1 How to Write an Incremental Funding Modification Sarah Echt May 2004.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
CONTRACT CLOSEOUT NORTH REGIONAL CONTRACTING OFFICE 13 January 2010.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17 th Contracting Squadron 1 Termination of Commercial Contracts.
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
DCAA – WHO WE ARE and WHAT TO EXPECT
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
0 Origin COWC Recommendation: Federal Acquisition Regulations should provide clear policy regarding the use of payment withholds on business system deficiencies.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Contractor Progress HQ PACAF/LGC.
Project Procurement Management
Contract Types. Forms of Contracts Completion – A product is delivered –Cost or Fixed Price –Product must be delivered –Contract completed on delivery.
Contract Administration Chapter 6. Learn. Perform. Succeed. Learning Objectives Determine those contract administration contingency issues most often.
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
Contract price & payment
1 QUALITY ASSURANCE EVALUATOR TRAINING ADVISORY & ASSISTANCE SERVICES CONTRACTS.
Federal Acquisition Regulation (FAR) Part 16 Types of Contracts
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Reimbursements, Reporting & Budget Modifications
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Contract Types PAO Approved SPR Contract Types
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Fulfilling Air Force R&D Mission Needs William H. Anderson Associate.
Federal Acquisition Regulation (FAR) Part 16 Types of Contracts
Local Agency Bonds. Issuing a Bond  The county decides they need an influx of cash and decide to sell bonds in order to achieve this.  Working with.
1 BUYING LIGHTNING DATA LESSONS LEARNED AND FUTURE CHALLENGES TO AVOID ANTI-DEFICIENCY DAN CLEVER DIRECTOR NWS ACQUISITION DIVISION 6/15/05.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Federal Acquisition Service U.S. General Services Administration Best Practices in Leasing Schedule 36 Gary Haag, Ryan Mathews, Shannon Stanford Integrated.
JOB CORPS HELPFUL HINTS FOR ACCELERATED CLOSEOUT Department of Labor.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Rabbanai T. Morgan Chief, Contingency Contracting Element February 2005 Letter Contracts.
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
New Time and Material Requirements Glenn Baer March 2007.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
Click on Next to continue Fixed Price Contracts Cost Reimbursable Contracts Time and Materials Next Involves setting a fixed total price for a defined.
Measurement and Payment
Performance Based Payments And Progress Payments Bryant, Wilson, Wheeler, Lyons October 29, 2015 Overall Classification Unclassified // None.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
U.S. General Services Administration Federal Acquisition Service U.S. General Services Administration GSA Federal Acquisition Service Industry Webinar.
Study 3 – Business Income: The Extended Forms C40 – Business Interruption Insurance.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
Keith M Wilson Director, Education Service U. S. Department of Veterans Affairs February 2009 The Post-9/11 Veterans Educational Assistance Act of 2008.
1 Consent to Subcontract Breakout Session # D12 Name: Rita Wells Daniel Johnson Anthony Simmons Date:July 12, 2011 Time:11:15 – 12:30.
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
Contracting Officer Podcast Slides
Contract Financing.
Treatment of Key Risks under EPC Contracts
Procurement Desktop Defense (PD²) Creating an Indefinite Delivery Contract SPS Spotlight Series February 2014.
Consent to Subcontract
CONTRACT ADMINISTRATION
Drawings Introduction to FIDIC - Drawings -.
Safety Responsibilities
First Article Test (FAT) / Production Lot Test (PLT)
Letter Contracts Rabbanai T. Morgan
Schedule I - Accounts Payable / Other Liability
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
ARCH 435 PROJECT MANAGEMENT
The Federal Financial Report (FFR)
Construction Contract Administration
By:- Puneet Agrawal B. Com (H), CA, LLB Partner Athena Law Associates
Presentation transcript:

1 How to Write an Incremental Funding Modification Sarah Echt May 2004

2 Goals Understand the incremental funding mechanism on your contract Be able to prepare an incremental funding modification

3 Incremental funding and your contract “Limitation of Funds” clause (FAR ) –Implemented by “Implementation of Limitation of Funds” or (old contracts) “Total Sum Allotted” –Cost-reimbursable contracts “Limitation of Government’s Obligation” clause (DFARS ) –Self-implementing –Fixed-price contracts

4 “(b) The Schedule specifies the amount presently available for payment by the Government and allotted to this contract, the items covered, the Government’s share of the cost if this is a cost- sharing contract, and the period of performance it is estimated the allotted amount will cover. The parties contemplate that the Government will allot additional funds incrementally to the contract up to the full estimated cost to the Government specified in the Schedule, exclusive of any fee. The Contractor agrees to perform, or have performed, work on the contract up to the point at which the total amount paid and payable by the Government under the contract approximates but does not exceed the total amount actually allotted by the Government to the contract. (c) The Contractor shall notify the Contracting Officer in writing whenever it has reason to believe that the costs it expects to incur under this contract in the next 60 days, when added to all costs previously incurred, will exceed 75 percent of (1) the total amount so far allotted to the contract by the Government or, (2) if this is a cost-sharing contract, the amount then allotted to the contract by the Government plus the Contractor’s corresponding share. The notice shall state the estimated amount of additional funds required to continue performance for the period specified in the Schedule.”

5 B054 IMPLEMENTATION OF LIMITATION OF FUNDS (FEB 2003) (a) The sum allotted to this contract and available for payment of costs under CLINs 0001 through 0003 through 31 MAY 2004 in accordance with the clause in Section I entitled "Limitation of Funds" is $15,000, (b) In addition to the amount allotted under the "Limitation of Funds" clause, the additional amount of $750, is obligated for payment of fee for work completed under CLINs 0001 through 0003.

6 File Documentation (Tab 1) PR/MIPR (Tab 17) Notification from Contractor [(Tab 50) Acquisition Narrative, if needed] (Tab 55) Buyplan journal (Tab 57) DD Form 350 (Tab 62) The modification (Tab 64) Checklist (from PKC)