BE-ABP-Group Meeting ABP Group 1 ABP group structure Main goals for this meeting: Excuse for getting together in mid-term + LHC and project update + administrative.

Slides:



Advertisements
Similar presentations
Position of the Czech Republic on the European Strategy in Particle Physics Current main activities in particle physics * Plans for the future Recommendations.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Roundtable Discussion on Future Machines – Quy Nhon, Participants: Roy Aleksan, CEA, Chair of ESGARD Alain Blondel, Professor of particle physics.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
BE-ABP-Group Meeting ABP Group 1 Administrative News Main goals for this meeting: Excuse for getting together in mid-term + LHC and project update + administrative.
LHC Machine Upgrades L. Ponce On behalf of the LHC Operation Team 1.
Summary and outcome of the 1st LIU-HL-LHC brainstorming meeting (24 th June 2011) Mike Lamont This event is jointly organized by the HL-LHC and LIU projects.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
The FCC Magnet Program: Challenges and Opportunities for HTS
CLIC detector & physics study “news from the ET ” Lucie Linssen L. Linssen, IB meeting, 18 April
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
Future Accelerators at the High Energy Frontier
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
BE/ABP Group Meeting 2015 G. Arduini 17/09/2015 ABP Group Meeting G. Arduini2.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
FCC Accelerator Studies Daniel Schulte for the FCC team LCWS 214, Belgrade October 2014.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
CERN Report (II) Rolf-Dieter Heuer ECFA Meeting Frascati 1 July
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
The CERN Roadmap Frédérick Bordry
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
Hadron Synchrotron Incoherent effects section – 1 st meeting January 14 th, 2016.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
J.-P. Riunaud AB/ABP ABP Group Meeting ABP Group Meeting 1 1. The ABP Group in What will happen 2004.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Machine Progress Towards Higher Luminosity Frank Zimmermann CMS Upgrade Meeting FNAL, Chicago, 7 November 2011 (via EVO) Thanks to Martin Aleksa, Gianluigi.
Glion Colloquium / June CERN Long-Term Plan CERN Long-Term Plan Accelerating Science and Innovation R.-D. Heuer, CERN HiLumi Kick-Off, 18 Nov 2011.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
The Update of the European Strategy for Particle Physics and first Steps for its Implementation M. Krammer (chairman of ECFA) HEPHY, Vienna, Austria INSTR14,
CERN-US Relations and the LHC Program Rüdiger Voss Head of International Relations, CERN USLUA Annual Meeting, Argonne| November 12-14, 2014.
The Linear Collider Roadmap IWLC2010 CERN October 18, 2010 Rolf-Dieter Heuer CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Glion Colloquium / June CERN Report CERN Report Accelerating Science and Innovation R.-D. Heuer, CERN ECFA meeting, PSI, July 19, 2012.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
Status and Outlook of the LHC
ICE SECTION The coolest place to be! Elias Métral
1st FCC Infrastructure & Operation meeting
The European Strategy for Particle Physics
AB-ABP Group Meeting Introduction and motivation
LHC schedule.
20th Hadron Synchrotron Incoherent effects section meeting
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Lecture 2 Live Feed – CERN Control Centre
Future Collider Projects at CERN
BE/ABP Group Meeting 2017 G. Arduini.
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Machine Progress Towards Higher Luminosity
New Group Structure (from 1/2/2007)
CSP Meeting CERN CERN Accelerators in th November 2010
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

BE-ABP-Group Meeting ABP Group 1 ABP group structure Main goals for this meeting: Excuse for getting together in mid-term + LHC and project update + administrative news HL-LHC Project Information Operation Progress Overview of activities from the section leaders BBQ and drinks Administrative news BE-ABP group meeting; European Strategy Update

Increase beam energy to 4 TeV  Reduce  * to 0.6m (tighter collimator settings)  Stay at 50ns bunch spacing (no e-cloud and high brightness beams)  Maximum luminosity : from to cm -2 s -1 Deliver 5 fb -1 by June in time for ICHEP  Confirmation of Higgs indication of 2011 run Deliver 15 fb -1 by end of 2012 to IP1and IP5 at 4 TeV  5  discovery of Higgs if it is there Ion Experiments (ALICE & others…)  p-Pb run in 2013 Chamonix 2012: main goals for the year BE-ABP group meeting; ABP Group 2 ( ✔ 2012 BBQ) ✔ ✔ (deliverd 23fb -1 )

2010: 0.04 fb -1  7 TeV CoM  Commissioning 2011: 6.1 fb -1  7 TeV CoM  … exploring the limits 2012: 23.3 fb -1  8 TeV CoM  … production Integrated luminosity BE-ABP group meeting; ABP Group 3

Peak performance – the numbers Energy [TeV]4.0 Beta* [m] IP 1,2,5,80.6, 3.0, 0.6, 3.0 Bunch spacing [ns]50 Normalized emittance [microns]~2.5 start of fill Bunch intensity [protons per bunch]1.6 – 1.7e11 Number of bunches collisions/IP1&5 Stored energy [MJ]~140/beam Peak luminosity [cm -2 s -1 ]7.73e33 Pile-upmean ~30 peak ~40 BE-ABP group meeting; ABP Group 4

Impressive performance after only 3 years of operation! BE-ABP group meeting; Performance: ABP Group 5 Max. luminosity in one fill237 pb -1 Max. luminosity delivered in 7 days1350 pb -1 Longest time in stable beams (2012)22.8 hours Longest time in stable beams for 7 days 91.8 hours (55%) 77% of design luminosity: - 4/7 design energy - nominal bunch intensity++ - ~70% nominal emittance - b * = 0.6 m (design 0.55 m) - half nominal number of bunches

Bunch spacing [ns] Protons per bunch [ppb] Norm. emittance H&V [microns] Exit SPS x x N.B. the importance of 50 ns in the performance so far. This at the expense of high pile-up. (And they are in the process of re-inventing themselves again) N.B. the importance of 50 ns in the performance so far. This at the expense of high pile-up. (And they are in the process of re-inventing themselves again) Performance from the Injectors in 2012: BE-ABP group meeting; ABP Group 6

Proton-Pb run in BIG CONGRATUJLATION TO EVERYBODY !!! (LHC AND INJECTOR COMPLEX)

LS3 Installation of the HL-LHC hardware BE-ABP group meeting;

HL-LHC News: 10 WP2 Coordination:  Stephane Fartoukh stepped down as WP2 coordinator in 2013  Gianluigi Arduini accepted to take on this role  Optics well advanced  decision to merge Task 2.2 and 2.3 with Massimo as TL  Bernhard Holzer stops as WP2 Task leader and takes on new responsibility as Plasma Network coordinator BE-ABP group meeting; Review of the LIU and HL-LHC Upgrade Plans:  planned for October 2013 (machine & experiments)  review upgrade plans in view of LHC Run-I experience  timing, length and number of shutdown

European Strategy Update: 11 On 30 May, at a special meeting hosted by the European Commission in Brussels, the CERN Council formally adopted the update of the European Strategy for Particle Physics. 1.The LHC including its luminosity upgrade receive highest priority 2.Physics potential of future Linear Colliders is also well recognized in the Strategy statements 3.“Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update” and “CERN should undertake design studies for accelerator projects in a global context, with emphasis on proton-proton and electron-positron high-energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high-gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide.” BE-ABP group meeting;

Future Project Studies and R&D Proposals: 12 Long list of potential activities for the ABP Group – not complete: 1. LHC 2. HL-LHC and LIU 3. HE-LHC (within existing LHC tunnel) 4. LHeC, SAPPHIRE and ERLs 5. VHE-LHC (based on a new 80km to 100km tunnel) 6. Linear Collider: ILC & CLIC 8. TLEP (based on a new 80km to 100km tunnel) 9. LEIR Biomedical applications and new ion species (e.g. NA61 etc.) 10. ELENA, HIE-ISOLDE, 11. Plasma acceleration 12. Neutrino projects 13. Muon colliders etc... BE-ABP group meeting; Need to find efficient structure for incorporating these proposals in ABP studies over the next couple of years  until LHC results at 13 TeV CM define more clearly the direction

ABP Group 13 Group Structure Departures from the Group:  Mobility: Ralph Assmann left for DESY in July 2012  Stefano Redaelli took over as LHC Collimation Project Leader Edgar Mahner left for FAIR in April 2013 Christophe Podevin will leave CERN September 2013  Retirements: Jean-Paul Soucherey left CERN in 2011 (SLS retired in Nov. 2012) Jean-Luc Nougaret took early retirement in 2012  Ghislain Roy joined the ABP group in 2013 Bernard Jeanneret: will leave in September 2013 Christine Petit-Jean-Genaz: will leave in December 2013 (already no longer at CERN due to SLS) Stephan Maury: will leave beginning 2014 (SLS -> January 2015)  Christian Carli took over as ELENA Project Leader as of 2013 BE-ABP group meeting;

ABP Group 14 Group Re-Organization Sections:  Organization by expertise rather than machines & projects  need to cover many options for future activities  requires structure that allows flexibility and room for new studies  horizon of end 2015 when LHC should provide results from operation at high energy BE Workshop:  Mandates for Section leaders  DH and GL received mandate until end of 2015 (end of DG term)  ABP will introduce with the new structure SL mandates (end 2015)  Fits to expected timeline for updated LHC results and new DG BE-ABP group meeting;

IPAC - Jacow: C. Petit-Jean-Genaz Group Leader: O. Brüning 11 Deputy GL: G. Arduini LMC Administrative support: D. Missiaen Group Secretary: D. Rivoiron SU Large Scale Metrology HSL Hadrons Sources & Linacs ICE Impedance & Collective Effects LIS LHC Injector Synchrotrons LCU LHC Commissioning & Upgrade CC3 CLIC & CTF3 D. MissiaenR. Scrivens MS E. MétralG. Arduini LMC M. Giovannozzi 7 R. Corsini 14 A. Behrens T P. Bestmann A. Beynel P. Dewitte T. Dobers A. Froton J.F. Fuchs J.C. Gayde A. Herty M. Jones F. Klumb H. Mainaud-Durand A. Marin D. Mergelkuhl C. Podevin M. Rousseau P. Sainvitu M. Sosin M. Tortrat M. Troillet 21 member P. Andersson G. Bellodi MS S. Bertolo D. Kuchler MS J.B. Lallement MS J. Lettry A. Lombardi 1, MS (E. Mahner) C. Mastrostefano T, MSI M. O’Neil T, MS F. Wenander MS 11 member O. Berrig W. Herr K. Li (Feb. 2013) T. Pieloni G. Rumolo MS, 2 B. Salvant MS F. Schmidt E. Wildner 4 9 member E. Benedetto M. Bodendorfer C. Carli MS, 15 S. Gilardoni MS, 5 S. Maury 6 I. Papaphilippou MS G. Sterbini 8 member R. Bruce (Dec. 2012) H. Burkhardt 9, 10, 18 R. De Maria 16 L. Deniau 3 S. Fartoukh 17 B. Holzer LMC J. Jowett 12 S. Redaelli 8, 19 A. Rossi G. Roy R. Tomas F. Zimmermann 13, MD 12 member J.B. Jeanneret T A. Latina I. Papaphilippou MS G. Rumolo D. Schulte P. Skowronski R. Tomas 6 member

Group Leader: O. Brüning 11 Deputy GL: G. Arduini LMC Administrative support: D. Missiaen Group Secretary: D. Rivoiron SU Large Scale Metrology HSL Hadrons Sources & Linacs HSC Hadron Synchrotrons Collective effects HSS Hadron Synchrotrons Single particle dynamics LAT Lepton Accelerators & Test Facilities D. MissiaenR. Scrivens MS E. MétralM. Giovannozzi 7 R. Corsini 14 A. Behrens T P. Bestmann A. Beynel P. Dewitte T. Dobers A. Froton J.F. Fuchs J.C. Gayde A. Herty M. Jones F. Klumb H. Mainaud-Durand A. Marin D. Mergelkuhl C. Podevin M. Rousseau P. Sainvitu M. Sosin M. Tortrat M. Troillet 21 staff P. Andersson G. Bellodi MS S. Bertolo D. Kuchler MS J.B. Lallement MS J. Lettry A. Lombardi 1, MS C. Mastrostefano T, MSI M. O’Neil T, MS F. Wenander MS 11 staff E. Benedetto O. Berrig M. Bodendorfer C. Carli MS, 15 W. Herr K. Li (Feb. 2013) T. Pieloni G. Rumolo MS, 2 B. Salvant MS F. Schmidt G. Sterbini E. Wildner 4 13 staff R. Bruce (Dec. 2012) H. Burkhardt 9, 10, 18 R. De Maria 16 L. Deniau 3 S. Fartoukh 17 S. Gilardoni MS, 5 J. Jowett 12 S. Redaelli 8, 19 G. Roy A. Rossi R. Tomas F. Zimmermann 13, MD 12 staff B. Holzer LMC J.B. Jeanneret T A. Latina I. Papaphilippou MS G. Rumolo D. Schulte P. Skowronski R. Tomas Add activities related to Plasma acceleration, LEP3, TLEP, LHeC and ERL studies to this section 8 staff

Functions LMC: LHC Machine CoordinatorMS: Machine Supervisor MSI: Machine SuperintendentT : TSO (1): LINAC4 Dep. Project Leader(2): PS-SPS Complex Machine Development Coordinator (3): MADX Custodian(4) EuroNu Beta-Beams WP Leader (5): MTE Beam Commissioning Coordinator, PS- LIU project coordinator(6): ELENA Project Leader (7): MTE Project Leader (8): Collimation Project Leader (9): LHC Background WG Coordinator(10): Computer Administration (11) HL-LHC Deputy Project Leader(12): Ion Machine coordinator (13): EuCard Coordinator, MD:LSWG Coordinator(14): CLIC-CTF3 Collaboration Spoke-person (15): ELENA Deputy Project Leader (16) : SixTrack Custodian (17): HL-LHC WP2 Coordinator(18) : HL-LHC WP8 Coordinator (19): HL-LHC WP5 Coordinator * Part Time

Administrative News: 18 CERN Staff numbers:  reached target of 2250 staff members  allows replacement of retired staff ✔  allocation of Flexibility posts in 2012 ✔ Indefinite Contract Policy:  CERN requested to have not more than 1750 IC posts  we have currently 1782 IC posts at CERN  impact on LD2IC conversion!  2012 Flexibility posts (LD contracts)  can not hope for higher than 40% capture rate over the next three years! BE-ABP group meeting;

ABP Group 19 BBQ Many thanks to our volunteers who agreed to prepare and setup the BBQ:  Getting the goods: Thanks to all section leaders and Delphine  Preparation and setting up. Big thanks to: Delphine Rivoiron, all section leaders, Androula Alejou, Elena Benedetto,Vincenzo Forte, Miriam Fitterer, Nicolas Mounet, Daniel Mirarchi, José Abelleira Guido Sterbini, Michael Bodendorfer, Christian Carli, Ghislain Roy, Elena Quaranta BE-ABP group meeting;

ABP Group 20 BBQ BBQ area in Prevessin: Bldg 972 BE-ABP group meeting;