2/6/2014 1 PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.

Slides:



Advertisements
Similar presentations
2/13/ PHENIX WEEKLY PLANNING Feb. 13, 2014 Don Lynch.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
8/7/2014 PHENIX WEEKLY PLANNING August 7, 2014 Don Lynch 1.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
5/15/ PHENIX WEEKLY PLANNING May 15, 2014 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 13, 2014 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
11/29/20121 PHENIX WEEKLY PLANNING 11/29/12 Don Lynch.
6/12/2014 PHENIX WEEKLY PLANNING June 12, 2014 Don Lynch 1.
7/3/2014 PHENIX WEEKLY PLANNING July 10, 2014 Don Lynch 1.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
7/31/2014 PHENIX WEEKLY PLANNING July 31, 2014 Don Lynch 1.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
5/22/ PHENIX WEEKLY PLANNING May 22, 2014 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Presentation transcript:

2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch

2/6/ This Week Snow/sleet/freezing rain, etc. Plan/Install MPC-Ex FEM Continue F/VTX commissioning Open F/VTX for troubleshooting faulty pixel ladder; close up and cool down F/VTX Tech Support for Run 14 as required Investigate MMS water leak Troubleshoot MuTr South LV drop outs Troubleshoot faulty TOF E Support for sPHENIX efforts as required

2/6/ Next Week Run 14 Continues Plan/Install MPC-Ex FEM Continue F/VTX commissioning Tech Support for Run 14 as required Support for sPHENIX efforts as required

2/6/ VTX/FVTX commissioning Troubleshooting Faulty VTX Pixel ladder Continuing Commissioing

Mechanical installation complete Services connected Rack assembly & FEM assembly waiting for final FEM modules MPC-Ex Initial (Partial) Installation 2/6/2014 5

6 sPHENIX Prototype Beam Test of combined EMCAL and HCAL prototypes at Fermilab in Feb /6/2014

7

8

9 sPHENIX Modeling support for updated MIE sPHENIX

2/6/ ePHENIX Plan View Elevation View

2/6/ Remaining 2013 Shutdown Schedule Start Flammable gas flowDone Close shield wall, install radiation interlocks and prepare for run 14Done Pre-run commissioning and detector prep testing for run 14Done Start run 14Done

2/6/ Safety and Security PHENIX Annual Safety Review: Action Items Provide a procedure to test the window washer interlocks (Lynch Jan 15, 2014) Done Add (load limit) weight postings on the new gratings covering the cables adjacent to the sill (Phillips/Lynch Jan 15, 2014) Done Complete the platform gates installation (Phillips Jan 15, 2014) Dave is still working on this, (hopefully to finish this week?) (Note: this is not required for run start sign off Provide the new flammable gases leak rates (Pisani, Jan 10, 2014) Done Provide the updated gas usage quantities (Pisani Jan 10, 2014) Done Add a caution sign not to overfill the NOVEC bottles (Pisani Jan 10, 2014) Done Carry out the Blue Sheeting (CAS, Phillips Feb 1, 2013) Done

2/6/ Safety and Security PHENIX Annual Safety Review: Action Items (Continued) Document the new ethane installation and leak and pressure testing (Biggs Jan 15, 2014) Carter will work on this next week, it may carry over for a few weeks until the trailer is delivered. After the trailer is delivered and installed, but before we switch the trailer on we will have a walk thru with the appropriate safety personnel, Mike Gaffney et. al. We expect to start the run with the existing 12 packs supplying the ethane, until all approvals are in place. (Note: this is not required for run start sign off) Provide updated sweep procedures (Sampson Jan 15, 2014) Done Carry out an inspection of the installed platform gates (Cirnigliaro Feb 1, 2014) Dave must schedule the carpenters to finish this work then Cirnigliaro can do his walk thru. (Next week ??) General: Update the PHENIX ECR. (Craner, Jan 15, 2014) Done Update the PHENIX work plan if necessary (Cirnigliaro Jan 15, 2014) Done.

2/6/ Safety and Security PHENIX Annual Safety Review: Action Items (Continued) Carry out a magnetic safety review (Phillips Jan 10, 2014) Done A walk through of the PHENIX detector prior to introduction of flammable gas. (Makdisi et al Jan 10, 2014) Done, See next page for action items from walkthru Update the documented work procedures. (Lynch Continuing) There is only one procedure needing updating (MuID gas OPS) I have done a preliminary review and made some minor corrections, Rob has it next. Expect to have update completed by end of next week, 1/24/14. No other mandatory updates due in 2014, but will continue to monitor procedures and make updates if the need arises. (Note: this is not required for run start sign off) Establish trained PHENIX watch shifts. (O’Brien Jan 10, 2014) Done

2/6/ Walkthru Action Items Done Working on it To do list Done Some Signatures Needed

2/6/ planned Technical Support and Shutdown Activities Support for run 142/3-2/25/2014 Support for sPHENIX prototype tests at FermiLab1/21-2/25/2014 Procure & Fabricate parts for MPC-Ex North and South1/1/2014-6/30/2014 Assemble & test MPC-Ex South, ready for installation3/1-7/1/2014 Assemble & test MPC-Ex North, ready for installation7/1-9/25/2014 Start of Shutdown Tasks (purge flammable gas, disassemble and stow shield wall, remove collars, move EC to AH, Move MMS south, etc.)7/1 – 7/18/2014 Install scaffolding in Sta 1 South7/25/2014 Remove MPC-Ex prototype, Install new MPC-Ex South7/28-8/22/2014 Maint. & Repairs for MPC South, BBC South, RPC1 South, MuTr sta 1 South, as necessary7/28-8/22/2014 Remove scaffolding from sta 1 south, Move CM South8/25/2014 Install scaffolding in Sta 1 North8/26-8/29/2014 Prep MPC-Ex North installation area9/1-9/26/2014 Install new MPC-Ex North9/29-10/17/2014 Remove Sta 1 North scaffolds, Move CM North 10/20-10/24/2014 Other detector supportTBD Infrastructure Maintenance and ImprovementTBD Decommissioning of obsolete PHENIX detector equipmentTBD sPHENIX Supporton-going End of Shutdown Tasks (Move MS north, roll in EC, install collars, remove 10 ton cart, plates and manlifts, build shield wall, etc.)10/27-11/26/2014 Pink/White/Blue Sheets1/17/2014 End of Shutdown Party???? Start Flammable gas flow???? Close shield wall, install radiation interlocks and prepare for run 1412/31/2014 Start run 151/2/

2/6/ PHENIX Safety and Security From Ray Karol: BNL will be conducting their annual EMS/OSH and Compliance audits from 2/10/14 through 2/21/14. They will be assessing the following topics at C-AD (incl. PHENIX): Chemical Safety, Beryllium, Lead, Confined Spaces Laser Safety, Static magnetic Fields, Non-ionizing Radiation Compressed Gas, Cryogenics, ODH, Pressure Safety Hazardous, Industrial, Radioactive, Mixed and Medical Wastes; PCB Management; NTS EMS/OSH Programs You should all know the BNL ESSH Policy or know how to get it on the web and be able to explain what it means and how it applies to your job. See FAQs for the Environmental Management Program at: See FAQs for the OSH Management at: Staffhttp:// Managershttp:// Usershttp://

2/6/ Safety and Security No Report on Injuries This Week No new injuries reported on Safety Web site since 1/21/14

2/6/

2/6/ Where To Find PHENIX Engineering Info Run 14 Underway! (If you bet my Super Bowl prediction, sorry about that. I couldn’t have been more wrong) Now onto the Olympics (no predictions from me)