PRIMARY VALIDATION OF WATER LEVEL DATA OBSERVED DATA MAY BE SUBJECTED TO ERRORS *RANDOM, SYSTEMATIC AND SPURIOUS *AIM OF VALIDATION IS TO DETECT SYSTEMATIC.

Slides:



Advertisements
Similar presentations
Chapter 14: Usability testing and field studies
Advertisements

Real-time Data Collection in Flood Warning Systems
ENTRY OF FLOW MEASUREMENT DATA
SECONDARY VALIDATION OF WATER LEVEL DATA (1) PRIMARY VALIDATION: –BASED ON KNOWLEDGE OF INSTRUMENTATION AND METHODS OF MEASUREMENT WITH ASSOCIATED ERRORS.
COURSE COORDINATOR: DR. J. O. ADEJUWON OFFICE LOCATION: ROOM B203, COLERM BUILDING OTHER LECTURERS: DR. GRACE O. OLUWASANYA.
PRIMARY VALIDATION - RAINFALL DATA DATA VALIDATION *FINAL VALUE STORED IN “HIS” IS BEST REPRESENTATION COMPREHENSIVE MANUAL VALIDATION *PROHIBITIVE IN.
CHAPTER FOUR Stream flow measurement
Water Budget III: Stream Flow P = Q + ET + G + ΔS.
RECORD COMPUTATIONS 1.) THE USE OF DATUM CORRECTIONS
“Eternity begins and ends with the ocean's tides.”
All critical-flow devices determine flow rate by measuring one or more water levels and computing flow from a calibration equation. Water Level Sensors.
CHAPTER FIVE STREAM FLOW AND RAINFALL RUNOFF
Hydrological Information System Module 20 – Integrated Reservoir Monitoring System.
SECONDARY VALIDATION - RAINFALL DATA PRIMARY VALIDATION ALREADY DONE *ON INDIVIDUAL STATION BASIS SECONDARY VALIDATION *IDENTIFY SUSPECT VALUES BY HAVING.
STREAMFLOW and HYDROGRAPH ANALYSIS
Model calibration and validation
Selection of measuring instruments
Stage – Discharge Rating Numerical relationship between water elevation (stage) and discharge at a location in a flowing system. Expressed as an equation,
1 Seventh Lecture Error Analysis Instrumentation and Product Testing.
Classification of Instruments :
Hydrology and Water Resources RG744 Institute of Space Technology December 11, 2013.
Module 10/11 Stream Surveys Stream Surveys – February 2004 Part 3 – Hydrologic Assessment.
Water Quality Monitoring and Parameter Load Estimations in Lake Conway Point Remove Watershed and L’Anguille River Watershed Presented by: Dan DeVun, Equilibrium.
RATING CURVE VALIDATION (1) WHEN VALIDATION: –ON FITTED RELATION –WHEN NEW GAUGINGS BECOME AVAILABLE TO TEST CHANGE IN RATING *AT LEAST 6 GAUGINGS AT STABLE.
CE 397 Midterm Slides Review Slides for the Midterm Exam David Maidment Spring 2015.
Validity and Reliability Dr. Voranuch Wangsuphachart Dept. of Social & Environmental Medicine Faculty of Tropical Medicine Mahodil University 420/6 Rajvithi.
V. Rouillard  Introduction to measurement and statistical analysis ASSESSING EXPERIMENTAL DATA : ERRORS Remember: no measurement is perfect – errors.
B M K G Darman Mardanis, SE Stasiun Klimatologi Pondok Betung BMKG.
National Weather Service River Forecast System Model Calibration Fritz Fiedler Hydromet 00-3 Tuesday, 23 May East Prospect Road, Suite 1 Fort.
Smart transmitters.
Hydrologic Modeling: Verification, Validation, Calibration, and Sensitivity Analysis Fritz R. Fiedler, P.E., Ph.D.
COMPUTATION OF DISCHARGE DATA GENERAL: –DISCHARGE CANNOT BE MEASURED DIRECTLY AND CONTINUOUSLY –STAGE MEASUREMENTS h(t) ARE MADE CONTINUOUSLY OR AT FIXED.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Lecture 3 Mechanical Measurement and Instrumentation MECN 4600 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus.
Channel Routing Simulate the movement of water through a channel
Lecture I Sensors.
Afghan Water Task Progress Report September 7, 2006 EROS Data Center, Sioux Falls, SD Gregg J. Wiche Doug G. Emerson U. S. Geological Survey Bismarck,
INTRODUCTION TO ENGINEERING TECHNOLOGY SEVENTH EDITION ROBERT J. POND & JEFFERY L. RANKINEN Chapter 7 The Technical Laboratory.
Module 1: Measurements & Error Analysis Measurement usually takes one of the following forms especially in industries: Physical dimension of an object.
Basic Hydrology: Gauge Analysis. Gage Analysis Gage analysis is use of historical records to construct a frequency curve for a gauging station. This frequency.
Hydrology of Inland Flooding  Stream Gauges  Hydrologic Forecast Process  Forecast Considerations  Forecast Hydrographs 3-1.
Fritz Fiedler Calibration 2290 East Prospect Road, Suite 1 Fort Collins, Colorado National Weather Service River Forecast System Cooperative Program.
RAINFALL DATA ENTRY - IMPORTANT POINTS DATA ENTRY - FIRST STEP *SUBSEQUENTLY -VALIDATION, PROCESSING, REPORTING AT SUB-DIVISIONAL OFFICES *CLOSER INTERACTION.
Applied Hydrology RSLAB-NTU Lab for Remote Sensing Hydrology and Spatial Modeling 1 Streamflow Measurement and Calculation Professor Ke-Sheng Cheng Dept.
STREAMFLOW and HYDROGRAPH ANALYSIS Stream flow is one of the most important topics in engineering hydrology because it directly relate to water supply,
Hydrology and Water Resources RG744 Institute of Space Technology November 13, 2015.
ERT 246 Hydrology & Water Resources Eng.
EKT 314/4 WEEK 2 : CHAPTER 1 INTRODUCTION TO EI ELECTRONIC INSTRUMENTATION.
Case Lamong River Flood Problem Form (A): Inundation (a) Cause (B): Direct rainfall (a) Flood discharge from upstream runoff (b) Duration (C): Rapid on-set.
Quality is a Lousy Idea-
SUR-2250 Error Theory.
MECH 373 Instrumentation and Measurement
Hydrological Information System
Instrumentation Malfunctions, Test Review - Agenda
Water Budget III: Stream Flow
Basic Hydrology & Hydraulics: DES 601
Hydrological Information System
INTRODUCTION TO ELECTRONIC INSTRUMENTATION
Quality is a Lousy Idea-
Integrated River Basin Management Tools and methods for IRBM Monitoring, Acquisition and processing of Water Resource Data.
CHAPTER FOUR Stream flow measurement
5.3 Using Derivatives for Curve Sketching
Digital Chart Recorder Operation
(with ) by clicking on it and then
CHAPTER FOUR Stream flow measurement
CHAPTER FOUR Stream flow measurement
Measurements & Error Analysis
Survey Networks Theory, Design and Testing
Presentation transcript:

PRIMARY VALIDATION OF WATER LEVEL DATA OBSERVED DATA MAY BE SUBJECTED TO ERRORS *RANDOM, SYSTEMATIC AND SPURIOUS *AIM OF VALIDATION IS TO DETECT SYSTEMATIC ERRORS & SPURIOUS VALUES WATER LEVEL DATA *ELEVATION OF WATER SURFACE W.R.T CERTAIN DATUM *BASIC DATA REPRESENTING THE STATE OF A WATER BODY *USED FOR COMPUTATION OF DISCHARGES USING STAGE-DISCHARGE RELATIONSHIPS *QUALITY OF STAGE DATA INFLUENCES RELIABILITY OF DISCHARGE DATA DIRECTLY *OTHER USES - NAVIGATION, INUNDATION, RESERVOIR LEVELS ETC. OHS - 1

PRIMARY VALIDATION - AT SUB-DIV. DPCs –DATA COMPARISON AT SINGLE STATION *INDIVIDUAL OBSERVATION & PRE-SET DATA LIMITS MAXIMUM & MINIMUM UPPER & LOWER WARNING LEVELS MAXIMUM RATE OF RISE AND FALL *TWO MEASUREMENTS OF A VARIABLE MANUAL OBSERVATIONS & AUTOMATICALY RECORDED OHS - 2

EQUIPMENT & OBSERVATION METHODS SOURCES OF ERRORS *METHOD OF MEASUREMENT *TYPICAL ERRORS IN EQUIPMENT OR TECHNIQUE DATA VALIDATION EXERCISE *NOT TO BE PURELY STATISTICAL *FIELD PRACTICES MUST BE CLEARLY UNDERSTOOD *AWARENESS ABOUT THE DISTURBANCES ALONG RIVER SIDES THREE BASIC EQUIPMENT *STAFF GAUGE *AUTOGRAHIC RAINGAUGE *DIGITAL RECORDER OHS - 3

STAFF GAUGE INSTRUMENT & PROCEDURE *PRIMARY MEANS OF MEASUREMENT *ZERO OF GAUGE FORMS THE DATUM AT STATION *OTHER AUTOMATIC GAUGES ARE CALIBRATED & CHECKED AGAINST STAFF GAUGE TYPICAL ERRORS *MISPLACEMENT OF DECIMAL POINTS 0.01, 0.10 *4.12, 4.10, 4.9, 4.6, 4.3, 4.1, , 4.10, 4.09, 4.06, 4.03, 4.01, 3.99 OHS - 4

DATA “ESTIMATED” BY OBERVERS ESTIMATION BY FABRICATION –WITHOUT VISITING THE STATION *MAY SHOW UP AS INCONSISTENT HYDROLOGICAL SEQUENCES ABRUPT FALL OR CHANGE IN SLOPE OF A RECESSION CURVE LARGE PERIODS OF UNIFORM LEVEL FOLLOWED BY DISTINCT FALL UNIFORM MATHEMATICAL SEQUENCES - FALL BY 0.05 TO 0.10 OHS - 5

AUTOMATIC WATER LEVEL RECORDER INSTRUMENT & PROCEDURES –VAST MAJORITY OF AGR *FLOAT & PULLEY WITH STILLING WELL *CHART IS CHANGED - DAILY/ 7-DAILY TYPICAL ERRORS –INSTRUMENT MALFUNCTION *CHART TRACE GOES UP WHEN THE RIVER GOES DOWN *FLOOD HYDROGRAPH TRUNCATED *STAFF GAUGE AND CHART DISAGREE *CHART TIME & CLOCK TIME DISAGREE –PARTIAL BLOCKAGE IN STILLING WELL *SERIOUS SYSTEMATIC ERRORS OHS - 6

DIGITAL WATER LEVEL RECORDER FLOAT TYPE *MECHANICAL LINKAGE REPLACED BY SHAFT ENCODER ELIMINATES MECHANICAL LINKAGE ERRORS PEN TRACE ERRORS *IN STILLING WELLS PRESSURE TRANSDUCER TYPE *WITHOUT STILLING WELL *ERRORS ASSOCIATED WITH STILLING WELL ARE AVOIDED *DATA CORRUPTION IS POSSIBLE DUE TO OTHER ELECTRONIC OR SENSOR’S MALFUNCTIONING STAFF GAUGE DATA IS USED AS BASE OHS - 7

OHS - 12 OHS - 8

OHS - 13 OHS - 9

OHS - 10

OHS - 11

OHS - 12

OHS - 13

OHS - 14