Operations Scheduling

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Operations Scheduling
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Operations Scheduling
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 16 Scheduling.
Operations Scheduling
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
5. Operations Scheduling
Operations Management R. Dan Reid & Nada R. Sanders
PowerPoint Presentation
Operations Management
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
OPERATIONS SCHEDULING AND SEQUENCING
Industrial Systems Engineering Dept. İzmir University of Economics
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Detailed Scheduling (DS) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
15 - 1© 2011 Pearson Education 15 Scheduling for the Short Term PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global.
OPERATIONS SCHEDULING AND SEQUENCING
Short-Term Scheduling
Chap 11 Learning Objectives
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Scheduling Seminar exercises
Presentation transcript:

Operations Scheduling MBA 8452 Systems and Operations Management Operations Scheduling

Objectives Explain work center capacity Describe infinite and finite loading, forward and backward scheduling Solve scheduling problems Explain scheduling in service operations

Scheduling Allocates resources over time (short-run) to accomplish specific tasks Examples Hospital: operating room, staff University: course, classroom, instructor Airline: flight departure, arrival, and crew Factory: product production, worker

Operations Scheduling Work Center An area in a business in which productive resources are organized and work is completed Capacity and Scheduling Infinite loading Finite loading Forward scheduling Backward scheduling

Typical Scheduling and Control Functions Allocating orders, equipment, and personnel to work centers Determining the sequence of job orders Initiating performance of the scheduled work Shop-floor control

Work-Center Scheduling Objectives Meet due dates Minimize lead time Minimize setup time or cost Minimize work-in-process inventory

Some Priority Rules for Job Sequencing First-come, first-served (FCFS) Shortest operating/processing time (SOT) Earliest due date (DDate) Least slack time remaining (STR) (due date - current date) - (remaining processing time) Smallest critical ratio (due date-current date)/(remaining processing time)

Job Sequencing Performance Measures Average Lateness - meet due dates of customers or downstream operations Mean Flow Time - minimize the time a job spends in the process

Job Sequencing on One Machine Example Six jobs are lined up for processing on one machine. Their processing times (in order of arrival) and due dates are listed below What is the sequencing schedule using FCFS, SOT, STR, or DDate rule?

Job Sequencing on One Machine Example--FCFS Rule Average lateness = 9.3 days Mean flow time = 22.5 days

Job Sequencing on One Machine Example--SOT Rule Average lateness = 5.67 days Mean flow time = 18 days

Job Sequencing on One Machine Example--STR Rule Average lateness = 7.67 days Mean flow time = 22.33 days

Job Sequencing on One Machine Example--DDate Rule Average lateness = 5.17 days Mean flow time = 19.17 days

Job Sequencing on One Machine Example--Schedule Chart Time (in days)

Job Sequencing on One Machine Some General Results For job sequencing on one machine/work center, schedule completion time (makespan) is always the same regardless of the job order SOT minimizes average flow time and average waiting time Earliest DDate rule minimizes the worst (maximum) lateness

Job Sequencing on Two Machines Johnson’s Rule Minimizes the time to complete all jobs in both work centers/machines (makespan) Procedure of Applying Johnson’s Rule List the operation times for all jobs Select the shortest operating time overall If the SOT is for the: 1st machine - schedule that job first 2nd machine - schedule that job last Repeat steps  and , until all jobs are scheduled

Job Sequencing on Two Machines Example--Johnson’s Rule Five jobs need to be processed at two workstations with the following processing time requirement What is the best sequence of jobs that minimizes the flow time of all jobs? Answer: B-A-D-E-C

Job Sequencing on Two Machines Example--Schedule Chart Makespan = 65 hours

Shop-Floor (Production Activity) Control Major Functions 1. Assign priority to each shop order 2. Maintain work-in-process quantity information 3. Convey shop-order status information 4. Provide actual output data for capacity control purposes 5. Provide quantity by location by shop order for WIP inventory and accounting purposes 6. Provide measurement of efficiency, utilization, and productivity of manpower and machines

Input/Output Control Work Center Input Output Planned input should never exceed planned output (in the long run) Focuses attention on bottleneck work centers

Personnel Scheduling in Services Scheduling consecutive days off Scheduling daily work times Scheduling hourly work times