Environmental Analysis Machine Min Time Max Time Machine Min Time Max Time 1202651630 2202662026 3202672026 4202682026 Processing Time per Machine per.

Slides:



Advertisements
Similar presentations
Integer Optimization Basic Concepts Integer Linear Program(ILP): A linear program except that some or all of the decision variables must have integer.
Advertisements

Lab Module 02 Serial Manufacturing Line
Module C6 Other EOQ Type Models.
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Start up Excel. Notice that each row has a number, and each column has a letter. Click in A1 (column A, row 1), and type in a title for your data.
Cooling Business Group 1 Integrated Refrigerator.
ETM 607 – Output Analysis: Estimation of Absolute Performance
Job Shop Optimization December 8, 2005 Dave Singletary Mark Ronski.
Estimasi Parameter TIP-FTP-UB.
Q vs Await Node Q is a simplified Await node Q activity is the resource ie server, inspection Await Node can specify resource that is needed by activity.
Chapter 6: The Standard Deviation as a Ruler and the Normal Model.
Case Study 6: Concentrate Line at Florida Citrus Company
Parameterized Timing Analysis with General Delay Models and Arbitrary Variation Sources Khaled R. Heloue and Farid N. Najm University of Toronto {khaled,
Kenneth J. Andrews EMP Gen-X: Manufacturing Analysis What is the process?Build & test of AXIS machine for a specific Customer Who is the customer?MegaPower-
Chapter 8 Estimating Single Population Parameters
1 Simulation Lecture 6 Simulation Chapter 18S. 2 Simulation Simulation Is …  Simulation – very broad term  methods and applications to imitate or mimic.
Session 7b. Decision Models -- Prof. Juran2 Example: Preventive Maintenance At the beginning of each week, a machine is in one of four conditions: 1 =
Automated Analysis of Simulation Output Data and the AutoSimOA Project
Project : Man Utilization FMS Cell Unit 1104 DSES 6620 Spring 2002 William Harris.
1 Lecture 6 MGMT 650 Simulation – Chapter Announcements  HW #4 solutions and grades posted in BB  HW #4 average =  Final exam today 
Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Facilities Planning A Simulation Study of a Flow Shop Vs. a Job Shop Manufacturing.
MGTSC 352 Lecture 23: Congestion Management Introduction: Asgard Bank example Simulating a queue Types of congested systems, queueing template Ride’n’Collide.
1 Introduction to Biostatistics (PUBHLTH 540) Estimating Parameters Which estimator is best? Study possible samples, determine Expected values, bias, variance,
Summary: Review of Lean Principles
T T Population Variance Confidence Intervals Purpose Allows the analyst to analyze the population confidence interval for the variance.
Step 1. Locate the interval containing the score that separates the distribution into halves. There are 100 scores in the distribution, so the 50 th score.
9/10/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
Verification & Validation
Accuracy Learning Outcomes  Round off to a given number of decimal places  Round off to a given number of significant figures  Calculate the upper and.
Normal Distributions Z Transformations Central Limit Theorem Standard Normal Distribution Z Distribution Table Confidence Intervals Levels of Significance.
DSS Lab October 23, 2003.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
ETM 607 – Input Modeling General Idea of Input Modeling Data Collection Identifying Distributions Parameter estimation Goodness of Fit tests Selecting.
1 Terminating Statistical Analysis By Dr. Jason Merrick.
Normal Distribution.
T T Population Confidence Intervals Purpose Allows the analyst to analyze the difference of 2 population means and proportions for sample.
© BMA Inc All rights reserved. Decision Making.
Confidence Interval Estimation. Confidence Intervals on and An interval estimator is a formula that tells us how to use sample data to calculate an interval.
Integer LP In-class Prob
This Week Homework 2 parts 1 and 2 due by 5pm today. Answer keys posted tonight. Midterm 2 on Thursday, bring 8 ½ by 11 inch note sheet. No calculator.
The Enhanced Electronic Assembly and Test System ARENA
Estimating a Population Mean. Student’s t-Distribution.
How Good is a Model? How much information does AIC give us? –Model 1: 3124 –Model 2: 2932 –Model 3: 2968 –Model 4: 3204 –Model 5: 5436.
Confidence Intervals for a Population Mean, Standard Deviation Unknown.
Discrete-Event System Simulation Project Simulation of Complex Manufacturing System Cheryl Yale.
Introduction to OEE (Overall Equipment Effectiveness)
A stochastic scheduling algorithm for precedence constrained tasks on Grid Future Generation Computer Systems (2011) Xiaoyong Tang, Kenli Li, Guiping Liao,
Minds on! Two students are being considered for a bursary. Sal’s marks are Val’s marks are Which student would you award the bursary.
3.3 Measures of Spread Chapter 3 - Tools for Analyzing Data Learning goal: calculate and interpret measures of spread Due now: p. 159 #4, 5, 6, 8,
Manufacturing Simulation Case Studies
Supplementary Chapter B Optimization Models with Uncertainty
STATISTICS AND PROBABILITY IN CIVIL ENGINEERING
95% Confidence Interval for Mean Management philosophy
TQM Defined Total quality management is defined as managing the entire organization so that it excels on all dimensions of products and services that are.
36.1 Introduction Objective of Quality Engineering:
Modeling Basic Operations and Inputs

M6205 SYSTEM SIMULATION AND MODELLING TERM PROJECT
Total Productive Maintenance © Imants
Monte Carlo Simulation of Neutrino Mass Measurements
SP 225 Lecture 11 Confidence Intervals.
Introduction to Crystal Ball (Part I)
How to add 95% confidence interval error bars to t-test output
Review for Exam 1 Ch 1-5 Ch 1-3 Descriptive Statistics
Quantitative Data Who? Cans of cola. What? Weight (g) of contents.
Rounding and estimating: Upper and Lower Bounds
The Normal Distribution
Table 2: Experimental results for linear ELP
Conformity-of-Production
Presentation transcript:

Environmental Analysis Machine Min Time Max Time Machine Min Time Max Time Processing Time per Machine per Board

Environmental Analysis Selected Miscellaneous DataTime/shift 480 min Aisle/station2 Avg. downtime 30 min Board dimension 18”x28” Shifts/day 3 max Buffer cost $10,000 Maintenance 2 hrs/day Buffer capacity 1 Days/month20 Buffer dimension 5’x5’ Months/year13 Turntable cost $25,000 Inv. holding rate 18.5% Turntable capacity 1 Part value $10,000 Turntable dim. 5’x5’ Product Life 10 years Operator salary $60,000 Room dimension Actual33’x21’ 38’x24’ (35’x19’) Production quota 9,360 Mach. dimension 5’x5’ Scrap rate (1) 3% Aisle width 3.5’ Rework rate (5) 6%

Problem Statement Time per Shift 480 min Average Downtime- 30 min Working Time per Shift 450 min Shifts per Day (2)x 2 shifts Days per Monthx 20 days Months per Yearx 13 months Processing Time per Year 3,900 hours Quota: 9,360 Boards per Year Maintenance assumed to take place in the 3 rd shift Time Constraints

Methodology Find feasible layouts Measure room dimensions (account for pillars) Measure room dimensions (account for pillars) Arrange stations in order Arrange stations in order Run simulation on different layouts Define distribution (Uniform vs. Triangular) Define distribution (Uniform vs. Triangular) Scrap rate Scrap rate Rework rate Rework rate Collect output data Mean Mean Standard Deviation Standard Deviation Perform Case Analysis

Feasible Layouts Optional second door

hoursLayout #Mean*Std. Dev* 3,900 18, , ,970 19, , ,010 19, ,52424 Simulation Results * Rounding the mean down and standard deviation up

Recommendation Layout 2 99% Confidence Interval: 99% Confidence Interval: Run Time Lower Bound Upper Bound 3,9009,1699,253 3,9709,3689,506

Expected Case

Worst Case

Cost Analysis