad 0.38mrad 0.23mrad 0.30mrad0.33mrad [rad]

mrad 0.78mrad 0.55mrad 0.85mrad 0.82mrad 0.87mrad 0.93mrad 0.56mrad 0.57mrad [rad]

18 [rad]

19 [rad]

20 VMM1 1.6mrad 1.3mrad 1.4mrad 0.85mrad 0.88mrad [rad]

21

22 θ paral up n mm Residuals All MM Track Info T1 MM

23 final σ=(σ in *σ ex ) 1/2 x x x T1 T3 T5 T7 10 o x x x T2 T4 T6 T8 mm

24 final σ=(σ in *σ ex ) 1/2 x x x T1 T3 T5 T7 20 o x x x T2 T4 T6 T8 mm

25 final σ=(σ in *σ ex ) 1/2 x x x T1 T3 T5 T7 30 o x x x T2 T4 T6 T8 mm

26 final σ=(σ in *σ ex ) 1/2 x x x T1 T3 T5 T7 40 o x x x T2 T4 T6 T8 mm

27 VMM1 Normal Tracks Number of clusters Pilars mm x x x x T1 T2 T3 T4 T5 T6 x

28 VMM1 Normal Tracks Residuals x x x x x T1 T2 T3 T4 T5 T6

mm VMM1 card Flat cable AZ adapter BNL DAQ card Analog Amplitude & time Lemo cables Avnet LX9 switch x16 mmdaq PC SDC RJ45 USB Power supply 8A/5V CL & trigger Sci trigger APV SRS FEC Mezz card FPGA Virtex-7 Trigger Eval board CL & trigger distribution RJ45 Fast trigger out (LVDS) x16 Monitor out VMM1 Readout System July 2012 x16 29

To Ethernet switch mMegas Detector FPGA Trigger Processor Address in Real Time 8 planes VMM1 Control And Digitizer Trigger & Clock From SRS (Givi’s card) Trigger/Clock Distribution Monitor Analog Amplitude And Time 30

Theta=30 degrees 31

Theta=30 degrees 32

T12 T34 T56 33

30 o 20 o 10 o 540V 530V 520V 30 o 20 o 10 o 540V 530V 520V 34

Earliest time of T1 & T2 APV-Earliest time 35