Federal Aviation Administration The Benefits and Challenges of Implementing Performance Based Navigation (PBN) Instrument Flight Procedures By: Presented.

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Overview of Continental En-route Navigation Specifications
Navigation Applications perspective on ADQ
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
1 Federal Aviation Administration FAA Academy November 21, 2011 Air Traffic Organization FAA Academy Courses Aviation System Standards November 21, 2011.
Javier Perez Diestro Air Navigation International Director
Presented to: IFIS 2008 By: Dan Burdette, Airspace System Inspection Pilot Date: June 23-27, 2008 Federal Aviation Administration Electronic Coding/Packing.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Procedure Design Considerations
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Flight Validation of Instrument Flight Procedures
Continuous Climb Operations (CCO) Saulo Da Silva
1 #4295. Which frequency should you expect to use for Regional Approach Control, control tower, and ground control respectively at DFW when coming from.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Airport Approach Simulation
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Instrument Procedure Design and Operational Differences
VALIDATION & IMPLEMENTATION CONSIDERATIONS 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Alternative Positioning, Navigation, and Timing Initiative
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
Stabilized Constant Descent Angle NPA’s
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
AIRSPACE What’s old –What’s new!.
1 July 18, 2011 Runway 19 Dalton Departure Procedure Flight Crews requesting the Dalton 19 Departure MUST possess the chart and adhere strictly to the.
Introduction to PBN Seminar ICAO PBN Implementation 1.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
VDA – Vertical Descent Angle
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
The Benefits of RNP-RNAV in Commercial Operations 4 th Steering Committee Meeting COSCAP-North Asia 2, 3 March 2005, Shanghai, PRC Captain Frank M. Hankins.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
AABI Annual Meeting Preparing Flight Education Graduates for NextGen, ADS-B, and PBN/RNP JIM MINER E190 TRAININGSTANDARDSSUPERVISOR.
Arrival Charts and Procedures
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Holding Procedures.
Overview of Continental En-route Navigation Specifications
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Air Traffic Organization
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Association of California Airports Instrument Flight Procedures
Performance Based Navigation: Navigation Specifications
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
Kabul RNAV Visual & RNP-AR Process & Benefits
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Performance Based Navigation –Civil Aviation Authority Actions
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

Federal Aviation Administration The Benefits and Challenges of Implementing Performance Based Navigation (PBN) Instrument Flight Procedures By: Presented to: Date: June 24, 2008 IFIS 2008 Bradley W. Rush Manager, Quality Oversight and Technical Advisory Staff National Flight Procedures Office, FAA

Federal Aviation Administration 2 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Presentation of benefits and challenges of PBN (RNP AR) and lessons learned of implementing over 100 instrument approach procedures in the United States Introduction

Federal Aviation Administration 3 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Overview Challenges –Operator authorization and training –Air traffic control procedures and training –RNP criteria application –Procedure benefit –Flight inspection technique Benefits –Reduced Obstacle Evaluation Area (OEA) –No secondary areas –Missed approach segment OEA –Radius-to-Fix leg types

Federal Aviation Administration 4 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Reduced OEA

Federal Aviation Administration 5 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Reduced OEA Benefits 2xRNP x RNP NM 2xRNP 1.00 INTERMEDIATE (RNP 1.00) 2.00 NM 0.60 NM 2x RNP 0.30 FINAL (RNP 0.30)

Federal Aviation Administration 6 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Reduced OEA LTP RNP 0.30 FINAL FAF VOR FINAL

Federal Aviation Administration 7 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits No secondary areas PLAN VIEW 2xRNP CROSS SECTION SECONDARY

Federal Aviation Administration 8 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits No secondary areas PLAN VIEW 2xRNP CROSS SECTION

Federal Aviation Administration 9 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Missed Approach OEA –RNP Standard Missed No secondary areas

Federal Aviation Administration 10 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Missed Approach OEA –RNP Standard Missed Benefit over ground-based missed approach RNP MISSED VOR MISSED

Federal Aviation Administration 11 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Missed Approach OEA –RNP less than 1.00 No secondary areas 0 NM3.2 NM0.6 NM1.3 NM1.9 NM

Federal Aviation Administration 12 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Missed Approach OEA (TF application) –RNP Less than 1.00 – RNAV (RNP) Y RWY 31, Hailey, ID LOCIR NUCIV SEVTE OLUYA HISPA

Federal Aviation Administration 13 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Radius-to-Fix (RF) path terminators –Provides a consistently repeatable ground track and smooth transition to next segment

Federal Aviation Administration 14 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits Missed Approach OEA (RF application) –RNP less than 1.00 – RNAV (RNP) Z RWY 26, Rifle, CO WADAK PUVOY SIYOP RW26 TEROE

Federal Aviation Administration 15 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Benefits RF application in approach segments –RNAV (RNP) Z RWY 13R, Palm Springs, CA

Federal Aviation Administration 16 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges Operator authorization and training

Federal Aviation Administration 17 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges –Adherence to published speed restrictions Air Traffic Control procedures and training –“Direct” clearances and vectoring involving RF leg types

Federal Aviation Administration 18 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges –Adherence to published speed restrictions Air Traffic Control procedures and training –“Direct” clearances and vectoring involving RF leg types

Federal Aviation Administration 19 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges RNP criteria application

Federal Aviation Administration 20 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance RNP criteria application –Application of VEB Challenges

Federal Aviation Administration 21 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges RNP criteria application –RF leg type connections to new and exisiting fixes

Federal Aviation Administration 22 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges RNP criteria application –Obtaining Average Cold Temperature (ACT)

Federal Aviation Administration 23 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Challenges RNP criteria application –Achieving benefit Operator certification ATC integration RNP levels ARINC leg types Missed approach climb gradients

Federal Aviation Administration 24 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance 3.1 NM OVER RNP VEB 21.70:1 (2.64°) FAF CROSS ASBL LTP 6 NM TCH GPA 3.00° BELOW PATH 2.00° Challenges Flight inspection technique –ILS vs. RNP

Federal Aviation Administration 25 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Summary Challenges –Operator authorization and training –Air traffic control procedures and training –RNP criteria application –Procedure benefit –Flight inspection technique Benefits –Reduced Obstacle Evaluation Area (OEA) –No secondary areas –Missed approach segment OEA –Radius-to-Fix Leg

Federal Aviation Administration 26 Based Navigation (PBN) Instrument Flight Procedures June 24, 2008 The Benefits and Challenges of Implementing Performance Questions ?