The Middleware Readiness Working Group LHCb Computing Workshop LHCb Computing Workshop Maria Dimou IT/SDC 2014/05/22.

Slides:



Advertisements
Similar presentations
Operations Coordination Team Maria Girone, CERN IT-ES Kick-off meeting 24 th September 2012.
Advertisements

WLCG Interaction Stefan Roiser LHCb Computing Operations Workshop 27 Jan ‘15.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
HEPiX Orsay 27 th April 2001 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 27 th April 2001 HEPiX 2001, Orsay.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
WLCG Operations Coordination report Maria Dimou / CERN With input and on behalf of the WLCG Operations Coordination team May 2015 GDB CERN indico event.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Unified Middleware Distribution (UMD): SW provisioning to EGI Mario David.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Future support of EGI services Tiziana Ferrari/EGI.eu Future support of EGI.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
Workshop summary Ian Bird, CERN WLCG Workshop; DESY, 13 th July 2011 Accelerating Science and Innovation Accelerating Science and Innovation.
Enabling Grids for E-sciencE System Analysis Working Group and Experiment Dashboard Julia Andreeva CERN Grid Operations Workshop – June, Stockholm.
UK middleware deployment GridPP27 - CERN 15 th September 2011 GridPP27 - CERN 15 th September 2011 Status & plans Jeremy Coles.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
CERN IT Department CH-1211 Geneva 23 Switzerland GT WG on Storage Federations First introduction Fabrizio Furano
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS Overview ROC_LA CERN
Towards a Global Service Registry for the World-Wide LHC Computing Grid Maria ALANDES, Laurence FIELD, Alessandro DI GIROLAMO CERN IT Department CHEP 2013.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons 10/12/2014.
WebFTS File Transfer Web Interface for FTS3 Andrea Manzi On behalf of the FTS team Workshop on Cloud Services for File Synchronisation and Sharing.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT DPM Collaboration Motivation and proposal Oliver Keeble CERN On.
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
WLCG Middleware Support II Markus Schulz CERN-IT-GT May 2011.
Report from the WLCG Operations and Tools TEG Maria Girone / CERN & Jeff Templon / NIKHEF WLCG Workshop, 19 th May 2012.
WLCG Software Lifecycle First ideas for a post EMI approach 0.
Last update 29/01/ :01 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD CERN VOMS server deployment LCG Grid Deployment Board
Last update 31/01/ :41 LCG 1 Maria Dimou Procedures for introducing new Virtual Organisations to EGEE NA4 Open Meeting Catania.
Security Policy Update WLCG GDB CERN, 14 May 2008 David Kelsey STFC/RAL
Julia Andreeva on behalf of the MND section MND review.
The GridPP DIRAC project DIRAC for non-LHC communities.
EMI INFSO-RI European Middleware Initiative (EMI) Alberto Di Meglio (CERN)
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) The Egyptian Grid Infrastructure Maha Metawei
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA3 partner collaboration tasks & process.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Middleware Update Maria Alandes Pradillo.
EMI Inter-component and Large Scale Testing Infrastructure Danilo Dongiovanni INFN-CNAF.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
Testing Infrastructure Wahid Bhimji Sam Skipsey Intro: what to test Existing testing frameworks A proposal.
Components Selection Validation Integration Deployment What it could mean inside EGI
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
The GridPP DIRAC project DIRAC for non-LHC communities.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Implementing product teams Oliver Keeble.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
EGEE-III INFSO-RI Enabling Grids for E-sciencE JRA1 and SA3 All Hands Meeting December 2009, CERN, Geneva Product Teams –
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
SAM architecture EGEE 07 Service Availability Monitor for the LHC experiments Simone Campana, Alessandro Di Girolamo, Nicolò Magini, Patricia Mendez Lorenzo,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX CERN October 5, 2012 CERN 1
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
WLCG IPv6 deployment strategy
EGI Operations Management Board
gLite->EMI2/UMD2 transition
Andrea Manzi, Oliver Keeble
Testing for patch certification
Interoperability & Standards
Operations Officer, EGI
New Types of Accounting Beyond CPU
Andrea Manzi, Oliver Keeble
Presentation transcript:

The Middleware Readiness Working Group LHCb Computing Workshop LHCb Computing Workshop Maria Dimou IT/SDC 2014/05/22

Mandate To ensure that operation won't suffer when a site is called to upgrade Middleware (MW) package X to version Y, i.e. that versions are not only tested and certified internally by the Product Teams (PTs), but also ready to be used in operation at the sites, integrated into the experiment workflows. 2014/05/22 The MW Readiness WG 2

Done so far  Four meetings since 2013/12/12. Issues addressed:meetings  MW PTs use the repository of their choice.  A relationship was established between:  The PTs responsible for a shortlist of MW products that will be used to start with.PTs  The WLCG VOs’ workflows, using these MW products.VOs’ workflows  Volunteer sites participating in this effort which: Volunteer sites  Collaborate with the PTs for testing release candidates  Have expert VO contacts on site. 2014/05/22 The MW Readiness WG 3

Repositories in more detail  The PTs use the repository of their choice. Examples:  EPEL  MAVEN  WLCG  Their product’s web site  EGI-UMD  EMI  A combination of the above 2014/05/22 The MW Readiness WG 4

The shortlist of MW products  We picked dCache, StoRM, EOS, xrootd, DPM, LFC, FTS3, VOMS Client, as a start.  Contacted the PTs who were Very helpful with information about release candidates, testing sites and VOs using their products.  Now expanding the PT table to include ARC CE, CREAM CE, BDII, ARGUS, UI, WN, lcg_utils, gfal2, gfal_utils for a later stage of the Readiness Verification effort.PT table 2014/05/22 The MW Readiness WG 5

The Volunteer sites & the VOs  Experts in the VOs, members of the WG, approached sites where MW products of their choice are tested by the PT, as release candidates.  They documented experiment application programmes to be used for the testing.  The sites prepared a special set-up (details here) for this effort that will appear separately in Monitoring results.here 2014/05/22 The MW Readiness WG 6

Identifying the MW versions running (production & testing)  Proposal & implementation by Lionel Cons (CERN/IT-SDC) (see his presentation at the 4 th meeting of the WG). presentation  Sites report the RPMs they use.  Their RPM version information is stored in a DB.  A sub-set is kept containing the MW packages only used at the site.  What is installed for production (or testing) is checked against a reference (baseline or newer but tested) version.  Tests run all the time, Hammercloud (HC) is recommended.  Test results for release candidates may be distinguished by different site/host/queue names.  Historical version data are kept for 1 year to diagnose the point when good test results change status (turn good/bad or unknown=not tested).  Existing Grid Monitoring technology will be used to evaluate results. The MW Officer examines the output results. 2014/05/22 The MW Readiness WG 7

The WLCG MW Officer (Tasks for operations) This is a new role in WLCG! The MW Officer is Andrea Manzi (CERN/IT-SDC). For versions in operation he will:  Maintain and verify the baseline versions for the MW components  Communicate with sites not compliant with baseline versions  Monitor and liaise with EGI and UMD for matters regarding the WLCG MW and versions 2014/05/22 The MW Readiness WG 8

The WLCG MW Officer (tasks for MW readiness)  Discover new versions ready for entering Readiness verification  Make sure that new release candidate versions of clients are available in the agreed CVMFS area grid.cern.ch  Communicate with Volunteer sites to agree which version is tested at which Volunteer site and by which VO  Monitor results of the Volunteer sites to decide on Readiness of a given release being verified  Decide if versions can enter production at a subset of these sites, if tests should also run under load.  Announce to the WLCG community the Readiness Verification results by maintaining a new extended baseline versions table 2014/05/22 The MW Readiness WG 9

Next steps  The WG members (sites, VOs, PTs) contribute to the Readiness Verification effort, in practice, now that the principles are agreed.  In the next 40 days, we plan to:  Take a product from the PT table.  Work on the detailed set-up with Volunteer sites and VOs.  Develop a prototype of version parsing.  Devise a method to display test results, versions in production, versions of release candidates and to document conclusions. (an Extended Baseline Versions’ table).Baseline Versions’ table 2014/05/22 The MW Readiness WG 10

Documentation & Contact Info  LHCb members in the MW Readiness WG: Joel Closier, Stefan Roiser.  Next meeting: 2014/07/02 at 16:00hrs CEST at CERN (also audioconf). Draft Agenda.Agenda.  Twiki: wareReadiness wareReadiness  E-group: wlcg-ops-coord-wg- 2014/05/22 The MW Readiness WG – M. Dimou 11