Environmental Analysis Machine Min Time Max Time Machine Min Time Max Time Processing Time per Machine per Board
Environmental Analysis Selected Miscellaneous DataTime/shift 480 min Aisle/station2 Avg. downtime 30 min Board dimension 18”x28” Shifts/day 3 max Buffer cost $10,000 Maintenance 2 hrs/day Buffer capacity 1 Days/month20 Buffer dimension 5’x5’ Months/year13 Turntable cost $25,000 Inv. holding rate 18.5% Turntable capacity 1 Part value $10,000 Turntable dim. 5’x5’ Product Life 10 years Operator salary $60,000 Room dimension Actual33’x21’ 38’x24’ (35’x19’) Production quota 9,360 Mach. dimension 5’x5’ Scrap rate (1) 3% Aisle width 3.5’ Rework rate (5) 6%
Problem Statement Time per Shift 480 min Average Downtime- 30 min Working Time per Shift 450 min Shifts per Day (2)x 2 shifts Days per Monthx 20 days Months per Yearx 13 months Processing Time per Year 3,900 hours Quota: 9,360 Boards per Year Maintenance assumed to take place in the 3 rd shift Time Constraints
Methodology Find feasible layouts Measure room dimensions (account for pillars) Measure room dimensions (account for pillars) Arrange stations in order Arrange stations in order Run simulation on different layouts Define distribution (Uniform vs. Triangular) Define distribution (Uniform vs. Triangular) Scrap rate Scrap rate Rework rate Rework rate Collect output data Mean Mean Standard Deviation Standard Deviation Perform Case Analysis
Feasible Layouts Optional second door
hoursLayout #Mean*Std. Dev* 3,900 18, , ,970 19, , ,010 19, ,52424 Simulation Results * Rounding the mean down and standard deviation up
Recommendation Layout 2 99% Confidence Interval: 99% Confidence Interval: Run Time Lower Bound Upper Bound 3,9009,1699,253 3,9709,3689,506
Expected Case
Worst Case
Cost Analysis