DBDP: Experience of Similar Hydropower Projects in Developing Countries Presentation at the U.S.-Pakistan Diamer Basha Dam Project (DBDP) Business Opportunities.

Slides:



Advertisements
Similar presentations
AFD support to geothermal development
Advertisements

1 Creating Opportunities with World Bank Guarantees Banking and Debt Management (BDM) World Bank Treasury January 7, 2010.
Sectoral Approaches to the Post-2012 Climate Change Policy Architecture Jake Schmidt, Director of International Programs Center for Clean Air Policy *******
Cross-Border Funding for Microfinance Results of the CGAP Cross-border Funder Survey 2011.
What is the ADF Partial Risk Guarantee? Partial Risk Guarantees (PRGs), also known as political risk guarantees, cover private lenders and investors against.
Washington DC December 8, 2008 WBG Post-Crisis Response For Public-Private Infrastructure Projects Jyoti Shukla Program Manager Public Private Infrastructure.
EBRD Support for Renewable Energy and Energy Efficiency projects Ian Brown Power & Energy Utilities Team Pristina, 14 May 2013.
Hydropower Development: Experience of Nepal
1 NETLIPSE Zurich 20th October 2008 EIB – Project Cycle.
Sustainable Development: Strategic Focus and Practical Results ADFIAP November Основные принципы деятельности Внешэкономбанк 1.
Energy and Power Projects are the top priority for Pakistan Hydropower plants offer direct investment and other business opportunities for international.
PPP FINANCING ARRANGMENTS – STRUCTURING FINANCE SUCCESSFULLY IMTIAZ HIZKIL ISLAMIC DEVELOPMENT BANK.
Understanding the different Bank Group Guarantee Instruments
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
The World Bank Group Instruments. The World Bank World Bank Group financing and risk mitigation instruments IBRD/IDA MIGAIFC IBRD Loan for middle income.
World Bank Infrastructure Response to the Crisis World Bank Infrastructure Response to the Crisis Overview.
Annual Meeting of the Host Country Committee on Carbon Finance Washington D.C. February 15-16, The World Bank Carbon Funds:
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
The European Bank for Reconstruction and Development: Regional Leader in its Countries of Operations Founded in 1991 after the disintegration of the Soviet.
Financing Urban Public Infrastructure
AFD’s strategy of intervention towards Sustainable Urban Transport in China Herve Breton AFD Shanghai Nov.2008.
IFC Power March 2009 Sarajevo, Bosnia and Herzegovina.
MULTILATERAL INVESTMENT GUARANTEE AGENCY WORLD BANK GROUP 1 MIGA: Managing Risk in a Challenging Environment Pristina, Kosovo, May 2013.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
8th Africa Oil and Gas, Trade and Finance Conference Marrakech, April 2004 APICORP’s Experience & Outlook Nicolas Thévenot Manager – Project Finance.
Current experiences, opportunities and innovations of municipal financing in Ho Chi Minh City, Vietnam Presentation to International Conference on Financing.
Supporting Private Education in Emerging Markets September 2010.
Policies in promoting private finance For Local Government Infrastructure Washington, 01 October 2004 Policies in promoting private finance For Local Government.
Private Sector Operations The AfDB as a Development and Business Partner July 20, 2011.
1 Nam Theun 2 The World Bank Group. 2 Ensuring sponsors’ and lenders’ involvement  A double objective: Satisfy sponsors’ requirements in order to secure.
Inter-American Development Bank June 4, Inter-American Development Bank Private Sector Department Kevin Corrigan Head-Syndications Tel.:
国家开发银行 China Development Bank 1 Overview of China Development Bank March 30, 2010.
1 UN Group Meeting - “Rethinking the Role of National Development Banks” Demian Fiocca Vice President – BNDES December, BNDES:
BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE Javier García M. Deputy Head Investment and.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
New Global Economic Powers and the Environment Dr. Peter Bosshard Policy Director, International Rivers Beijing, April 18, 2011.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Public Private Partnerships (PPPs) and The World Bank
International Seminar on Energy Cooperation in Northeast Asia : Directions and Implementation Korea Energy Economics Institute Financing of Energy Infrastructure.
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
NATIONAL LOAN GUARANTEE FUND FOR SMEs GUARANTEES OF NLGFSME – A WAY FOR FACILITATING THE ACCESS OF SMEs TO FINANCING International Forum for Investments.
Oesterreichische Entwicklungsbank AG - OeEB Austrian Business Circle Belgrade – Sabine Gaber / Head of Investment Finance Department OeEB.
The International Financial Institutions and Nam Theun 2 International Stakeholder Workshops Bangkok, Tokyo, Paris, Washington, Vientiane 31 August-24.
The Global Role of Chinese Dam Builders Presentation by Dr. Peter Bosshard International Rivers IDS Brighton November 25, 2010.
World Bank Group Support for Clean Energy Development Washington, D.C. December 14, 2006 Anil Cabraal Lead Energy Specialist Energy and Water Department.
MEDEF MEETING March 7, 2012 A.T. Shaukat Chief Engineer Global Infrastructure & Natural Resources.
1 The support of the European Investment Bank for EU water and wastewater projects - Lending Policy & Eligibility - Loan approval process Pierre-Emmanuel.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Ngân hàng xuất khẩu CH Séc. How can Czech Export Bank help? „DAY OF VIETNAM“ FINANCING CZECH EXPORTS TO VIỆT NAM.
“Access to electricity is … the connection that’s needed to plug Africa into the grid of the global economy. In partnership with African nations [and the.
Youssef Arfaoui Youssef Arfaoui Danida development Days June 2009 Developing the Energy Sector in Africa Private Sector involvement.
AEBF ANNUAL MEETING India, November 2014 THE VIETNAM DEVELOPMENT BANK- VDB.
An Introduction of Silk Road Fund Dan WANG Executive Vice President Algiers, September 2, 2015 Silk Road Fund - Promoting promoting One Belt and One Road.
Alex Mourant USEPA International Environmental Program Specialist
Kamleshwar Khelawan, Senior Energy Specialist,
7th International Scientific Conference on Energy and Climate Change
EBRD – Supporting SME business
Bonds, Loans & Sukuk Nigeria Briefing Day
EBRD in Greece July 2016.
EBRD in Greece October 2016 Financing Growth
EBRD in Greece July 2016.
He World Bank was created at the 1944 Bretton Woods Conference along with the International Monetary Fund (IMF). The president of the World Bank is, traditionally,
The New Bank and Private Sector Activities
I N S U R I N G I N V E S T M E N T S  E N S U R I N G O P P O R T U N I T I E S
Scaling up Partial Risk Guarantees:
The U.S. International Development Finance Corporation (the “DFC”)
Presentation transcript:

DBDP: Experience of Similar Hydropower Projects in Developing Countries Presentation at the U.S.-Pakistan Diamer Basha Dam Project (DBDP) Business Opportunities Meeting October 8, 2014 Washington, DC by: Mr. Suman Babbar, Senior Advisor, Finance and Mr. Norman A. Bishop, Senior Advisor, Hydro USAID/Energy Policy Program – Pakistan USAID/EPP Implementing Partner: Advanced Engineering Associates International, Inc. – AEAI

A Look at Similar Large Hydro Projects Constructed and under Construction: Financing Features Case Studies: Nam Theun 2, Bujagali, Others Financing of Large Hydro – Key Takeaways Conclusions and Recommendations: The Way Forward for DBDP 1 Presentation Topics 1

Features of World’s Largest Hydro Projects The world’s largest hydro projects (> 4,000 MW) were publicly funded. 2

DBDP & Hydro Projects >3,000 MW under Construction NameCountryRiverInstalled MWEst. Completion Yr. 3

. Some Recent Hydro Projects with PPP Structure 4

Private Sector Nam Theun 2 Hydropower Project (PDR of Laos) MW Bujagali Hydropower Project (Uganda) – 250 MW Others World Energy Council, 2014: Based on public information not validated by the entities. Case Studies 5

US$ 1.45 billion, 1070 MW project in Lao PDR NT2 primarily exports electricity to EGAT of Thailand, with about 5% for domestic use Original concession awarded in 1993 Asian financial crisis: project put on hold ( ) Preparation resumed in 2001 Due diligence undertaken About 4 years’ preparation time ( ) Financial close: June 15, 2005 Project completed on budget and schedule Operational since

NT2 - Financial Structure The finance plan comprises 27 financial institutions: 5 MLAs 4 ECAs 2 BLAs 7 Thai banks 9 international banks Debt Tenor USD 16.5 yrs, repayment in 12 yrs THB 15 yrs, repayment in 10.5 yrs 7

BOOT project on the Nile River in Uganda Run-of-the-river Project cost at approval: US$798 million Debt: Equity ratio of 78:22 leverage Equity:Sithe Global Power - 58%; IPS (Kenya) %; Government of Uganda % WBG investment: − IFC:$100 million A Loan and up to $30 million C Loan − IDA:$115 million Partial Risk Guarantee (PRG) − MIGA:Up to $115 million MIGA Guarantee Other lenders: EIB, AfDB, Proparco, AFD, DEG, KfW, FMO; commercial banks (Absa Capital, Standard Chartered Bank) under IDA PRG Transmission line: Financed by AfDB and JBIC Formal inauguration: October 8, 2012 Bujagali Hydropower Project (250 MW) 8

11,233 MW hydro project in Brazil Limited recourse financing Energy auction April 2010 – concession awarded to consortium led by Norte Energia Eletrobras (state-owned utility holding company) the largest shareholder Financing structure Equity: 20%, Debt: 80% Equity to be provided by winning consortium Debt – BNDES loan of $10.8 billion Completion guarantee by the consortium Other: Belo Monte – Salient Financing Aspects 9

1993 –China Three Gorges Corporation created China State Development Bank loan of $3.6 billion Support from Three Gorges Construction Fund and revenue from Gezhouba Hydro 2002 – China Yangtze Power Company created 2003 – IPO by CYPC ECA support from most of the developed countries and Brazil Revenue levy dedicated to Three Gorges 10 Other: Three Gorges - Salient Financing Aspects

Objective Use Value Engineering (VE) to improve DBDP’s best value for least cost without changing project function (# MW and projected energy): −Reduce costs, schedule and construction risk −Seek project revenues at earliest date to reduce escalation and IDC −Reduce financing cost −Obtain the best overall value for the money spent −Minimize possibility of project budget cost increases Methodology Analyze each element of the project: VE analysis conducted on each element and its relationship to the precedent element Cost basis critical path method scheduling: to analyze the cost for each schedule task A risk assessment performed: to understand how each element or task affects others over time until final project commissioning DBDP: Best Value Analysis 11

Financing of Large Hydros: Key Takeaways In most cases an anchor financier: e.g., ₋ BNDES (Brazilian Development Bank) for large private hydros ₋ World Bank for Dasu Long tenor funding mobilized Key role played by Export Credit Agencies Varied approaches to equity financing Effective management of social and environmental aspects critical 12

GOP fully committed Strong economic rationale – − Power generation, flood control and irrigation − Improved downstream generation Ongoing infrastructure development Existing framework for private sector participation in power generation GOP open to flexible approach to attract private sector participation during dam construction Key Supporting Factors for Development Diamer Basha Dam Project: The Way Forward 13

Needs: A dedicated, qualified implementation team, preferably via a separate corporate entity Excellent project and construction management team capabilities, experienced in large hydro projects Compliance with international social & environmental standards Conclusions and Recommendations: The Way Forward for DBDP 14

Needs, cont.: A clear national financing strategy defined, prioritizing all national infrastructure projects competing with DBDP Financing advisors with international experience hired An anchor financier identified A clearly articulated incentive framework implemented to encourage private participation Conclusions and Recommendations: The Way Forward for DBDP 15

Thank you! 16

Source: The Financing of Water Infrastructure - A Review of Case Studies by Chris Head for The World Bank,