Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Planning for fish bearing waters between Glen Canyon Dam and Lake Mead.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Housatonic River Case Study Melissa Grader U.S. Fish and Wildlife Service.
Wetland Functions and Values Fundamentals for Conservation Commissioners Training Program - Unit 5 Fundamentals for Conservation Commissioners Training.
Narragansett Bay Estuary Program Narragansett Bay CCMP  Original done 1992  Stakedholder-developed goals, objectives, actions  Many key actions implemented.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Approaches to Establish Minimum Flows to Bays and Estuaries Paul Montagna Marine Science Institute University of Texas at Austin Port Aransas, Texas.
Wild and Scenic Rivers “ LESSONS LEARNED TO AVOID LITIGATION”
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Watershed Management in MA The Deerfield River Watershed Action Plan Kate Crawford, River Corridor Management, October 10, 2005
Protecting Lake Water Quality & Aquatic Habitat from Effects of Lakeshore Development Kellie Merrell Lakes & Ponds Management & Protection Section VT Agency.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
Decommissioning and Site Restoration of Non-Federal Hydroelectric Projects John A. Schnagl Federal Energy Regulatory Commission (202)
Freshwater Fishery Management Objective- Discuss the lake habitat to include basic fishery management techniques.
Hydrologic Issues in Mountaintop Mining Areas Ronald Evaldi, USGS-WSC, Charleston, WV Daniel Evans, USGS-WSC, Louisville, KY Hugh Bevans, USGS-WSC, Charleston,
JT Petty: WMAN 445 Lecture Notes Lecture 5.2: STATE POLICY.
Environmental Flows Eric S. Hersh CE397 November 10, 2005 (National Geographic)
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
Water Quality Standards, TMDLs and Bioassessment Tom Porta, P.E. Nevada Division of Environmental Protection Bureau of Water Quality Planning.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Farm Ponds and Fish and Wildlife
St. Johns River Water Management District Special Publication SJ97-SP8 Water Management Alternatives: Effects on Lake Levels and Wetlands in the Orange.
Vermont Community Development Association March 14, 2007 Hydro-electric in your community The Cutting Edge.
Water Power By: Andrew Paulshock.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
USDA Natural Resources Conservation Service “Helping people help the land"
“The minimum flow for a given watercourse shall be the limit at which further withdrawals would be significantly harmful to the water resources or ecology.
Lake Raleigh Wetland Creation Feasibility Study NC State Centennial Campus Melanie Carter, Jennifer Burdette, Amanda Jones.
Clean Water Act Mrs. Perryman Mrs. Trimble. Clean Water Act “Restore and maintain the chemical, physical and biological integrity of the Nation’s waters”
Level Mode of Lake Baikal Measures to counteract the negative effects of hydropower development on fisheries Government of the Republic of Buryatia Ministry.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
Water Quality Certification for hydropower licensing in Wisconsin.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
The Fish and Game Commission has designated the states portion of the South Bay Salt Ponds an Ecological Reserve. Planning for the management of Ecological.
Permitting Workshop 310 Permit AMFM Conference Fairmont Hot Springs Mar 15,2016 Karl Christians DNRC CDB
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
1 How the Water Board Protects California’s Water Quality Kate Hart, Board Member Chair Central Valley Regional Water Quality Control Board.
permitting.
Restoration of the Swan Pond Embayment Michelle Cagley, Tennessee Valley Authority.
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Native and Wild Trout Conference April 21, 2016 Phoenix AZ
Integrating Wetlands and Watershed Management: Lessons from the U.S.
Environmental Flow Protection in TCEQ Permitting
Hudson Wetlands Protection Bylaw
36 CAs across Ontario (mainly in the south)
DG Environment, Nature Protection Unit (D3)
Presentation transcript:

Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources

Hydropower in Vermont Licensed – 59 (662 MW) –40 comply with WQS –19 to be addressed through relicensing Exempt – 15 (14 MW) –13 comply with WQS –2 to be addressed through WQS Unlicensed – 21 (26 MW) –3 comply with WQS –18 to be addressed through state authority 95 Operating Facilities

Vermont Hydroelectric Facilities

The Relicensing Team Dept. of Environmental Conservation – Water Quality Division –Hydrology (Team Leader) –Wetlands, Lakes, River Corridor Management Dept. of Fish and Wildlife –Fisheries –Wildlife –Non-game and natural heritage Division for Historic Preservation (SHPO) U.S. Fish and Wildlife Service

Vermont Water Quality Standards Hydrology –Policy –Criteria –ANR Procedure Class B Waters –Management Objectives –Criteria

Hydrology Policy “The proper management of water resources now and for the future requires careful consideration of the interruption of the natural flow regime and the fluctuation of water levels resulting from the construction of new and the operation of existing dams, diversions, and other control structures.” “These rules … provide a means for determining conditions which preserve, to the extent practicable, the natural flow regime of waters.”

Hydrology Criteria Flows “Any change from the natural flow regime shall provide for maintenance of flow characteristics that ensure the full support of uses and comply with the applicable water quality criteria.” “In the absence of site specific studies, the Secretary may establish hydrologic standards and impose additional hydrologic constraints…to ensure compliance with the requirements of this section.”

ANR Procedure for Determining Acceptable Minimum Stream Flows Adopted in 1993 Uses USFWS NE Flow Policy: –Flow Standards based on seasonal median flows –Alternatively, applicants may do site specific studies De Minimis Withdrawals –No permit required for withdrawal rates less than 5% of 7Q10 or less than.005 x drainage area (mi 2 )

Hydrology Criteria Water Level Fluctuations “Lakes, ponds, reservoirs, riverine impoundments, and any other waters may exhibit artificial variations in water level when subject to water level management but only to the extent that such variations ensure full support of uses.”

Class B Waters Management Objectives Aquatic Biota, Wildlife and Aquatic Habitat – Aquatic biota and wildlife supported by high quality habitat Aesthetics – Water character, flows, water level, bed and channel characteristics exhibiting good aesthetic value Boating, Fishing and Other Recreational Uses – Suitable for these uses

Class B Waters Criteria Aquatic Biota, Wildlife and Aquatic Habitat –No change from the reference condition that would prevent the full support of aquatic biota, wildlife, or aquatic habitat uses –Biological integrity is maintained and all expected functional groups are present in a high quality habitat –All life-cycle functions, including overwintering and reproductive requirements are maintained and protected

Class B Waters Criteria Aesthetics – Consistently exhibit very good aesthetic values Boating – To the extent naturally feasible with no more than minor degradation; mitigation for artificial physical impediments

Flow/Reservoir Management Conservation flows –Bypass –Downstream Aesthetics flows –Flow requirement –Method Ramping Reservoir management –Seasonal elevation limits –Limits on elevation changes

Flow/Reservoir Management Flow management plan Flow/reservoir monitoring plan –Inflow –Outflow –Reservoir elevations Deviation from conditions

Water Quality Dissolved oxygen and temperature –Monitoring plan –Mitigation measures Mercury –Monitoring –Mitigation?? Sediment –Erosion control

Fisheries Passage –Downstream –Upstream Mitigation

Recreation Recreation plan Public access

Wildlife and T&E Species T&E species management plan Wildlife –Habitat management plan Riparian areas Wetlands Water quality protection

Brian T. Fitzgerald Agency of Natural Resources Water Quality Division 103 South Main Street, Building 10 North Waterbury, VT (fax)