Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Managing Service Projects. Learning Objectives zDescribe the nature of project management. zIllustrate the use of a Gantt chart. zConstruct a project.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
CHAPTER 10 Sup. (Acceptance Sampling) Statistical Process Control – “Sampling to determine if process is within acceptable limits” Learned previously Acceptance.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
ISM 270 Service Engineering and Management Lecture 6: Facility Location, Project Management.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
إدارة المشروعات Projects Management
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
ISM 270 Service Engineering and Management Lecture 6: Forecasting.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Managing Projects Chapter 10. What is a Project? A project has a unique purpose A project is temporary A project requires resources A project should have.
1 Ch. 15 Managing Service Projects. 2 常見的專案問題 1. 畢專:開學前完成計畫書( Gantt 圖) 2. 畢旅,或系學會規劃運管營及交通盃 3. 借鏡:訪談本系主辦運輸年會之經驗,老 師提國科會計畫案 4. 包括哪些 activity ? Critical.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
4.1 Dr. Honghui Deng Associate Professor MIS Department UNLV MIS 746 IS Project Management.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management, Forecasting.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Project Management © Wiley 2007.
Project Management CPM, PERT, Crashing – An Illustrative Example
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
Project Management Chapter 17.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Network Planning Methods Example PERT & CPM
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
TK3333 Software Management Topic 6: Scheduling. Contents  Estimate the duration for each activity  Establish the estimated start time and required completion.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management, Forecasting.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Chapter 16 – Project Management
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Project Management McGraw Hill “Service Management” by Fitzsimmons.
Project Planning and Budgeting
Probabilistic Time Estimates
תזמון פרויקטים.
Chapter 16 – Project Management
General Foundry Example of PERT/CPM
Managing Service Projects
Exercise – A small building.
Presentation transcript:

Managing Projects

Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be scheduled to begin and end? zWhich activities are critical to completing the project on time? zWhat is the probability of meeting the project completion due date? zHow should resources be allocated to activities?

Tennis Tournament Activities ID Activity Description Network Immediate Duration Node Predecessor (days) 1 Negotiate for Location A Contact Seeded Players B Plan Promotion C Locate Officials D Send RSVP Invitations E Sign Player Contracts F 2,3 4 7 Purchase Balls and Trophies G Negotiate Catering H 5,6 1 9 Prepare Location I 5, Tournament J 8,9 2

Notation for Critical Path Analysis Item Symbol Definition Activity duration t The expected duration of an activity Early start ES The earliest time an activity can begin if all previous activities are begun at their earliest times Early finish EF The earliest time an activity can be completed if it is started at its early start time Late start LS The latest time an activity can begin without delaying the completion of the project Late finish LF The latest time an activity can be completed if it is started at its latest start time Total slack TS The amount of time an activity can be delayed without delaying the completion of the project

Scheduling Formulas ES = EFpredecessor (max) (1) EF = ES + t (2) LF = LSsuccessor (min) (3) LS = LF - t (4) TS = LF - EF (5) TS = LS - ES (6) or

Tennis Tournament Activity on Node Diagram J2J2 B8B8 START A2A2 C3C3 D2D2 G4G4 E 10 I3I3 F4F4 H1H1 TS ESEF LSLF

Early Start Gantt Chart for Tennis Tournament ID Activity Days Day of Project Schedule A Negotiate for 2 Location B Contact Seeded 8 Players C Plan Promotion 3 D Locate Officials 2 E Send RSVP 10 Invitations F Sign Player 4 Contracts G Purchase Balls 4 and Trophies H Negotiate 1 Catering I Prepare Location 3 J Tournament 2 Personnel Required Critical Path Activities Activities with Slack

Resource Leveled Schedule for Tennis Tournament ID Activity Days Day of Project Schedule A Negotiate for 2 Location B Contact Seeded 8 Players C Plan Promotion 3 D Locate Officials 2 E Send RSVP 10 Invitations F Sign Player 4 Contracts G Purchase Balls 4 and Trophies H Negotiate 1 Catering I Prepare Location 3 J Tournament 2 Personnel Required Critical Path Activities Activities with Slack

Incorporating Uncertainty in Activity times A M D B F(D) P(D<A) =.01 P(D>B) =.01 optimistic most pessimistic likely TIME

Formulas for Beta Distribution of Activity Duration Expected Duration Variance Note: (B - A )= Range or

Activity Means and Variances for Tennis Tournament Activity A M B D V A B C D E F G H I J 2 2 2

Uncertainly Analysis Assumptions 1. Use of Beta Distribution and Formulas For D and V 2. Activities Statistically Independent 3. Central Limit Theorem Applies ( Use “student t” if less than 30 activities on CP) 4. Use of Critical Path Activities Leading Into Event Node Result Project Completion Time Distribution is Normal With: For Critical Path Activities

Completion Time Distribution for Tennis Tournament Critical Path Activities D V A 2 4/36 C 3 4/36 E /36 I 3 36/36 J 2 0 = /36 = 5.2 =

Question What is the probability of an overrun if a 24 day completion time is promised? 24 P (Time > 24) = =.04 or 4% Days

Costs for Hypothetical Project Cost (0,0) Schedule with Minimum Total Cost Duration of Project Total Cost Indirect Cost Opportunity Cost Direct Cost

Activity Cost-time Tradeoff C C*C* D*D* D Activity Duration (Days) Normal Crash Slope is cost to expedite per day Cost

Cost-Time Estimates for Tennis Tournament Time Estimate Direct Cost Expedite Cost Activity Normal Crash Normal Crash Slope A B C D E F G H I J Total 115

Progressive Crashing Project Activity Direct Indirect Opportunity Total Duration Crashed Cost Cost Cost Cost 20 Normal Normal Duration After Crashing Activity Project Paths Duration A-C-D-G-I-J 16 A-C-E-I-J 20 A-C-E-H-J 18 A-C-F-H-J 12 B-F-H-J 15

Applying Theory of Constraints to Project Management zWhy does activity safety time exist and is subsequently lost? 1. Dependencies between activities cause delays to accumulate. 2. The “student syndrome” procrastination phenomena. 3. Multi-tasking muddles priorities. zThe “Critical Chain” is the longest sequence of dependent activities and common resources. z Replacing safety time with buffers - Feeding buffer (FB) protects the critical chain from delays. - Project buffer (PB) is a safety time added to the end of the critical chain to protect the project completion date. - Resource buffer (RB) ensures that resources (e.g. rental equipment) are available to perform critical chain activities.

Accounting for Resource Contention Using Feeding Buffer J2J2 B8B8 START A2A2 C3C3 D2D2 G4G4 E 10 I3I3 F4F4 H1H1 FB=7 FB=5 NOTE: E and G cannot be performed simultaneously (same person) Set feeding buffer (FB) to allow one day total slack Project duration based on Critical Chain = 24 days

Incorporating Project Buffer J2J2 B4B4 START A2A2 C3C3 D2D2 G2G2 E5E5 I3I3 F2F2 H1H1 FB=2 FB=3 NOTE: Reduce by ½ all activity durations > 3 days to eliminate safety time Redefine Critical Chain = 17 days Reset feeding buffer (FB) values Project buffer (PB) = ½ (Original Critical Chain-Redefined Critical Chain) PB=4