Wind Farm Curtailment Logic. Golden Spread Panhandle Wind Ranch Golden Spread Panhandle Wind Ranch (GS PWR) – 78.2 MW – 34 Turbines – Located just East.

Slides:



Advertisements
Similar presentations
Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
Advertisements

Find the solutions. Find the Vertex and Max (-1, 0) (5, 0) (2, 10)
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
Impact of Variability on Control Performance Metrics James D. McCalley Harpole Professor of Electrical & Computer Engineering Iowa State University 1.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
GIA Tariff Changes GIA Billing Workshop May 24, 2005 For Discussion and Informational Purposes Only.
Resource Offer Commitment Parameters Structured Market Trials August 23, 2013 Gay Anthony SPP Market Design.
National Renewable Energy Laboratory, Photovoltaic Resource of the United States (2009). Map shows annual average solar resource for a solar PV system.
Bruce Mountain Director Market power and generation from renewables: the case of wind in the South Australian electricity market Presentation to IAEE 35.
How much rent do you pay per month during the academic year? (Enter DK if you don’t know.)
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
 Frequency Spectrum and Bandwidth  Other Definitions of Bandwidth  Digital Signals.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
PJM©2013 Future Generation Mix in PJM Governor’s Conference on Energy Richmond, VA Steven R. Herling Vice President, Planning PJM Interconnection October.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
RTWG Report to TAC August 5, 2010 Howard Daniels.
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Supply = the amount of goods generally available.
Demand Response Products. Discussion Points 1.Setting the scene….. 2.Virtual Power Station 3.Reserves deployment order 4.Demand Response Products.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
ISO Comparison – CAISO Alex Lee (ERCOT)
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Free Phone $25 a month 100 minutes then 35c per min Free Phone $25 a month 100 minutes then 35c per min Free Phone $20 a month 75 minutes then 25c per.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Role of Investor Owned Utility in Development of Wind Energy in Iowa from an Engineers perspective Jeff Bales June 2011.
Preliminary IDT Debrief 02/26/ Deployment Test Debrief Overall the Fourteenth Deployment test was a great success All of the BAs.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Graham Generation and the Market – The Facts October 8, 2008.
Price Correction Process Resmi Surendran QMWG 04/10/2015.
Developing Load Reduction Estimates Caused by Interrupting and/or Curtailing Large Customers By Carl L. Raish 2000 AEIC Load Research Conference.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Responsive Reserve Service Deliverability Review September 15,
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
In cell E3 enter a formula to display the viewing cost if a local taxi is used. If the distance to the property is: less than 5 kilometres, the cost will.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Wind Management at MISO
Current FRRS Language & Explanation of Posted Data
Introduction Anders Plejdrup Houmøller Houmoller Consulting ApS
Load Response Products from Constellation NewEnergy
30 Minute Reserves EPFSTF January 4,
Changing Market Dispatch
NYS Department of Public Service
Presentation transcript:

Wind Farm Curtailment Logic

Golden Spread Panhandle Wind Ranch Golden Spread Panhandle Wind Ranch (GS PWR) – 78.2 MW – 34 Turbines – Located just East of Amarillo TX in the TX Panhandle – Commercial Operations Date September 2011 Capacity Factor: 48.59% Effective Factor: 50.84% Highest Monthly Capacity Factor: 60.89% Lowest Monthly Capacity Factor: 36.57% Average LMP:$23.29/MWh Max LMP: $408.28/MWh Min LMP: $ /MWh

Curtailment EIS Market - Intermittent Status GSEC imports the (LIP) into SCADA from the XML Listener data stream (We hope to be able to get market prices from SPP via ICCP in the future). A short program is written within SCADA to evaluate the LIP prices and send a base point to the wind farm control system if the criteria is met.

Curtailment Continued…. The logic will Curtail the wind farm (reduce output close to zero without opening the breaker) if the instantaneous price is less than or equal to a certain “extreme” price point or if the average price for two consecutive intervals are less than or equal to a “less extreme” dollar amount. The logic will Release the wind farm (increase based on actual capability of production) if the instantaneous price is greater than or equal a certain “extreme” price point or if the average price for two consecutive intervals are greater than or equal to a “less extreme” dollar amount. The logic will ignore any price change for 20 minutes after each Curtailment or Release operation. – Safety – Oscillation

Curtailment Continued…. The wind farm has local/remote control capability, which allows the wind farm to ignore the SCADA signal if needed. An is automatically sent to the local BA for notification of when the wind farm will be curtailed and also when it will be released from curtailment as a result of the “logic”. This is sent 1 minute prior to being curtailed or released.