TTF1/TTF2/XFEL/LC stability/reliability Stability: FEL requests beyond specs. What was measured? What needs to be measured What needs to be compared to.

Slides:



Advertisements
Similar presentations
Hans Weise Review Meeting on TESLA Test Facility Phase 2 Introduction Part 2 Hans Weise.
Advertisements

New hardware and setups New short pulse regime Experimental results TW power Future plans on laser development ATF CO 2 LASER progress Vitaly Yakimenko.
Modifications to DESY-II M. Minty Nov 11, The DESY-II 7GeV Lepton Synchotron DORIS f inj = 6.25 Hz E inj = 4.5 GeV N ppb = 5 · 10 9, typical DORIS.
Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
ALICE : Superconductive Energy Recovery Linac (ERL) “Quick course” for new machine operators Part 3: Experimental and Operational Procedures Y. Saveliev.
E. Schneidmiller and M. Yurkov (SASE & MCP) C. Behrens, W. Decking, H. Delsim, T. Limberg, R. Kammering (rf & LOLA) N. Guerassimova and R. Treusch (PGM.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
9/22/04J. Welch, LCLS Commissioning Worskhop, SLAC LCLS Commissioning Schedule and Startup Plan LCLS Commissioning Schedule and Startup Plan.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Scheduling of Experiments Christine Clarke, 10 th October 2012 FACET User Meeting.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
F Shot Engineering Accelerator Advisory Committee Elvin Harms Fermilab Beams Division 13 May 2002.
Low Emittance RF Gun Developments for PAL-XFEL
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Ned Arnold 13 July, 2009 Convenience Tools … July 13, 2009.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
Michael GalonskaWAO ´12, August Five years of operation at HIT Daily Performance Check & Beam Time Statistics M. Galonska, S. Scheloske, R. Cee,
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Fault Tolerance Benchmarking. 2 Owerview What is Benchmarking? What is Dependability? What is Dependability Benchmarking? What is the relation between.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
K.Honkavaara, LCLS ICW06 LCLS Injector Commissioning Workshop, SLAC, October 9-11, 2006 Linac Experience at FLASH Katja Honkavaara University of Hamburg.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Beam Dynamics WG Summary N.Solyak, K.Kubo, A.Latina LCWS 2014 – Oct 6-10, 2014 – Belgrade, Serbia.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
SASE optimization with OCELOT Sergey Tomin other co-workers: I. Agapov, G. Geloni, I. Zagorodnov.
Introdcution to Workpackage/Activity Reflection D. Schulte.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
What did we learn from TTF1 FEL? P. Castro (DESY).
Operational experience and recent results from FLASH (VUV FEL at DESY) E. Saldin, E. Schneidmiller and M. Yurkov for FLASH team Milestones Parameters of.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
ATF2 Status N.Terunuma, KEK
LCLS Commissioning & Operations High Level Software
Preparation Phase of the FAIR Project
Operations Machine Simulator.
Steering algorithm experience at CTF3
Automatic emittance measurement in the CERN 1.4 GeV Booster
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Planning the Experiment
Longitudinal Diagnostics for start-up
LCLS Commissioning & Operations High Level Software
Revised Commissioning Strategy
Review of Application to SASE-FELs
CEPC RF Power Sources System
Operations Department
What did we learn from TTF1 FEL?
Summary of Week 16 G. Arduini, J. Wenninger
Non-user time 2/7 of total
LCLS Longitudinal Feedback and Stability Requirements
Operations Department
Global Post Mortem Event Event Timestamp: 15/06/12 15:54:
VELA – CLARA AP (Draft) Goals Software Goals
Introduction to Free Electron Lasers Zhirong Huang
European XFEL Status Winni Decking, DESY
LEIR e-cooler operational experience and needs
Presentation transcript:

TTF1/TTF2/XFEL/LC stability/reliability Stability: FEL requests beyond specs. What was measured? What needs to be measured What needs to be compared to simulation ….. Improving is a learning curve: first TTF1

TESLA Test Facility - Operation week 3 / 2002 FEL User Operation week 7 / 2002 Accelerator Studies 100% 80% 60% 40% 20% Beam uptime and operational uptime (users or acc.studies) The TTF Linac was operated 7 days per week, 24 hours. Approx. 50% of the time was allocated to FEL operation including a large percentage of user time. The FEL requires very stable beam conditions. In its different set-ups, approx. 13,000 hours beamtime were achieved since Based on the TTF experience several FELs using superconducting accelerator technology are proposed week Courtesy M. Minty

TTF OPERATIONS STATISTICS To direct accelerator improvements aimed at increased reliability, the operational statistics at the TTF are now logged on a per-shift basis. Initially these data were compiled to reveal outstanding hardware limitations. As reliability at the TTF continues to improve, correspondingly finer classifications have evolved. In the future, perhaps an automated analysis could be implemented. At present, the TTF operators are requested “to the best of his/hers ability” to classify the time spent during each shift into 1 of 5 categories: CATEGORIES: USERS - beam delivery for experimental programs using the intense SASE radiation (i.e. ABLO, Cluster, RAFEL) STUDIES - all studies pertaining to accelerator development aimed towards quantification and improvement of beam properties (i.e. CSR, BTM, BBA, etc) and /or demonstrating TESLA-like beam conditions (i.e. high charge, high gradient, long pulses, etc.) TUNING - all time spent with beam providing the required condition for the users or accelerator development DOWN - downtime caused by hardware failure or anything else which prohibits operations OFF - time with no beam arising from transitioning between experiments (e.g. ABLO/CLUSTER ), accelerator improvements, and holidays Courtesy M. Minty

TTF operations statistics Focus: rafel,cluster,sfpd How much of the 53% is really available for users (missing pulses)? What caused the downtime? What is the reason for tuning Different machine-setting Drift of the machine More accurate specification of machine status Courtesy M. Minty

DOWNTIME SUMMARY SINCE SHUTDOWN ( ): How do problems occur (once or regular) Courtesy Michiko Minty laser gun Gun vac CC Kly3 Cryo Vacuum

Machine Stability/performance What parameters need to be measured ( slice? ) SASE, Charge, offset/angle (orbit), energy, phases, losses…. What parameters need to be correlated How often do we need to store data (DAQ) Slow drifts (tuning), Fast fluctuations (instability) How flexible do we need to store data ….. ?

Modes of operation Gun/Injector/Analysis/Linac mode (BIS) Down/off/user/study/tuning mode (DOOCS panel) Information availability With mode definition All relevant information is available All important data are saved and easily accessible for data analysis (tools: history plots, correlation) Statistics is kept for logbook Leaving a mode stores changes of relevant parameters and plots in the logbook

Information gathering How to make sure that operators are in the correct mode Wrong mode=wrong information saved Unknown cause of failure/instability Get info from the DAQ (Much work: is it available?) Flexible DOOCS panels/tools for different modes