MSE507 Lean Manufacturing
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Starting the Journey. Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value.
MSE507 Lean Manufacturing
Lean Accounting and Value Stream Costing
Chapter 2 - The Value Stream
MSE507 Lean Manufacturing
Value Stream Analysis Kaizen Training
The Lean Enterprise Lean Foundations Continuous Improvement Training
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Value Stream Mapping.
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
The Basics of Lean and Clean Laura Pyzik 2007 Great Lakes/Great Plains P2 Conference March 13, 2007.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
How to Effectively Implement Set-up Reduction in Any Organization.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
Value Analysis/ Flow Analysis
Ch-6 Value Stream Mapping1 Value Stream Mapping An effective way of capturing the current situation, identifying the long-term lean vision, and developing.
Lean Basics Dewey Warden.
Simple Process Mapping Techniques
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
Chapter 4 Process Design.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
QUALITY IN THE TRIANGLE Welcome! “Value Stream Mapping” Presenter : Pauline Campbell May 22, 2007.
Philosophy and Key Concepts
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Module #5: Value-Stream Mapping & Quick Set-Up Dr. Ken Andrews High Impact Facilitation.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Rapid Improvement Events Converting Philosophy to Action Original slides by Doug Fingles - MERC.
Process Characteristics
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
© BMA Inc All rights reserved. Decision Making.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
Evan Leybourn STARTING WITH VSM & KANBAN A practical workshop on value stream mapping & WIP Starting with Value Stream Mapping and Kanban by Evan Leybourn.
1 Lean Office - Value Streams
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Mel Wendell – Mountain Pointe High School
Introduction to Value Stream Mapping & Management
Lean Manufacturing Series
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Lean Manufacturing Basic Overview XYZ Company.
繪製現狀圖.
Pull Manufacturing and Just In Time
IENG Lecture 06 Process Tools:
Chapter 2 Office and knowledge work
Value Stream Mapping GEOP 4316.
Introduction to Materials Management
Value Stream Mapping (VSM) Training
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Work Measurement and Lean Application
IENG Lecture 06 Process Tools:
Chapter 5 Value Stream Mapping
Chapter 5 Value Stream Mapping
Presentation transcript:

VALUE STREAM MAPPING Analysis of Material Transport

Outline  Introduction to Value Stream Mapping  Current State Map  Data Collection  Activity: Map Current State

Design Raw Materials Assembly Plants Distribution Customer Parts Manufacturing Definition of Value Stream A Value Stream includes all elements (both value added and non-value added) that occur to a given product from its inception through delivery to the customer. Requirements

VALUE STREAM PROCESS Assembly Cell PROCESS Welding PROCESS Stamping Finished Product Raw Material Value Stream Segment Typically we examine the value stream from raw materials to finished goods within a plant. It is also possible to map business processes using Value Stream Mapping.

Value Stream Mapping (VSM) is a hands-on process to create a graphical representation of the process, material and information flows within a value stream. Finished GoodsAssembly Layout Welding Rolling 6-wk Forecast Weekly Order 6 x / Day PC & L 6-wk forecast Daily Level Box DA1 DA2 DA3 C/O Time = CT = TAKT Time 3 Shifts DT = Scrap = Stamping 0 Overtime 2 Shifts Max Size # Material Handlers C/O Time = CT = TAKT Time 3 Shifts DT = Scrap / Rework = C/O Time = CT = TAKT Time 3 Shifts DT = Scrap / Rework= Small Lot# Operators Customer X pcs / month Std Pack Qty # Shifts WIP = Steel Supplier Inv.Time Proc.Time TPc/t = ? ? days Future State Material, Information and Process Flows with total Product Cycle Time Value Stream Mapping

 Provide the means to see the material, process and information flows.  Support the prioritization of continuous improvement activities at the value stream  Provide the basis for facility layout Eliminate Waste Objectives of Value Stream Mapping AND...

 Producing defective parts  Passing on defective parts  Not communicating improvements  Overproduction  Inventories  Motion  High nonvalue ratio  Transportation  Waiting  Counting  Inspection after the fact  Facility layout  Excessive setup times  Incapable process  Maintenance  Work method  Training (or lack of)  Supervisory ability (coaching)  Production planning/scheduling  Lack of workplace organization  Supplier quality/reliability  Lack of concern Waste Opportunities

Approaches

Define all activities required to design, order, and provide a specific product, from concept launch, to order to delivery, from raw materials into the hands of the customer. This includes: Information flow Material flow Inventory (WIP) Non value-added activities Transportation flow Mapping Value Streams

Value Stream Mapping A visual tool for identifying all activities of the planning, and manufacturing process to identify waste Provides a tool to visualize what is otherwise usually invisible The leaders of each product family need to have a primary role in developing the maps for their own area Develop a current state map before improvements are made so that the efforts and benefits can be quantified On the shop floor, not from your office—you need the real information, not opinion or old data What? Why? Who? When? Where?

Value Stream Map Symbols Spot weld ABC plating C/T = 30 sec C/O = 10 min 3 shifts 2% scrap rate Process Finished goods VendorData box 3,000 units = 1 day Inventory PushSupermarket Physical pull Mon and Wed Shipment

Approach to Value Stream Mapping Step #1  Identify customer requirements  Define method of delivery  Define typical quantity requirements  It is OK that more than one customer is served by this value stream, but make sure that the primary processes used are similar  Use a pencil rather than computer 6 units/ week Recyclable tray XYZ Corporation 18 units/day 9 lefts 9 rights

Approach to Value Stream Mapping Step #2  Perform an upstream walk through each process step, observing and documenting as much of the following as possible:  Cycle time (operator & machine cycle time)  Changeover times  Average inventory queue  Average production batch size  Number of operators at each process  Package or container size  Available time (don’t count breaks)  Scrap rate  Machine up time (availability)  Number of product variations 6 units/ week Recyclable tray XYZ Corporation 18 units/day 9 lefts 9 rights

Process Description Crew size: Output: per: Waste % Time available C/T C/O Up time: I The triangle symbol identifies inventory; this can be expressed in pieces or in time (how many hours, days, or weeks of inventory). The arrow connects to the next process. A straight arrow can stand for a push, a curved arrow can symbolize a physical pull from a kanban location. Step #3 Record as much data as is pertinent in the process description box Approach to Value Stream Mapping

Step #4 Dream about perfection Think outside the box Develop alternatives to the current state map—Muda free Focus on velocity Test each idea if it supports: One-piece flow Pull Approach to Value Stream Mapping

Step #4 Dream about perfection Think outside the box Develop alternatives to the current state map—Muda free Focus on velocity Test each idea against TOP— in other words, does it support: One-piece flow Pull Develop a “future state” map that visually describes the goal Break down the future state map into manageable steps Develop a Gantt chart (time-phased project plan) Identify the kaizen events that will need to take place Approach to Value Stream Mapping

Fast Track Process Improvement What process? Customer + requirements Map current process Identify hot-spots Root-cause analysis Improvements to a) fix root causes b) meet C requirements Metrics (1-3 months) Communicate plan Implement, measure, fine-tune

Weekly shipments: 700,000 lineal 50,000 pieces 1,034 sec280 sec I Molder #4 Crew size: 4 Run speed 300 ft/min Output:1,285 pieces/hr Waste = 1/2% Sec available27,000 C/T= 2.8 sec C/O= min % Crew:days= 100% swing = 0 % % Reliability = 98% Weekly hr = 38.9 I Prime Crew size: 3 Run speed: 3,15 l ft/min Output: 1,350 pieces/hr Waste = 3% Sec available 27,000 C/T= 1.3 sec C/O= 1 min - 1 hr % Crew:days =100% swing = % Reliability =73% Weekly hr = sec Staging 5,350 finished pieces/day I Lam #1 Crew size: 4 Run speed 58 ft/min Output: 500 pieces/hr Waste = 1/2% Sec available 27,000 C/T= 7.2 sec C/O= min % Crew:days= 100% swing = 0% % Reliability = 98% Weekly hr = 5 5 % 90 % I Resaw (4 saws) Crew size: 1 1/3 Run speed 184 ft/min. Output:1,584 pieces/hr Waste = Sec available 108,000 C/T= 2.3 sec C/O= min % Crew Days =100% Swing =0% % Reliability = 95% Weekly hr = % 10% 230 sec 90% 268 pieces 4,500 pieces 9000 pcs 9,000 pieces.5 hr48 hr 6-day lead time as shown Current State Map (Simplified)

Process Time Shear 10 blanks= 15 min Punch 10 blanks= 30 min Deburr 100 parts= 10 min Form 100 parts = 40 min Hrdwr 100 parts= 15 min Pack 100 parts= 10 min Total = 120 min Lead time 1.0 day 0.5 day 1.0 day 1.5 day 0.5 day 5.5 day (7,920 min) 120 is 1.5% of total lead time or a ratio of 1:66 Value-added Ratios VA:NVA

Production lead time = 3.7 hr Value-added time 1,233 sec Weekly shipments: 700,000 lineal 50,000 pieces 1,034 sec VA Ratio =1:12 Staging 5,350 finished pieces/day I Lam #1 Crew size: 4 Run speed 58 ft/min Output: 500 pieces/hr Waste = 1/2% Sec available 27,000 C/T= 7.2 sec C/O= min % Crew:days= 100% swing = 0% % Reliability = 98% Weekly hr = 5 5% I Primed lineal cell Crew size: 6 Run speed 300 ft/min Output: 1,285 pieces/hr Waste = 1.2% Sec available 27,000 C/T= 2.8 sec C/O= mins % Crew days =100% % Reliability = 95 % Weekly hr = sec 268 pieces 4,500 pieces.5 hr.2 hr 3 hr  Free up $50,625 inventory  96% improvement in lead time  Instant quality feedback 1-day lead time as shown 95% Future State Map

Before  5 forklift movements  28,118 pieces in WIP  144 hr lead time  273 labor hr/week  9,000 ft 2 required After  3 forklift movements  10,118 pieces in WIP  3.7 hr lead time  235 labor hr/week  2,760 ft 2 required Improvement  40% reduction  64% reduction  97% reduction  14% reduction  70% reduction Improvement Data

Value Stream Mapping: Summary  Develop a current state map first  Clearly document the future state map so everyone can visualize it  Perform the improvements in manageable steps  Be good at finishing—use policy deployment  Don’t wait for the entire process to complete, celebrate the journey