IFP FSP Implementation Section 7 Marbled Murrelet A presentation at the PFIT Post FSP Workshop by Bob Craven on Interfor’s experience implementing Section.

Slides:



Advertisements
Similar presentations
Forest Practices Code Transition Planning and Silviculture John McClarnon Regeneration Specialist MOF.
Advertisements

FRPA Data Collection, Management and Reporting Defining the Business Requirements RSM Pilot Review Workshop February 2005.
The State of GAR From MOE’s Experience PFIT “Learnings” Workshop October 16, 2007.
1 Wildlife Tree Retention. 2 Wildlife tree retention One of most valuable components of stand-level biodiversity Over 80 species of wildlife are critically.
LANDSCAPE LEVEL BIODIVERSITY. Relevant FREP questions 1. Are ecosystems represented across the landscape in time and space? 2. Is there a sufficient degree.
1 Landscape Unit Planning Guide Training 2 Agenda for the day 8:30 AM - 4:30 PM - opening remarks - introduction - wildlife tree retention - review principles.
Assessment of Class S4 Streams in the Central Interior to Evaluate Riparian Practices Implemented under the Forest Practices Code Peter J. Tschaplinski.
Fuels Reduction and Wildlife Habitat Restoration in a Late Successional Reserve Klamath National Forest, Goosenest Ranger District.
Spruce Beetle Epidemic & Aspen Decline Management Response EIS Adaptive Implementation Process.
Introduction to Potential Changes for UWR #U Order (Mountain Goat) Ungulate Winter Range North Island-Central Coast Mid Coast TSA.
Lecture 7 Forestry 3218 Forest Mensuration II Lecture 7 Forest Inventories Avery and Burkhart Chapter 9.
Establishing GIS for Management in the Sauvie Island Wildlife Management Area, Oregon Jeremy Hruska Masters Degree in GIS Candidate Penn State University.
Timber Supply Review and Species Management By: Paul Barolet, R.P.F., Stewardship Officer Stewardship Officer.
FSP REVIEW PLANNING BENEFITS CONCERNS IMPROVEMENTS A presentation at the PFIT Post FSP Workshop by Cam Leitch on Pope and Talbot’s experience implementing.
5 Year Silviculture Plan Development Process Presented by Kevin Telfer R.P.Bio., R.P.F. Stewardship Forester Coast Region.
Harvesting Practices and Mountain Goat Habitat in the Babine Watershed A Background Review Prepared for:By: Megan D’Arcy, R.P.Bio.
Small Scale Salvage Program Application Process. Purpose To establish an application and approval process for small scale timber salvage that is efficient,
MNR’s Role February 6 th, 2014 Presented by Kerry Reed, Species at Risk Biologist 1.
FSP Extensions Delivered by: Paul Picard, Del Williams Forest Tenures Branch.
1 OLD GROWTH RETENTION. 2 Planning for Old Growth Retention Goals –Spatially locate and map OGMAs based on – maximizing biological effectiveness within.
Forestry Group Erica McClaren February 23, Forestry Group Staff Section Head – Ron Diederichs Senior Biologist – Dave Donald (Acting) Ecosystem.
Forest Management Planning
Preventing Endangered Species Listings with the Tongass Conservation Strategy Steve Brockmann U.S. Fish and Wildlife Service.
MNR’s Role in Public Safety Around Dams –An Overview
District Operational Monitoring Initiative By the DOMI Team A presentation at the PFIT Post FSP Workshop by Brian Westgate on the MoFR’s DOMI monitoring.
RESULTS FRPA s.108 Application November 2010 Presented by Mei-Ching Tsoi
Welcome To the Objectives Pillar Workshop Introduction Business need Target Audience - technical and professional staff who support decision maker.
Endangered Species Act Section 7 Overview Endangered Species Program, U.S. Fish and Wildlife Service 2001.
Timber Supply Review and Species Management By: Paul Barolet, R.P.F., Stewardship Officer Stewardship Officer.
Forestry-related Ordinances in Florida What are the potential influences of county and municipal ordinances on forest land retention and sustainability?
1 FSP Tracking System Overview Bill Beard / John Gallimore March 8, 2007 A presentation at the PFIT Post FSP Workshop by Bill Beard/John Gallimore on the.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
Provincial FRPA Implementation Team Post Forest Stewardship Plan Workshop BC Timber Sales Strait of Georgia Presentation March 7, 2007 A presentation at.
Conifer Plantation Management Caring for Your Land Series of Workshops Conifer Plantations Module #4 Timber Sales and Marketing 4-1.
Redevelopment Grant Program Implementation Workshop Spring 2010.
1 FRPA Quiz Show Harvesting & Roads Module FRPA Training Program February 2004.
Range Planning 1 & Objectives & Objectives The Focus is on Results.
Post-FSP World Making it work between Tenures, C&E, Stewardship (Larry Badowski) (Tenures Officer – PGFD) A presentation at the PFIT Post FSP Workshop.
Cruising Manual Highlights Ministry of Forests & Range 2009.
Streamlining Project Final Version August 2005 Cutblock Integration Team Proposals Creating a streamlined forest information management model…
1 FRPA Quiz Show Overview Module -- Break 4 FRPA Training Program February 2004.
1 PFIT Post FSP Workshop Mar. 7-8, 2007 Session Review Larry Hanlon Harry Jennings.
CRIT FRPA Results or Strategies Workshop - May 18, 2006 Coast Region Implementation Team FRPA Results or Strategies Workshop Introduction.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
THE SPECIES AT RISK ACT (SARA) CBA/Justice National Section Meeting National Environmental Energy Resources Law Group Ottawa – October 24, 2004.
ODFW Habitat Mitigation Policy and Energy Facility Siting.
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
Biological Planning Process for Partners in Flight How to Translate Population Targets into Habitat Objectives at Eco-Regional Scales West Gulf Coastal.
Kootenay Lake Forest District Post FSP approval -experiences from a tenures perspective 1 A presentation at the PFIT Post FSP Workshop by Curt Nixon/Rob.
Development of a process for setting Conservation Objectives Dr Rebecca Jeffrey Science and Biodiversity Section National Parks and Wildlife Service Ireland.
1 ABCFP Policy Review Seminar 2009 Forest and Range Practices ABCFP Policy Review Seminar 2009: Forest and Range Practices.
Consortium for Educational Research and Evaluation– North Carolina Building LEA and Regional Professional Development Capacity First Annual Evaluation.
Forest Stewardship Plan Result or Strategy Effectiveness Analysis Report 2014 North Island Central Coast Forest Management Leadership Team Meeting January.
References. Methods Results We conducted avian point counts at pre-established points (created by USFWS within the Whittlsey Creek Watershed in the
Options for Forest Bird Management Coastal Operational Issues Forum March 31, 2016.
Stocking Standard Content and Why it Matters
Forest Management in BC
Crown expectations for small stream outcomes under FRPA
FORESTRY COMMISSION TECHNICAL PROCEDURE FOR TIMBER RESOURCES ALLOCATION IN GHANA COMPILED BY KWAKYE AMEYAW, OPERATIONS MANAGER- FOREST SERVICES DIVISION.
Legislation and Mapping
Overview of the Species at Risk Act for Local Governments
Guidance on Natura 2000 and Forests – Scoping Document
Guidance on Natura 2000 and Forests – Scoping Document
General overview of Module
Small Scale Salvage Program
A Snapshot in Time Prepared for: Prince George FREP Overview
Karst Government Actions Regulation Project Initiation
General overview of Module
for the GOVERNMENT ACTIONS REGULATION WORKSHOP
Dynamic Purchasing System Procurement Process
Presentation transcript:

IFP FSP Implementation Section 7 Marbled Murrelet A presentation at the PFIT Post FSP Workshop by Bob Craven on Interfor’s experience implementing Section 7 notices for Marbled Murrelet.

In the beginning … There was change in Government… On the first day new legislation was created On the second day an Objective was set by Government On the third day a Result/Strategy was developed On the fourth a background document was crafted On the fifth day the FSP was approved On the sixth day… Bob looked around and said all is good but we are not done… Now on the seventh day we have to Implement

Objective Set By Government – Marbled Murrelet Amount The amount is equal to the amount of suitable habitat in the NCLBThe amount is equal to the amount of suitable habitat in the NCLB A set amount of THLBA set amount of THLB The amount found in OGMA’sThe amount found in OGMA’sDistribution As per IWMS 2004As per IWMS 2004Attributes Size; tree features; tree species; nesting habitat features; tree size; structural stage;Size; tree features; tree species; nesting habitat features; tree size; structural stage;

Result/Strategy Roadbuilding and harvesting will ensure the following are met: Amount The amount of suitable habitat found in the NCLB calculated by TSR II net down (no number given)The amount of suitable habitat found in the NCLB calculated by TSR II net down (no number given) A pro - rated amount of THLB based the percent of THLB found in the FSP vs the amount of THLB found in the forest district (total amount of THLB given)A pro - rated amount of THLB based the percent of THLB found in the FSP vs the amount of THLB found in the forest district (total amount of THLB given)Distribution As per IWMS 2004 over the area of the FSPAs per IWMS 2004 over the area of the FSPAttributes Habitat Classes 1, 2, 3 based on low level helicopter surveysHabitat Classes 1, 2, 3 based on low level helicopter surveys Age Class 8 and 9, equal to or greater than height class 4Age Class 8 and 9, equal to or greater than height class 4

Implementation Staff Training FSP – Overall requirementsFSP – Overall requirements FSP – R/S specific requirementsFSP – R/S specific requirements SAR TrainingSAR Training Strategy Requirements WhatWhat How MuchHow Much WhereWhere DepletionsDepletions

Implementation – Staff Training FSP – Overall Requirements Developed an FSP Guidance Document for a quick reference (60+ pages)Developed an FSP Guidance Document for a quick reference (60+ pages) Presented the Guidance Document in a workshop giving an overview of all R/S in the FSPPresented the Guidance Document in a workshop giving an overview of all R/S in the FSP FSP – R/S Specific Requirements Provide internal resources to understand R/SProvide internal resources to understand R/S Potentially provide further internal training on more complex R/SPotentially provide further internal training on more complex R/S

Field Guide

Implementation – Marbled Murrelet Strategy What and Where Do we have low level helicopter surveysDo we have low level helicopter surveysor Are we using age class 8 and 9 equal to or greater than height class 4Are we using age class 8 and 9 equal to or greater than height class 4

Implementation – Low Level Habitat Surveys Extent of IFPs low level habitat surveys loaded into TFMExtent of IFPs low level habitat surveys loaded into TFM Database is kept currentDatabase is kept current Includes habitat surveys as well as legally designated areas (WHAs)Includes habitat surveys as well as legally designated areas (WHAs)

Implementation – Marbled Murrelet Strategy How Much How much was determined by the amount of suitable habitat in the NC using all net downs in TSR II. This was done by either overlaying low level helicopter surveys or age class 8 and 9 equal to or greater than height class 4 on the TSR II land base classifications.

Implementation – Determining How Much Conducted on FDUs within the FSPConducted on FDUs within the FSP To determine the amount of suitable habitat by land base classification (NCPX)To determine the amount of suitable habitat by land base classification (NCPX) Gives IFP the unspecified amount required in the NoticeGives IFP the unspecified amount required in the Notice Analysis results presented in a spreadsheetAnalysis results presented in a spreadsheet

Implementation – Log or No Log? 2,592 ha – 1,116 ha = Amount that can be harvested2,592 ha – 1,116 ha = Amount that can be harvested

Implementation – Marbled Murrelet Strategy Tracking Any depletion of suitable habitat is documented by area in the SPAny depletion of suitable habitat is documented by area in the SP Depletions are presently tracked on a spreadsheet by FDU. Spreadsheets will be periodically updatedDepletions are presently tracked on a spreadsheet by FDU. Spreadsheets will be periodically updated Potential to develop tracking system in TFMPotential to develop tracking system in TFM

The following management strategies are consistent with Interfor’s 2006 North Island Forest Stewardship Plan (FSP) approved December 15, This block is located in the Sayward Landscape Unit, Forest Development Unit (FDU) NI5. Strategies for objectives prescribed under FPPR. Applies to site (Y/N) Indicate how strategy applies to site Wildlife (FPPR s.69,70) (S of FSP) Y  Marbled Murrelet: no Class 1, 2 or 3 habitat identified under the area of the site plan.  Great Blue Heron: no nests were identified during ordinary course of carrying out forest practices and planning forest operations  Red-legged Frog: no breeding wetlands were identified during ordinary course of carrying out forest practices and planning forest operations.  Keen’s Long eared Myotis: no hibernacula’s where identified during ordinary course of carrying out forest practices and planning forest operations Implementation – Site Plan

The following management strategies are consistent with Interfor’s 2006 Sunshine Coast Forest Stewardship Plan (FSP) approved July 20 th, This block is located in the Cortez Landscape Unit, Forest Development Unit (FDU) #8. Strategies for objectives prescribed under FPPR. Applies to site (Y/N) Indicate how strategy applies to site WildlifeYHarvesting of this block will not affect the critical wildlife species and their habitats identified for this FDU, specifically: harvesting block RZ03A will not result in the harvest of suitable Marbled Murrelet habitat class 1, 2 or 3. Block RZ03A is a windthrow salvage block and due to high safety concerns the block has not been walked prior to harvest. It is unlikely that there is any Queen Charlotte Goshawk suitable habitat (active nests) within RZ03A; as a result of windthrow damage there are no standing stems remaining within the block. If any Queen Charlotte Goshawk activity is discovered during harvesting, operations must cease and Qualified Professional must be notified. Implementation – Site Plan

Day 8 and still working