Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, 2011 10:00 – 11:00am.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Cleco Transmission Planning Summit 2013
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Cleco Transmission Planning Summit 2012
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Utility Engineers, PC.  Generation  Transmission  Distribution.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Company LOGO Cleco Power’s Transmission Planning Summit November 15, 2007.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Freeport Area Master Plan Project -
Sub Station.
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
Status Update for Reliability/Market Power Mitigation Assessment
Compliance Report to ERCOT TAC February 2007
Local Area Planning Update to TRANSAC – June 29, 2017
I-5 Corridor Reinforcement Project
Transmission Planning Summit 2009
Acadiana Load Pocket Project
Strategic Plan and Economic Upgrade Process
Presentation transcript:

Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am

Welcome Terry Whitmore, Mgr- Trans Planning & Operation Support James Simms, Lead Engineer- Transmission Planning Chris Thibodeaux, Sr. Engineer- Transmission Planning Robby Michiels, Sr. Engineer- Transmission Planning Introduction

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

Economic Planning Studies None were requested for 2011

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

Acadiana Load Pocket Project Update

Acadiana Load Pocket

Acadiana Load Pocket Project Year 2010 Progress Report Flanders – Hopkins 138KV Transmission line tapped for new Segura substation. New Segura 230/138KV Cleco substation Phase I completed – 138KV facilities are presently energized – 230KV facility commission is scheduled for the end of second quarter 2011 New Segura – Moril 138KV Transmission line completed & connected to Segura 138KV bus

ALP Project Update – Summer 2010 Cleco- 230KV Segura Substation Cleco- Segura to Moril 138KV Trans. Line (0.2 mi) Note: Hopkins – Flanders 138KV line is tapped for new Segura substation. Just 138KV bus is energized at this point.

ALP Project Update – Summer 2011

ALP Project Update – Summer 2012

ALP Project Update Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

Cleco 2011 Transmission Construction Plan

Budgeted Projects Near term projects deal with Cleco’s obligations to the Acadiana Load Pocket Project and the Reliable operation of the Bulk Electric System.

Cleco 2011 Transmission Construction Plan Budgeted Projects Build a new 230KV Transmission line from Wells to the LUS Labbe Substation Reconductor existing Segura – Hopkins 138KV transmission line (This will complete Cleco’s participation in the ALP project.) Second 230/138KV Autotransformer at Cocodrie Substation 2012 Construction of a new Rork 230KV Substation adjacent to the one at Richard Build a new 230KV Transmission line from Rork to the Sellers Road Substation Construction of a new 230KV Sellers Road Substation Build a new 230KV Transmission line from Sellers Road to the Segura Substation Construction of a new Mansfield Compressor 230KV Substation tapping Dolet Hills – Fisher 230KV line Construction of a new Clarence – Maurice 69KV transmission line Transmission element replacements on Plaisance – Coughlin 138KV transmission line 2011

ALP Project Timeline (All participants) 2011 Cleco- 230KV Sellers Road Substation Cleco- 230KV Rork Substation Cleco- 230KV Rork - Sellers Road Trans. Line (30.1 mi) Cleco- 230KV Sellers Road- Segura Trans. Line (17 mi) Entergy- 230KV Sellers Road- Meaux Trans. Line (8.3 mi) Cleco- 230KV Wells - Labbe Trans. Line (17 mi) Entergy- 230KV Sellers Road - Labbe Trans. Line (14 mi) LUS- 230KV Labbe - Bonin Trans. Line (3 mi) 2012 Cleco- Reconductor 138KV Segura- Hopkins Trans. Line (3 mi) [Serves to enhance the ALP project objectives] Cleco 2011 Transmission Construction Plan

Long Range Planning- 5 years or greater System models used in the analysis go out 5 years and beyond Inputs are extrapolated from short term planning estimates Accuracy is therefore limited Results are given leeway in terms of interpretation Long Term Planning does allow the identification of potential areas of concern Attention is given to those problems that remain consistent over model runs especially those that get closer to the present Typically, there is enough time to develop mitigation plans and fund projects Long Range Planning Analysis has identified some areas of concern These occur at the end of the planning horizon At this time, these areas don’t warrant the outlay of capital but will be noted

Cleco 2011 Transmission Construction Plan Regions in purple indicate potential planning criteria violations Bus Under Voltage

Cleco 2011 Construction Plan 2022 Study Cases Bus under voltage Violations Mitigation: Investigate installation of capacitor banks at Pine Prairie. Pine Prairie 138KV Bus Voltage P.U. Most limiting Contingency: Coughlin – Pine Prairie 138KV Line Oakdale 138KV Bus Voltage P.U. Mitigation: Investigate installation of capacitor banks at Plaisance. Most limiting Contingency: Coughlin – Plaisance 138KV Line Plaisance 138KV Bus Voltage P.U.

Cleco 2011 Transmission Construction Plan Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

New NERC standards mandated Cleco to re-evaluate all 100KV and above Transmission Line Ratings including the following elements: – Breakers – Switches – Conductor – Jumpers – Bus – CT Ratios – Wave Traps – Relay Setting Limits

Results of Analysis Upgrade of multiple lines whose limiting element created base case overloads Since 2010 – Changed Normal Rating temperature basis from 85° to 93°C Increased Normal Ratings – Changed Normal and Emergency Rating procedures for jumpers Increased Normal and Emergency Ratings

Comparison of 2010 to 2011 SPP series of models: – Cleco Transmission lines 100KV or greater 51% had their A rating increase – 8% had their A rating decrease 13% had their B rating increase – 1% had their B rating decease – Cleco Tie Lines 11% had their A rating increase – 49% had their A rating decrease 19% had their B rating increase – 28% had their B rating decrease Refer to the SPP models for specific line ratings

Facility Rating Changes Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

Model Review New Substations in Regional models New 69KV Transmission Line N-1 ACCC Results

Model Review New Transmission Line and Substations in 2011 Regional models Barker’s Corner Youngsville Mansfield Compressor Clarence – Maurice 69KV Line

LAGN : (2011) Barkers Corner 230KV Substation (moving load from other subs) Model Review New Substations in Regional models

Model Review New Substations in Regional models CLECO : (2011) Mansfield Compressor 230KV Substation (Serving projected area load growth )

ENTERGY : (2011) Youngsville 138KV Substation (Moves load off of 69KV System) Model Review New Substations in Regional models

Model Review New 69KV Transmission Line in Regional models Cleco : (2011) Clarence – Maurice 69KV Line

SPP 2011 Series Model ACCC Results Unmitigated Thermal Overloads Champagne – Plaisance 138KV: 120%  Contingency: Cocodrie – Ville Platte 230KV  Models: Summer/Winter 2013, 2017 & 2022  Limiting element resides outside of the Cleco Control Area  Will be monitored in subsequent years

SPP 2011 Series Model ACCC Results Unmitigated Long Range Low Bus Voltages Oakdale & Pine Prairie 138KV : 0.89PU  Contingency: Coughlin – Pine Prairie 138KV  Model: Summer 2022  Long Range Mitigation Plan considers adding capacitor banks at Pine Prairie Plaisance 138KV : 0.885PU  Contingency: Coughlin – Plaisance 138KV  Model: Summer 2022  Will monitor this voltage in future years

Model Review Questions ?

Agenda Introduction Economic Planning Studies Acadiana Load Pocket Project Update 2011 Transmission Construction Plan Facility Ratings Changes Model Review Stakeholder Business Final Questions Adjourn

Stakeholder Business Chance for Stakeholders to bring issues up for discussion

Final Questions?