ERCOT Staff Facilitator Juan S. Santos Senior Consultant, System Planning Technical Operations WIND GENERATION STABILITY MODELING TASK.

Slides:



Advertisements
Similar presentations
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Advertisements

Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Wind farms with HVDC delivery in Load Frequency Control Lingling Fan April 22, 2010.
Resource Data Needed For Dynamic Simulations
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
System Strength Discussion
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Power Systems Consulting and Software 4 March 2004 BWEA Conference: UK Offshore Wind 2004 Integration of Offshore Wind Farms into the Local Distribution.
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Importance of advanced simulations of electrical system in wind turbines April 2010.
Wind Energy Forecaster A Web-based Wind Energy Prediction Tool Aditya Trivedi ’16 Advisor: Dr. Eric Larson.
Wind Generated Power Learning Intention: to discover how wind power works and is a renewable energy.
Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.
HomeNextPrevious I. INTRODUCTION II. WIND TURBINE GENERATOR MODEL III. STATCOM MODEL IV. SIMULATION RESULT CONTENTS OF TOPIC V. CONCLUSION Previous HomeNextHomePreviousNextHome.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Synchrophasor Measurement Implementation in ERCOT
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
RTWG Report to TAC August 5, 2010 Howard Daniels.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye University of Illinois at Urbana-Champaign 1 Lecture 23: Renewable.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
Voltage grid support of DFIG wind turbines during grid faults
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
GE Energy GE 2.x Zero Power Voltage Regulation Measurement Results Vincent Schellings.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
Art Deller ROS/WMS Update October 2013 RARF Data Completion Project.
VRT Study Update José Conto ERCOT System Planning.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
A METHODOLOGY FOR ESTIMATING WIND FARM PRODUCTION THROUGH CFD CODES. DESCRIPTION AND VALIDATION Daniel Cabezón, Ignacio Martí CENER, National Renewable.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512)
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
20th Century Electric Transmission Grid
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
Renewables and System Services Ann Scully.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
SPP Wind Integration Holly Starling Project Manager July 3, 2008.
Trent Mesa ProjectJune 2002 Welcome Trent Mesa Wind Project Note: This presentation is set to run automatically. The show should change on its own. If.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
Art Deller ROS/WMS Update November 2013 RARF Data Completion Project.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
Panhandle Renewable Energy Zone (PREZ) Study
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Wind Turbine Power Plant. Sources ●
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5,
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
WECC REMTF Workshop Spencer Tacke WECC Renewable Energy System Models Workshop March 9, 2016.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
Siemens Wind Turbine Weak Grid Option Modeling in PSSE WECC library Hongtao Ma, Siemens Wind Power Joergen Nielsen, Siemens Wind Power Good morning,
IG BASED WINDFARMS USING STATCOM
WECC REMTF Workshop Spencer Tacke
Renewable energy builds a more reliable and resilient electricity mix
Donald Davies Chief Senior Engineer
WECC REMTF Workshop Spencer Tacke
WECC REMTF Workshop Spencer Tacke
Presentation transcript:

ERCOT Staff Facilitator Juan S. Santos Senior Consultant, System Planning Technical Operations WIND GENERATION STABILITY MODELING TASK FORCE UPDATE FOR ROS APRIL 9, 2002

MOTIVATION Large number of new wind plants in West Texas MW & Growing West Texas already is transmission limited Primary is stability limit Secondary is thermal limits Accurate and Appropriate models development is necessary to support transmission planning and operational studies. Model development does have a cost Share the costs More Wind Generation Development is likely !

GENERATOR OUTPUT AND WIND SPEED

TYPES OF STABILITY STUDIES

MODELING REQUIREMENTS Control Block Diagrams Transmission interconnection point “aggregated” wind farm model. Incorporated in the PTI PSSE program and model library. –For use by ERCOT Staff, TSP’s & Stakeholders Validation that the numerical model responds the same as the “real world”. –Monitoring & Testing Flexible Model with ability to incorporate “local” time and seasonal factors –Stochastic Nature of Wind Account for both Real and Reactive power under steady state and dynamic studies Translation into PTI – Source Code

ADDITIONAL MODELING REQUIREMENTS Electro-mechanical interaction between turbines in “wind farms” that are near and with different set points excited by disturbances in power grid? –Soft shafts and different control set points pitch control, variable speed, voltage control etc… Effects of weak system (low X/R ratio) Periodic pulsations due to wind shear, wind speed and turbulence Model voltage, transient and subtransient stability phenomenon

COST SHARING Invoices Sent Out 02/26/02 COMPANYSITE NAME SIZE (MW) % OF COST RECD Cielo WindCapital Hill1008.9% Trent Wind Farm, LPTrent Wind Farm % Indian Mesa Power Partners LPEnron Indian Mesa I & II % FPL Energy Pecos WindWoodward Mt. Wind Ranch % FPL Energy Upton Wind IKing Mt. Wind Ranch % FPL Energy Upton Wind IIKing Mt. Wind Ranch % FPL Energy Upton Wind IIIKing Mt. Wind Ranch % FPL Energy Upton Wind IVKing Mt. Wind Ranch % NWP Indian Mesa Wind Farm, LPIndian Mesa Wind Farm % AEP-WTUFort Davis 160.5% FPL EnergyMesa Wind 1 (SW Mesa) % Delaware Mountain Wind Farm, LPDelaware Mountain Wind Farm % New World Texas Renewable Energy Big Spring Wind power Facility& Westex I Wind power % Wind Power Partners, LPKunitz %

VERY ROUGH COST ESTIMATE –Model Development $125,000 to $200,000 –Travel/Meetings $10, 000 to $20,000 –Validation /Testing $50,000 to $80,000 (?) –Data Research $20,000 to $30,000 (?) –Monitoring Equipment $20,000 to $30,000 (?) –Totals estimated at $225,000 to $360,000

DRAFT TIME TABLE