E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters.

Slides:



Advertisements
Similar presentations
E.C. Aschenauer 2013/03/132 polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable  should.
Advertisements

E.C. Aschenauer arXiv: & E.C. Aschenauer EIC User Meeting Requirements from Physics:  High Luminosity ~ cm -2 s -1.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
Bunch-by-bunch (relative) polarization measurements using inner annuli of STAR BBC Andrew Gordon April 4, 2008.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
Run 8 Polarization measurements from STAR BBC Andrew Gordon September 12, 2008.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
H-Jet polarimeter status report Yousef Makdisi RSC 07/28/06.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Spin Patterns for Run-2015 E.C. Aschenauer/ O. Eyser 1.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
E.C. Aschenauer STAR Spin PWG 2012/03/222  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
versus Proton spin vector Double-spin helicity asymmetry: N ++ / L ++  N +  / L +  N ++ / L ++ + N +  / L +  1 P1P2P1P2P1P2P1P2 A LL  Single-spin.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Polarimetery A.Bazilevsky for RHIC Polarimetry group RHIC Spin Collaboration Metting April 10 (Friday), 2009.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
ApEx needs for CeC PoP Experiment December 11, 2015.
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Floating MD week 28 summary
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Friday 14th December - morning
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tue/Wed 12/ :00 Probe beam back again
Collective effects in the SPS and LHC (longitudinal plane)
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Tuesday 20 September 2011.
Presentation transcript:

E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters was done pC numbers not normalized to jet

polarisation at flat top Blue and Yellow H-JET

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.040/hour 0.97%±0.047/hour

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.11/hour 0.80%±0.11/hour H-Jet Fills:

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.095/hour 0.42%±0.08/hour

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.13/hour 0.41%±0.07/hour

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.17/hour 0.18%±0.118/hour H-Jet Fills:

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.08/hour 0.35%±0.11/hour

polarisation at injection Blue and Yellow Caveat: pC numbers not normalized to jet

E.C. Aschenauer Phil Pile Meeting 2012/03/2011 polarisation at flat top Blue and Yellow H-Jet  longitudinal H-Jet Run-11

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.18/hour 0.71%±0.28/hour Run %±0.07/hour Run %±0.07/hour

E.C. Aschenauer Phil Pile Meeting 2012/03/ %±0.18/hour 0.71%±0.28/hour H-Jet: Fills: trans + longitudinal H-Jet: Fills: longitudinal

 100 GeV:  main loss in polarisation through decay in fill  polarisation decay varies from week to week for the two beams  jet and pC polarimeters consistent observing the same trends  255 GeV:  the polarisation loss through decay in fill and on the ramp  jet and pC polarimeters consistent observing the same trends  observed polarisation consistent with 2011 average  polarisation decay in fill “comparable” to 2011 E.C. Aschenauer Phil Pile Meeting 2012/03/2014