Titan-izing the Target Module V.B. Graves 16 Dec 2005.

Slides:



Advertisements
Similar presentations
EPICS Channel Access Overview 2006
Advertisements

Weld Geometry A-B Flange:A Possible Alternate to the Extended Shim/ Double Fillet Weld For welds with overlaps – consider the above to make TIG welding.
Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Heat Flux Measurement Adrian Sabau Metals and Ceramics Division Oak Ridge National Laboratory,
MINIATURE ENGINEERING SYSTEMS GROUP MINIATURE CENTRIFUGAL COMPRESSOR TESTING Presented by Dipjyoti Acharya.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
High Power Hg Target Conceptual Design Review Hg Jet Nozzle Analysis M. W. Wendel Oak Ridge National Laboratory February 7-8, 2005.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
NTOFF11 Experiment Beam Window Assessment Hg Jet Interaction with the 15 Tesla Field Hydrodynamic Analysis of Hg in Supply/Plenum/Jet Hg Jet Interaction.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Integrated Biomass Supply Analysis & Logistics IBSAL Shahab Sokhansanj and Anthony Turhollow.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
PALESTINE UNIVERSITY BUILDING MATERIAL chapter No.#4 Steel.
Explosive Production of New Materials (EPNM – 2008) Comparative Tensile Strength and Shear Strength of Detaclad Explosion Clad Products Andy Vargo R&D.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
A summary on materials selection Some of the major factors in the selection of materials are Strength of the material Corrosion resistance of the material.
ME Session #5 Selection of term projects Assignment#4 : Review of manufacturing processes Presentations of PDS work Material selection Questions.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 GipGui: A Graphical User Interface for the GIP Cross Section Preparation Code ANS M&C.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
1 Spallation Neutron Source Data Analysis Jessica Travierso Research Alliance in Math and Science Program Austin Peay State University Mentor: Vickie E.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Chemical Composition of unalloyed Titanium Grades Grade% oxygen% iron% hydrogen Grade Grade Grade Grade
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
We take the utmost pleasure to introduce ourselves as a professionally managed organization incorporated in the year 1998 to with a vision to manufacture.
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Design of Distribution Feedbox at LHC P7
Mercury Catcher Status
ME Session #5 Selection of term projects
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Titan-izing the Target Module V.B. Graves 16 Dec 2005

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Discussion  Issue: welding Ti6Al4V to SS316 is not a standard fabrication practice -> could increase Hg system fabrication cost  Solution 1: add intermediate plate of Vanadium between all Ti/SS interfaces  Solution 2: eliminate Ti/SS interfaces by using Ti alloy for most of the target module  Let's look at each window separately

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Upstream Secondary Window ActionIssue/Comment Add vanadium flange Uses small amt of window space Make secondary containment out of titanium Material & fabrication costs might increase

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Upstream Primary Window ActionIssue/Comment Add vanadium flange to beam window Space constraints between beam tube & nozzle Make nozzle flange out of titanium Beam window integrated into flange – no welding needed. Nozzle and Hg supply components must also be titanium.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Jet Deflector ActionIssue/Comment Add vanadium flange to edges of deflector None Make primary containment out of titanium Simplifies primary containment fabrication, but perhaps at increased cost Exit funnelShould be of same material as primary containment

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Downstream Primary Window ActionIssue/Comment Add vanadium flange to edges of window Space constraint with funnel Make primary containment out of titanium Mill window into end flange rather than weld

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Downstream Secondary Window ActionIssue/Comment Add vanadium flange to edges of window None known Mechanically attach window to secondary containment with gasket Would increase contacting window flange diameter

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Mechanical Attachment to Flex Hoses ActionIssue/Comment Titanium tubing requires titanium ferrule (grey end piece) Unknown if titanium sanitary fittings are available and what their pressure ratings would be. Probably have to machine our own. Exit funnel butt welded to flange Must be same material or use compatible intermediate sheet. Funnel will have to be custom machined.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Other Considerations From Timet Design/Fab Handbook  Link  Titanium available in various "grades"  Ti6Al4V ASTM Grade 5, UNS R56400, Yield strength 950 MPa (138ksi)  Ti6Al4V may not be available in tubing  ASTM Ti Grade 2, Yield strength 430 MPa (62.4ksi)  Internal working pressure for 1" OD tubing from Ti Grade 2  Wall=0.035, pressure=687psi  Wall=0.049, pressure=971psi  Wall=0.065, pressure=1304psi <- what we may need  Wall=0.083, pressure=1688psi  1" tubing has only 2" bend radius for 0.065" wall  May have to incorporate elbows into Hg supply tube

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Hg Target Module Issues 16 Dec 2005 Conclusions  Desire that all components between the flex hoses be fabricated from Ti6Al4V or unalloyed Ti  Tubing pressure ratings may be an issue  What alloys/ratings are available?  1" OD is maximum we can easily fit into module  Some off-the-shelf tubing components may have to be custom machined  Jet deflector fabrication simpler if the primary containment is titanium  Titan-izing entire module simplifies beam window fabrication / attachment  Probably simpler than using intermediate vanadium sheet  Cost may increase, but not by much  Need to talk with actual supplier to get real answers