Starting the Journey. Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value.

Slides:



Advertisements
Similar presentations
Value Stream Mapping AGENDA Introduction to mapping
Advertisements

Lean Manufacturing.
Part of a Training Module Series Part of a Training Module Series Kaizen Orientation Training.
MSE507 Lean Manufacturing
Understanding the Current Condition
O How to Understand & Apply Lean in the Workplace Professional Development Lean Series Charles M. Saunders Lean Libra Consult, LLC November 3, 2010 Oregon.
VALUE STREAM MAPPING Analysis of Material Transport.
MSE507 Lean Manufacturing
1 Leveling: Tortoise not Hare. 2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that.
Chapter 2 - The Value Stream
MSE507 Lean Manufacturing
Value Stream Analysis Kaizen Training
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Management is Essential
The Lean Enterprise Lean Foundations Continuous Improvement Training
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
Value Stream Mapping.
Value Stream Mapping Day 1
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Value Stream Mapping 6 4/19/2017 © 2009 RLM & Associates LLC.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
The Basics of Lean and Clean Laura Pyzik 2007 Great Lakes/Great Plains P2 Conference March 13, 2007.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Lean Principles First, let’s investigate Lean Principles.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
BIS 494: Topics in Information Systems 1 The Lean Manufacturing and Value Stream Mapping Chapter 4 (Supplement) Business Process Modeling, Simulation and.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
Ch-6 Value Stream Mapping1 Value Stream Mapping An effective way of capturing the current situation, identifying the long-term lean vision, and developing.
Lean Basics Dewey Warden.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
JIT – Just-In-Time Production
Managing by value stream
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
QUALITY IN THE TRIANGLE Welcome! “Value Stream Mapping” Presenter : Pauline Campbell May 22, 2007.
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Business Rescue and Recovery In A Challenging Economic Time! Tom Davis Lean Business Initiatives (Lean May Not Be the Immediate Answer)
1 The Application of Industrial Production Techniques to Health Care Delivery Summary of notes Pittsburgh Regional Healthcare Initiative: Perfecting Patient.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Activity Of The Product. 2freeleansite.com Activity Of The Product Activity of the product focuses the “Product or Thing” from “start” to “finish”. -
MAPPING YOUR VALUE STREAM
Value Stream Mapping Defining the Value Stream. Your Time to Relax.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Review of Lean Topics Dewey Warden.
1 Lean Office - Value Streams
1 FMS Executive Series FBP-FMS285A Define Value Value Stream Map - Current Sate - Future State.
Value Stream Mapping. Tips Keep it high level Remember this is a value stream map NOT a process map Use approximately 8 process steps Focus on the high.
Introduction to Value Stream Mapping & Management
Lean Manufacturing Series
Management is Essential
Management is Essential
Lean Manufacturing Basic Overview XYZ Company.
繪製現狀圖.
Value Stream Mapping GEOP 4316.
Introduction to Lean Systems
Value Stream Mapping (VSM) Training
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
Chapter 5 Value Stream Mapping
Presentation transcript:

Starting the Journey

Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value added wastes  One Time vs. Systematic Continuous  3 Keys to Complete Success  Focus on understanding concepts (principles)  Unwavering acceptance of all aspects of lean  Implementation plans: systematic, cyclical, continuous

7 Wastes Plus 17 Wastes Plus 1 1.Overproduction 2.Waiting 3.Transportation or conveyance 4.Over processing 5.Excess inventory 6.Unnecessary movement 7.Defects 8.Unused employee creativity

Building a Lasting Learning OrganizationBuilding a Lasting Learning Organization  Develop skilled leadership at all levels  Standardized plans for reacting to issues  Methods to create and sustain process stability  Standardized work  Etc.

Value Stream MappingValue Stream Mapping  Not just how, but why!!  Future State Map is the key  Requires assistance from experienced lean leader  Not as simple as it looks  VSM is an ‘action’ plan  Move from ‘isolated point kaizen’ to ‘true system based flow’

Future State ObjectivesFuture State Objectives  Flexibility  Short lead-time  Connected processes  Flow loops  Simplified information flow  Awareness of the customer requirement  Pacesetter

Transformation: Step by StepTransformation: Step by Step  Stabilize  Create Flow  Standardize  Level incrementally  Then connect processes and...  Stabilize  Create Flow  Standardize  Level incrementally

What’s Next?What’s Next?  Creating Stability  Developing Flow  Standardize  Level Incrementally

9 Value Stream Mapping

10 Whenever there is a product for a customer, there is a value stream. The challenge lies in seeing it (from Learning to See)

11 Outlook  Introduction to Value-Stream Mapping  The Current-State Map  Future lessons:  What Makes a Value Stream Lean  The Future-State Map  Achieving the Future State Map

12 Getting StartedGetting Started  What is Value-Stream Mapping?  Material and Information Flow  Selecting a Product Family  The Value-Stream Manager  Using the Mapping Tool

13 What is Value-Stream MappingWhat is Value-Stream Mapping  Value stream: Actions required to bring a product through the main flows essential to every product:  Production flow from raw material to customer delivery  Design flow from concept to launch  Different levels of value-stream mapping

14 Levels of MappingLevels of Mapping

15 Example: Value-Stream MapExample: Value-Stream Map Information Flow Material Flow

16 Why Value Stream Mapping?Why Value Stream Mapping?  Visualizes current flow  Shows waste  Communication tool  Provides basis for improvement  Shows linkage between information and material flow  Ultimate goal: Reduce lead time

17 Who is Responsible?Who is Responsible?  VSM crosses organizational boundaries  Need one person with lead responsibility for product family’s value stream  High level executive (often plant manager) or value- stream manager

18 Mapping StepsMapping Steps

19 Summary – Getting StartedSummary – Getting Started  Select a product family  Have one person personally lead the mapping effort  Begin at the “door-to-door” level  Consider material and information flows

20 Current-State MapCurrent-State Map  Material Flow Icons  General Icons  Information Flow Icons

21 Material Flow Icons 1Material Flow Icons 1

22 Material Flow Icons 2Material Flow Icons 2

23 Information Flow Icons 1Information Flow Icons 1

24 Information Flow Icons 2Information Flow Icons 2

25 General IconsGeneral Icons

26 Mapping TipsMapping Tips  Always collect current-state information while walking along the actual pathways of material and information flows yourself  Begin with quick walk along the entire door-to- door value stream  Begin at shipping and work upstream  Bring your stopwatch and do not rely on standard times or information that you do not personally obtain  Map the whole value stream yourself  Always draw by hand in pencil

27 Draw by Hand in PencilDraw by Hand in Pencil  No delay  You can do it yourself  Focus on understanding flow  Keep eraser handy

28 Steps in Drawing VSMSteps in Drawing VSM 1.Customer 2.Processes, Data boxes and Inventory 3.Material Flow 4.Information Flow and Push Arrows 5.Timeline

29 Current-State Mapping ExampleCurrent-State Mapping Example  ACME Stamping  Stamped-steel steering brackets  Hold the steering column to the body of a car  Two versions: Left-hand side and right-hand-side

30 1. Mapping Customer Requirements1. Mapping Customer Requirements  Customer: State Street Assembly  Two shifts  18,400 steering brackets per month  12,000 left-hand  6,400 right-hand  Palletized returnable tray packaging  20 brackets per tray  Up to 10 trays per pallet  Customer orders in multiples of trays

31 2. Basic Production Processes2. Basic Production Processes 1.Processes 2.Data Boxes 3.Inventory

Processes ACME2. 1. Processes ACME  Stamping  Spot-Welding Workstation 1  Spot-Welding Workstation 2  Assembly Workstation 1  Assembly Workstation 2  Shipping

Data Boxes2. 2. Data Boxes  Mapping Tip: Typical Process Data  C/T = cycle time  C/O = changeover time  Uptime  EPEx = Production batch sizes (Every part every …)  Number of operators  Number of product variations  Pack size  Working time (time available in seconds)  Scrap rate

Data Boxes ACME2. 2. Data Boxes ACME  Assembly #2  C/T = 40 seconds  C/O = 0  Uptime = 100%  Shifts = 2  Seconds available = 27,600

Inventory ACME2. 3. Inventory ACME  Stamping  5 coils before stamping  4,600 LH  2,400 RH  Spot-Welding Workstation 1  1,100 LH  600 RH  Spot-Welding Workstation 2  Assembly Workstation 1  Assembly Workstation 2  Shipping

36 3. Mapping Material3. Mapping Material  Steel supplier  Weekly orders  Shipments by truck twice weekly (Tuesday/Thursday)  Pack size = 500 foot rolls of coiled steel  Customer  One daily shipment by truck

37 4. Mapping the Information Flow4. Mapping the Information Flow  Right to left, top half of the map space  ACME: MRP system to schedule shop floor  “Go see” scheduling

38 5. Draw Time Ladder5. Draw Time Ladder  Upper line = production lead time  Calculation inventory lead time = inventory quantity/daily customer requirements  Lower line = processing time  Summarizes current conditions of value-stream  Which time is value adding?

39 Problems  Production lead time > Processing time  Financial  Quality  Flexibility

40 In-class exerciseIn-class exercise  Divide into teams from simulation exercise  Develop current-state map for simulation

41 Individual Homework 1 5%Individual Homework 1 5%  Draw Current-State map for TWI Industries  Due Monday