AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
Low Energy operation of RHIC AGS low energy extraction performance N. Tsoupas et. al. BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
4 th Order Resonance at the PS R. WASEF, S. Gilardoni, S. Machida Acknowledgements: A. Huschauer, G. Sterbini SC meeting, 05/03/15.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Haixin Huang AGS Cold Snake: Status and Plans.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Alexei Fedotov, December 7, Beam parameters and collective effects for pEDM ring (December 7, 2009)
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Acknowledgments: LIU-PT members and deputies, H. Bartosik
PSB rf manipulations PSB cavities
Beam dynamics requirements after LS2
PSB magnetic cycle 900 ms MeV to 2 GeV
JLEIC Ion Integration Goals
Summary of Working Group 1
JLEIC 200 GeV ion beam formation options
JLEIC Main Parameters with Strong Electron Cooling
Presentation transcript:

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang

2 Tasks l To preserve polarization, following things have to be done: orbit harmonic correction in the Booster (Gγ=3,4); high vertical tune in the AGS with both snake on; horizontal tune jump quads(JQ) on with right jump timing. l To further reduce the polarization loss in the AGS, preserve emittance is the way to go. We need good measurement of emittance throughout the accelerator chain: end of LINAC (LPM), Booster to AGS transfer line (MW006), AGS IPM (and new device eIPM). As cross checks, the emittance measurments in the AtR line (flags) and RHIC (IPM). l The source polarization in past runs was as high as 82%. It is expected to have some small gain this year but the upgraded source can provide more intensity. If Booster scraping can scrape the beam to give a brighter beam (smaller emittance), we win. l Our remaining jobs are: find ways to benefit from the higher input intensity, reliable emittance measurement, accurate JQ timing determination.

Haixin Huang 3 Plan on Emittance Front l We need reliable emittance measurement to get emittance evolution in the AGS. The ion collecting IPM has space charge effect. We can mitigate the effect by turning off RF, but this is only possible at flattop (without acceleration). We plan to take these measurements at various energies. l The electron collecting IPM (eIPM) does not have space charge effect, as electron travels very fast. We have installed them into AGS, but the vertical one has issues (non-symmetric profile, large profile). We are working on to improve that. l The upgraded source can deliver much more intensity now (typically 8- 9*10 11 ). But with the small emittance and higher intensity, space charge could be a problem at Booster injection. Space charge force is proportional to the peak current. One way to reduce the effect is to reduce the peak current. Dual harmonic RF cavity can do it.

Haixin Huang 4 Status l Dual harmonic RF setup has been tested in the Booster. With the h=2 cavity on for longer time (120ms), the beam seems brighter at extraction (same beam size, but more intensity). It has been used since 1/9. l Several JQ timing files have been tried. It seems that the timing needs to be earlier by 0.5ms from the timing derived from energy and tune measurements. Polarization is in the range of high 60% to low 70% with 2*10 11 intensity. l Benefit of JQ is seen: JQ on: ; JQ off ; ratio: Intensity was 1.5* l Many polarization profile measurements are done. l Intensity scan was also done.

Source Polarization History Haixin Huang 5

6 Booster Bunch with Different Harmonics (Simulation by Kip) The study last year showed that the emittance did not go down with Booster input intensity above 6* This could be due to space charge. The solution is to use dual RF harmonics in the Booster (has been used for high intensity operation a decade ago).

The Reduction in Peak Current is 25-30% Haixin Huang 7 (done by Kip)

Booster Dual Harmonic RF Cavity Haixin Huang 8 Yellow: Intensity Red: h=2 voltage Almost no loss with h=2 on.

Booster Mountain Range Haixin Huang 9 H=2 is off

AGS First Turn Bunch Shape Haixin Huang 10 The higher peak is with h=2 on.

Booster Late Intensity with and without Scraping Haixin Huang 11 (done by Keith)

AGS Polarization vs. Booster Input Intensity Haixin Huang 12 AGS intensity was at 2* No gain in polarization with higher Booster input (heavier scraping)

Booster sin3v Scan (1/24) 13 New Setting (done by Phil)

Booster cos4v Scan (1/24) 14 Setting Probably -10A is enough (done by Phil)

Haixin Huang 15 Comment on Booster Harmonic Scans l Step size of 1A is needed to pinpoint the optimal harmonic current. l Cos4v does not need to be at -14A, -10A is enough. Full spin flip is observed. l The scan moved the sin3v from 1A to 0.2A, a relative gain of 1.5% is seen. l This is the first time we can get full spin flip for sin3v curve, after PS group upgraded the power supply. Can we operate at the spin flip mode? It should be more stable, but requires higher current. Since it introduces extra spin flip, the spin sign for RHIC has to be changed. l The scan moved the cos3v from -5.6A to -6A, not much change in polarization due to shallower curvature. l The absolute value of the peak asymmetry changed a lot for two different RF settings. One can’t use the asymmetry value to judge input polarization. Only harmonic scan can tell if there is polarization loss in the Booster.

AGS Flattop Vertical Polarization Profile Haixin Huang 16

AGS Flattop Horizontal Polarization Profile Haixin Huang 17

AGS Flattop Vertical Polarization Profile (2/2) Haixin Huang 18

AGS Flattop Horizontal Polarization Profile (2/2) Haixin Huang 19

Haixin Huang 20 AGS Polarization Profile at Flattop Date P V max R H P H max R V P 0_mea P 200MeV -> P 0 1/ / / / The measured and expected P 0 agreement is reasonable. 2. If the lower P 0 for 2/2 is due to the high tune at Booster injection (put in use since 1/29), as the results of larger emittance, the R values should be larger, but they are about the same. 3. For the same P 0, we expect larger P max to be associated with smaller R value. We did not see that. P 0 is the polarization with zero emittance or source polarization. P v max equivalent to fixed target measurement done with vertical target.

AGS Emittance Comparison Haixin Huang 21 01/12/15 20:45:13 (black) vs.02/06/15 02:05:44 (red). Vertical difference started around 360ms, after transition.

AGS Polarization Ramp Measurement (1/18) Haixin Huang 22

AGS Polarization Intensity Scan Haixin Huang 23 We did not scan to 3*10 11 in run13. At 3*10 11, extrapolation from run13 (up to 2.2*10 11 ) is 62%.

Haixin Huang 24 Near Term Job List l Reduce the emittance in the AGS. l Jump quad timing setup. l Beta function measurement at IPM (vertical E15 has been studied so far) and eIPM. l eIPM setup. Currently, gas leak of horizontal eIPM is one problem. It can be fixed with parts arrived next week. Vertical one does not give reasonable sigma. l Setup various flattops for emittance and polarization measurements. Start from 40.5, then 31.5, 22.5, 13.5 and 7.5 if time allowed. l Booster injection tune setup study: compare the near half integer setting vs. 4.9 setting.