Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Midwest Demand Response Initiative Kick-off Meeting Bob Lieberman, Commissioner, Illinois Commerce Commission John Norris, Chairman Iowa Utilities Board.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
Dale Osborn ISU Tour MISO July 18, Oversee the flow of power over the high voltage wholesale transmission system in all or part of 13.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
Sue Sheridan President and Chief Counsel Coalition for Fair Transmission Policy EEI Transmission and Distribution Conference April 2012 TRANSMISSION PLANNING.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Infrastructure, Regulators and Utilities in the World of RTOs and Electricity Markets Steve Gaw, Commissioner, Missouri Public Service Commission President.
Eastern Wind Integration and Transmission Study
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
The Transmission Imperative November 3, 2011 Jay Caspary.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Draft SAWG/RAWG Agenda Survey A Presentation to the MISO Supply Adequacy Working Group by the OMS Resource Adequacy Working Group August 16, 2004.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
Why Should Retail Customers Care About the MISO Market? WIEG Board Meeting November 8, 2007 WIEG Board Meeting November 8, 2007 Submitted by: Kavita Maini,
Updated 1/28/2011.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Transmission Issues & Renewables Perspectives of a Wind Developer.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Wind Management at MISO
Grid Integration of Intermittent Resources
Trends in Generation Dispatch
Operating a modern renewable-based grid
Transmission Planning at PJM Interconnection LLC
MIT tour of the California ISO Control Center March 31, 2015
Key Findings and Resource Strategy
Clair Moeller Mid-Continent ISO
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission

Why this presenation? At prior meeting, several transmission or MISO specific questions were brought up Request was made to learn more about MISO and transmission current events

Agenda Introduce Midwest Independent System Operator - MISO ransmission and electricity prices Current transmission topics – Renewable integration – Cost allocation – Generator retirements

Disclaimers I work at MISO. But this presentation represents my own ramblings, and should in no way be construed as an official MISO presentation. Disclaimer disclaimer. I wrote the above disclaimer. I am not an attorney. I assume no responsibility or liability for any inaccuracies, intended or unintended, contained in the above noted disclaimer.

Oversee the flow of power over the high voltage wholesale transmission system in all or parts of 13 states and the province of Manitoba Provide independent wholesale transmission system access Provide Reliability coordination Operate a day ahead and real time energy market Manage congestion on the grid Set reserve margin requirements for load serving entities Plan Regional transmission expansion Serve as independent market monitor MISO – Plan and Operate the Transmission Grid for most of the Midwest

6 MISO Fast Facts Non-profit organization Voluntary membership Regulated by the Federal Energy Regulatory Commission (FERC) $41 billion energy market 1,896 pricing nodes Governed by independent eight member board About 750 employees Main office in Indianapolis, branch office in St. Paul.

MISO, Entergy, PJM and SPP Footprints 7

8 Real Time Prices – MISO Runs an Energy Market

June 2011 Generator Interconnection Queue Map

Transmission – the Great Enabler Like an interstate highway system, transmission can enable access to lower cost electricity New transmission generally reduces wholesale prices by reducing congestion, improving access to lower cost energy. In aggregate, net benefits increase, but it can create winners and losers There are other benefits beyond lower production costs See simplified example on next slide

Apples and electricity * Imagine 2 valleys, separated by a mountain range. The apples on the west side cost $5/bushel, while the apples on the east side cost $10/bushel. A new highway goes through the mountain, allowing people on the east to buy western apples. The new market price of apples for everyone is $7. Western growers and eastern consumers are happy. Western consumers and eastern producers, not so much. Now substitute the word electricity for apples, and transmission for highway. * At this point please refer to disclaimer on slide 3

Costs and Benefits Of course building that highway or transmission lines is not free If you spend $50 million dollars to build a transmission line that isn’t needed, you don’t produce net benefits, only costs MISO engineers conduct detailed studies of transmission costs and benefits in order to justify whether a line should be built, and optimize location, size, etc

Current Events Integrating renewables into the Grid – Transmission expansion – Integration challenges Cost Allocation (who pays) Generator retirements (EPA, cheap natural gas, aging plants) and its effect on reliability and prices

Transmission Expansion to Integrate Renewable Energy Most states in the MISO footprint have Renewable Portfolio Standards (RPS’s) requiring a certain percentage of renewable energy MISO conducted 2 major studies to determine the amount of transmission needed to meet RPS’s. – Regional Generation Outlet Study (RGOS) – Regional 15 year plan to meet state RPS’s - $15 to $20 billion. – Candidate MVP Study - $5 billion. An in progress, more detailed plan to justify the first phase of new transmission projects to meet RPS standards - $5 billion.

RGOS Study

Candidate MVP Study

Integrating Renewables Renewable Energy Sources (wind, solar) are variable or intermittent To integrate renewables: – Dispatchable Intermittent Resource (DIR) – Improved Forecasting – Benefits of Scale to Smooth Level of Variation – Energy Storage – Manitoba Hydro

Cost Allocation How to pay for regional transmission? Traditionally local area paid for local transmission, or shared with immediate neighbor Hard to make traditional model work for long- distance renewable generation In response, MISO developed the concept of regional Multi-Value Projects (MVP’s) Costs of MVP’s shared across entire MISO footprint

MISO studies more than just transmission As Reliability Coordinator, MISO helps ensure the region has adequate supply of electricity For example, recently, MISO conducted an EPA Regulation Study to determine potential level of generator retirements likely under different EPA regulatory scenarios Summary – New Federal EPA Regulations will not have a dramatic impact on MISO supply, reliability, or prices