Concerns with RUC Capacity Short Charge and Energy Trades.

Slides:



Advertisements
Similar presentations
Nodal Credit Limit Overview Credit Work Group May 28, 2008 Cheryl Yager.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
May 18, 2009 SEWG Dispute due dates when extracts are delayed Art Deller.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Zonal ADR Resettlement & Data Retention ERCOT CSWG 04/20/2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
1 Cutover Market Call November 29, :00 AM.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
March 13, 2007 – Slide 1 ERCOT Nodal 101 COPS Market Guide Commercial Operations Market Guide Section 5 a. Overview of ERCOT ERCOT Overview Market Overview.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
1 Protocol Clarification: Section , Resolution of Dispute Notification of Financial Impact of Granted and Granted with Exception Disputes COPS.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1 Review of Minimum Current Exposure (MCE) as revised by NPRR639 Mark Ruane Director Settlements, Retail and Credit TAC July 30, 2015 ERCOT Public.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Nodal Settlement Delta Calculations and Statements  Objective: Describe the recommended design of nodal settlement delta calculations and statements.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
Market Trials Update NATF March 2,
Settlement Update Austin Rosel ERCOT February 27, 2017.
Nodal Program Update to Cops
Cutover Market Call November 29, :30 PM
Protocol Revision Subcommittee
Ancillary Service Trades and Ancillary Service Settlement
Presentation transcript:

Concerns with RUC Capacity Short Charge and Energy Trades

Background RUC processes (DRUC & HRUCs) use the following inputs to make capacity commitment decisions: – Load Forecast, COP, Start Up & Minimum Energy Offers, Transmission constraints, Resource Parameters, and few others (see (8)). – Energy Trades not used in RUC process commitment decision. RUC Capacity Short Charge is a settlement function used to allocate RUC costs. – Energy Trades are used in the RUC Capacity Short Charge methodology. Nodal trade submission rules: – Final energy trade submission deadline is 1430 of the day following the operating day. – Snapshots are taken of submitted trades throughout the day-ahead and real-time RUC processes to assess “shortness” for RUC Capacity Short Charge (i.e. snapshot taken at each DRUC and HRUC process).

Concerns with RUC Capacity Short Charge Issue 1) Bilateral agreements do not consider RUC process trade submission deadlines; Protocols offer a choice – Bilateral trade agreement language references submission of trades (i.e. scheduling) “in accordance with ERCOT Protocols” or is silent. Final ERCOT Protocol deadline is 1430 day after. There is no obligation established in bilateral agreements to submit trades before RUC processes. – Counterparties must agree to voluntarily submit trades before RUC deadlines in order for them to be included in “shortness” assessment. – Not feasible to change every bilateral agreement in ERCOT. – It is reasonable for bilateral agreements to not consider RUC deadlines. See Issue #4.

Concerns with RUC Capacity Short Charge Issue 2) Conflicting incentives for long and short counterparties regarding trade submission – No enforcement mechanism for submission based on Protocol requirement or bilateral agreement which requires both counterparties to submit trades before RUC process deadlines. – Buying counterparty incented to submit trades early at RUC process deadlines – purchases cover any short position for RUC. – Selling counterparty incented to submit trades at trade submission deadline (1430 day-after) – no short position in system for RUC. Issue 3) Bilateral trade counterparty settlement reconciliation – No enforcement mechanism for reconciliation based on Protocol requirement which requires both counterparties to submit trades before RUC process deadlines. Submitting trades after RUC process deadlines but before final trade submission deadline still compliant with ERCOT Protocols and bilateral agreement. – For perspective, counterparty reconciliation of scheduling mismatches in the current zonal market is facilitated by ERCOT Protocol submission requirements along with corresponding settlement data that accommodate the bilateral market.

Concerns with RUC Capacity Short Charge Issue 4) RUC process trade submission deadlines undermine bilateral flexibility – Conflicting economic decisions accompany multiple trade submission deadlines. Submitting trades early undermines value of real-time flexibility in bilateral agreements. Submitting trades later may create exposure to RUC when the party may not be short. – Trade submission at DRUC process deadline would reduce liquidity or eliminate the bal-day (balance of day) bilateral market. This removes a real-time hedging tool.

The Nodal Protocols are clear, but don’t think the intended design will work without significant disruption to the bilateral market. The Results? Confusion upon nodal go-live especially when ERCOT settlement statements and invoices show up, excessive counterparty reconciliation and disputes, potential litigation, reaction in the bilateral market. Potential Solution: Remove energy trade snapshot mechanism in RUC Capacity Short Charge. Assess “shortness” based on final energy trade submissions received by 1430 of day following operating day. No change to COP or Capacity Trade snapshots. Preserves original cost allocation concept. – Be conscious of nodal implementation timeline. Simplify implementation. – WMS Discussion: What are the consequences of this change? Concerns with RUC Capacity Short Charge

Appendix Nodal Protocol References

Nodal Protocols Section Energy Trades (1)An Energy Trade is the information for a QSE-to-QSE transaction that transfers financial responsibility for energy at a Settlement Point between a buyer and a seller. (2)An Energy Trade for hours in the Operating Day that is reported to ERCOT before 1430 in the Day-Ahead creates a capacity supply or obligation in the DRUC process. Energy Trades submitted after 1430 in the Day-Ahead for the Operating Day create a capacity supply or obligation in any HRUC processes executed after the Energy Trade is reported to ERCOT. Energy Trades submitted after the DRUC snapshot are considered in the Adjustment Period. (3)An Energy Trade may be submitted for any Settlement Interval within an Operating Day before 1430 of the following day. (4)As soon as practicable, ERCOT shall notify each QSE through the Messaging System of any of its Energy Trades that are invalid Energy Trades. The QSE may correct and resubmit any invalid Energy Trade within the appropriate market timeline.

Nodal Protocols Section QSE Security Sequence Responsibilities During the Security Sequence, each QSE must: (1)Submit its COP and update its COP as required in Section 3.9, Current Operating Plan (COP); (2)Submit any Three-Part Supply Offers before: (a)1000 in the Day-Ahead for the DAM and DRUC being run in that Day-Ahead, if the QSE wants the offer to be used in those DAM and DRUC processes; and (b)The end of the Adjustment Period for each HRUC, if the QSE wants the offer to be used in the HRUC process; (3)Submit any Capacity Trades before 1430 in the Day-Ahead for the DRUC and before the end of the Adjustment Period for each HRUC, if the QSE wants those Capacity Trades included in the calculation of RUC settlement; (4)Submit any Energy Trades before 1430 in the Day-Ahead for the DRUC and by the end of the Adjustment Period for each HRUC; if the QSE wants those Energy Trades included in the calculation of RUC Settlement;

Nodal Protocols Section ERCOT Security Sequence Responsibilities (3)For each RUC process, ERCOT shall: (a)Execute the Security Sequence described in Section 5.5, Security Sequence, Including RUC, including: (i)Validating Three-Part Supply Offers, defined in Section , Three-Part Supply Offers; and (ii)Reviewing the Resource commitment recommendations made by the RUC algorithm; and (b)Post to the MIS Secure Area, the following information related to the RUC: (i)All active and binding transmission constraints (contingency and overloaded element pair information where available) used as inputs to RUC; and (ii)All Resources that were committed or decommitted by the RUC process; and (c)Issue Dispatch Instructions to notify each QSE of its Resource commitments or decommittments.