Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RWE Transportnetz Gas 04/28/2009PAGE 1 ERGEG Gas Regional Initiative NW Short-term Capacity Project (C1) Comments by TSOs regarding different models discussed.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
EU Tariff Code Update 23 rd June EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Gas Regional Initiative North West Region - Gas Target Model - BNetzA/Ofgem Pre-Comitology Meeting Bonn – 26 May 2011.
Dr. Stefanie Neveling Bundesnetzagentur (Federal Network Agency), Head of Section „Access to Gas Transmission Networks and International Gas Trading” Problems.
1 page 1 Discussion on Intraday Capacity Pricing NWE ID project
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
European Commission views on intra-day and balancing markets
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
All Island Single Electricity Market IWFA Update Laura Brien
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
European Developments Transmission Workgroup 3 rd May 2012.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Congestion Management
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Draft for factual comments, suggestions on overlaps welcome.
Background and Process
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Gas balancing – where next
Walter Boltz Chairman, CEER Gas Working Group
Presentation transcript:

Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets

2Gas Target Model, 3 rd workshop, 11 April 2011, London What are we trying to achieve? 1.Where technically feasible gas should flow to where it is valued most Greater price convergence 2. Efficient use of cross-border infrastructure Capacity hoarding must be avoided Contractual congestion must be avoided Amount of offered capacity must be maximised

3Gas Target Model, 3 rd workshop, 11 April 2011, London ACER’s Capacity Allocation Framework Guideline - Auctions -Bundled products European Commission’s proposals on Congestion Management Procedures - Capacity overbooking – firm UIOLI - Restriction of renominations Existing policy proposals – out for consultation Objective is for short term firm capacity to allow for more short term gas trading

4Gas Target Model, 3 rd workshop, 11 April 2011, London What are we observing today? Markets are still not developed in all parts of Europe Progress has been made, but more needs to be done Source:

5Gas Target Model, 3 rd workshop, 11 April 2011, London Option 1: explicit, continuous Explicit capacity allocation with continuous trading Example for “overselling”: -Shipper A books 100 units of capacity -Shipper A nominates 50 units -TSO assumes that shipper A will not use remaining 50 units, TSO sells them day- ahead -Shipper B buys remaining 50 units off TSO -Shipper A has paid for 100, but only used 50 units  Capacity hoarding is a bad deal!  TSO takes a risk and needs appropriate incentives Explicit auctions (CAM FG) Bundled Products No gate closure, no restriction of renomination rights Overselling Interruptible Use It Or Lose It All capacity is financially firm (not necessarily physically firm) Has been effective in GB, but requires NRAs to set appropriate incentives

6Gas Target Model, 3 rd workshop, 11 April 2011, London Explicit capacity allocation with gate closure Option 2: explicit, gate closure Gas trading would shift to where auction takes place, but can be adapted to allow for renomination during the gas day Example of Gate Closure with firm UIOLI or UIOSI - Shipper A has 100 units in long-term contract -Shipper A nominates 50 units, it loses or is paid for the remaining 50 units (or a proportion thereof) -TSO sells shipper A’s remaining 50 units (or a proportion thereof) in day-ahead auction on a firm basis - Shipper B buys the 50 units, nominates only 20, so loses the remainder intraday - If shipper A wants to increase its nomination, it buys additional capacity intraday Intra-day shipper trading Long-term market (explicit capacity allocation) Nomination Firm day-ahead auction of any capacity that was not nominated (Use It Or Sell It) Use it or lose it: unused capacity is sold through auction or FCFS Gas day

7Gas Target Model, 3 rd workshop, 11 April 2011, London Option 3: implicit auctions More efficient than explicit capacity auctions as it removes risk of separate transactions and allows markets to merge where no physical congestion

8Gas Target Model, 3 rd workshop, 11 April 2011, London CWE market coupling in electricity Before CWE couplingAfter CWE coupling

9Gas Target Model, 3 rd workshop, 11 April 2011, London What is needed for implicit allocation? A party to do the coupling – exchange or TSO Can be same party for both price areas (e.g. ITVC in electricity) Can be two parties that cooperate (e.g. CWE in electricity) Algorithm for determining flows and prices Firm network capacity

10Gas Target Model, 3 rd workshop, 11 April 2011, London Can be used FCFS or implicit auctions FCFS day-ahead not compatible with CAM FGs? Series of implicit auctions may disperse liquidity but more auctions allow for flexibility Arbitrages realised by the TSO from low price area to high price area with implicit allocation of capacity valued at the day-ahead price spread (GRTgaz-Powernext market coupling work) Option 4: implicit, continuous Continuous implicit allocation may be a solution to allow for efficient gas flows while keeping the flexibility provided by continuous trading? Day-ahead/ intra-day Long-term market (explicit capacity allocation) Auction gate closures Implicit allocation

11Gas Target Model, 3 rd workshop, 11 April 2011, London Interactions with long-term gas trading If short term capacity is freed-up, what should be the reserve price? Zero reserve price allows capacity to be re-allocated at 0 cost if there is no congestion If congestion, auction price will rise above zero Will a zero reserve price change shippers behaviour and move markets towards the short term? In non-peak periods maybe more reliance on short term Peak period: long-term capacity still needed Some markets have higher proportion of transit than others Congestion revenues No interconnection High level of interconnection capacity 0 High revenues Surplus inter- connection capacity Interconnection capacity

12Gas Target Model, 3 rd workshop, 11 April 2011, London Interactions with long-term gas trading Options for reserve prices for short term capacity 1.No reserve price (solution in electricity) but in gas domestic tariffs subsidise transit flows? 2.Set a reserve price to recover costs- impact on price convergence at congested points? 3.Set a reserve price at non-congested points but not at congested 4.No reserve price at interconnection points but a ’membership fee’ at end- user exit points a.Flat rate b.Based on flows Need a redistribution mechanism

13Gas Target Model, 3 rd workshop, 11 April 2011, London Interactions with long-term gas trading How could a redistribution mechanism work? 1.Each NRA sets its TSO revenue requirements – identify how much needed for domestic network and how much for transit. Country A – 400 Euros domestic, 100 Euros transit Country B – 300 Euros domestic, 200 Euros transit 2.Each NRA sets membership fee to recover: a.Agreed amount form end-users for national network Country A - to recover 400 Euros from end-users and Country B 300 Euros from end-users b.Estimate amount from congestion revenues Country A & B recover at the interconnected point 150 Euros in congestion revenues (300 Euros is needed for transit) c.Country A & B (or ACER) set a ‘membership fee’ to recover shortfall 150 Euros d.Congestion revenues and membership fee combined and redistributed 100 Euros to Country A and 200 Euros to Country B

14Gas Target Model, 3 rd workshop, 11 April 2011, London Initial conclusions 1.Short term firm capacity is needed 2.Explicit continuous model has been successfully implemented in GB but needs incentivises for TSOs 3.Explicit gate closure may alter gas trading but will free up unused capacity and allows for renominations during gas day 4.Implicit auctions are worth exploring via pilot projects; more efficient than explicit auctions (electricity experience) 5.High proportion of transit capacity so pricing and redistribution of revenues is key for any model

15Gas Target Model, 3 rd workshop, 11 April 2011, London Thank you for your attention!