1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.

Slides:



Advertisements
Similar presentations
1 CERC Terms and Conditions of Tariff This presentation will only highlight the relevant financial principles and operation norms. APERC would like to.
Advertisements

Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Chapter 3 Cash Flow and Financial Planning. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 3-2 Analyzing the Firm’s Cash Flows Cash flow.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Madhya Pradesh Electricity Regulatory Commission Terms and Conditions of Tariff MPERC Comments on CERC Discussion Paper.
Economics of Power Generation Lecture 6. “”The art of determining the per unit (i.e., one kWh) cost of production of electrical energy is known as economics.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Mutual Funds The Basics. What is a Mutual Fund?  Mutual funds are investment avenues that pool the money of several investors to invest in financial.
Legal provision for Tariff determination 61. The Appropriate Commission shall, subject to the provisions of this Act, specify the terms and conditions.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
UGANDA LEASING ASSOCIATION ACCOUNTING AND TAXATION OF LEASING TRASACTIONS BY: IRAGUHA ADAD DATE:17 th June,2015.
Billing, Collection and Disbursement Procedures
CERC DISCUSSION PAPER ON TERMS AND CONDITIONS FOR TARIFF FROM WARM WELCOME TO THE PRESENTATION BY NEYVELI LIGNITE CORPORATION LTD., NEYVELI.
Presentation on CERC Discussion Paper on Tariff Norms By powergrid.
AVAILABILITY BASED TARIFF. HIGHLIGHTS OF CERC ORDER DATED ON ABT 1. ORDER APPLICABLE TO J&K ALSO. 4. ABT WAS TO BE IMPLEMENTED IN ALL THE REGIONS.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
Regulation and Commercial Issues in Bulk Power Generation Tariff By S.C.SHRIVASTAVA, Joint Chief (Engg) CERC, New Delhi 10/7/20151CERC.
‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)
System Operators’ Course CERC Terms & Conditions of Tariff
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
PRESENTATION On National Hydroelectric Power Corporation Ltd. ( A Govt. of India Enterprise) Sector – 33, Faridabad (Haryana), INDIA “Comments on Discussion.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
1 Analysis of OPTCL’s ARR and Transmission tariff for FY By: World Institute of Sustainable Energy, Pune (Consumer Counsel) 4 th February, 2011.
Analysis of ARR & Tariff Proposal of OHPC World Institute of Sustainable Energy Consumer Counsel.
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
1 A Presentation on ARR & Tariff Proposal of SLDC for FY Analysis/Objections/Suggestions February 8, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
-- Bhanu Bhushan -- < > (August, 2011)
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
Electricity pricing Tariffs.
1 Prof. Dr. Mohamed I. Migdad Professor in Economics Chapter six Analysis of Costs Prof. Dr. Mohamed I. Migdad Professor in Economics.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Power Generation and Distribution
TARIFF DETERMINATION: GENERATION AND TRANSMISSION
Fuel Cost Components in the Fuel Adder
Fuel Cost Components in the Fuel Adder
DRAFT- April 3, 2001 Restructuring Proposal to Brazos Electric Power Cooperative, Inc. April 6, 2001 This Information is CONFIDENTIAL Per Section 5 of.
Experience of R & M from Regulatory Perspective
Fuel Cost Components in the Fuel Adder
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
penetration of wind power
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
System Operators’ Course CERC Terms & Conditions of Tariff
Presentation transcript:

1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011

2 Basic criteria Reimbursement of reasonable cost of generation and a reasonable return on investment : RoE, IoL, Depreciation, O&M, Fuel, IWC. Separation of Fixed and Variable costs, to ensure that a generating company does not suffer a financial loss when the station is asked to back down, to ensure that there are no perverse incentives, and to facilitate merit-order operation. Equitable sharing of the total payment between the beneficiaries according to benefits derived (or entitled to derive): Fixed cost α shares; Variable cost α scheduled energy.

3 Focused incentives for improved performance, particularly to maximize MW availability and generation during peak-load hours, and to back down as per merit-order during off-peak: Fixed cost payment α plant availability; = AFC when actual availability = NAPAF; AFC and ECR based on judicious norms for heat rate, auxiliary power consumption, secondary oil, even in cost-plus tariff, but fuel cost and GCV variations are pass-through.

4 Desirables Generators and beneficiaries should know, upfront, what the charges would be, and retrospective adjustments should be avoided. Dispute-free implementation on long-term basis: the scheduling process: availability declaration, MW and energy entitlements, requisitions, schedules, metering, deviations, U.I. accounting. Two-part tariff for all thermal and hydro generation is a must, whether cost-plus or market-based. The two components have to be worked out based on specified norms (in cost-plus) or reached through competitive bidding process (in market-based).

5 Some salient features of the CERC (Terms & Conditions of Tariff) Regulations, 2009, issued on and effective from for 5 years Plant availability norm raised from 80% to 85%. PLF-linked incentive withdrawn; incentive is now an integral part of Capacity charge, which is directly linked to plant availability. Secondary oil cost included in AFC. Infirm power paid at U.I. rate. If secondary oil consumption is below the norm (1 ml/kWh now), savings shared 50:50 with beneficiaries.

6 Some of the norms / provisions GSHR: 2500 / 2425 kcal/kWh for 210 / 500 MW. Auxiliary power consumption: 8.5 / 6.0% for 210 / 500 MW; + 0.5% for IDCT. Transit loss for coal = 0.2 / 0.8%. Useful life = 25 / 35 years for thermal / hydro. Shares to remain constant during a month. FEHS for hydro = 12% + 1%. NAPAF for hydro, plant-specific, as per average peaking capability, duly considering year-round inflow variation (for R-o-R), head variation (for storage), maintenance requirement (e.g. silt).

7 13. Components of Tariff. (1) The tariff for supply of electricity from a thermal generating station shall comprise two parts, namely, capacity charge (for recovery of annual fixed cost consisting of the components referred to in regulation 14) and energy charge (for recovery of primary fuel cost and limestone cost where applicable). (2) The tariff for supply of electricity from a hydro generating station shall comprise capacity charge and energy charge to be derived in the manner specified in regulation 22, for recovery of annual fixed cost (consisting of the components referred to in regulation 14) through the two charges.

8 Annual fixed cost (AFC) of a generating station consists of the following components – (a) Return on equity; (b) Interest on loan capital; (c) Depreciation; (d) Interest on working capital; (e) Operation and maintenance expenses; (f) Cost of secondary fuel oil (for coal-based and lignite fired generating stations only); (g) Special allowance in lieu of R&M or separate compensation allowance, wherever applicable.

9 RoE: at a rate to provide 15.5% (post-tax). Equity in excess of 30% of project cost treated as loan. IoL: On average notionally outstanding loan for the weighted average rate of interest. Annual notional loan reduction = Depreciation charged in tariff. 5.28% for 12 years, & balance spread over the remaining life. Rs 18.2 / 13.0 lakh per MW for 210 / 500 MW thermal units in , with 5.72% escalation; 2% for new hydro.

10 IWC: Working capital comprises of (i) coal stock for 1.5 / 2 months, (ii) secondary oil for 2 months, (iii) maintenance 20% of O&M, (iv) O&M for 1 month, (v) receivables for 2 months. Interest rate = short-term PLR of SBI. Monthly billing, payable in 2 months; 2.0% rebate for immediate payment through LC, 1.25% per month surcharge for delay. FERV or hedging cost is recoverable from beneficiaries.

11 Capacity charge (inclusive of incentive) payable to a thermal generating station for a calendar month: (a) Generating stations in commercial operation for less than ten (10) years: AFC x ( NDM / NDY ) x ( x PAFM / NAPAF ) Provided that in case the plant availability factor achieved during a financial year (PAFY) is less than 70%, the total capacity charge for the year shall be restricted to AFC x ( / NAPAF ) x ( PAFY / 70 ). (b) For generating stations in commercial operation for ten (10) years or more: AFC x ( NDM / NDY ) x ( PAFM / NAPAF ).

12 PAFM or PAFY = x Σ DCi / { N x IC x ( AUX ) } % In case of fuel shortage, the generating company may propose to deliver a higher MW during peak-load hours by saving fuel during off-peak hours. Then, DCi = the maximum peak-hour ex- power plant MW schedule specified by the concerned Load Despatch Centre for that day. ECR = { (GHR – SFC x CVSF) x LPPF / CVPF + LC x LPL } x 100 / (100 – AUX).

13 Application of ABT to Hydro plants Hydro plants have no variable cost, and therefore can not have an energy charge rate based on variable cost. Total annual fixed cost is notionally being divided in two equal parts for recovery as capacity charge and energy charge respectively. This is done to attach values to peaking capability and energy produced, both being equally important.

14 Capacity charge payable for a calendar month = AFC x 0.5 x ( NDM / NDY ) x ( PAFM / NAPAF ), where, PAFM = x average DC / { IC x ( 100 – AUX ) } % Energy charge payable for a calendar month = ECR x Scheduled energy x ( 100 – FEHS ) / 100, where ECR = AFC x 0.5 x 10 / { DE x ( 100 – AUX ) x ( 100 – FEHS ) } Energy charge rate for energy in excess of DE limited to 80 p/kWh (for checking windfall gain).

15 Example: IC = 400 MW, DE = 2000,000 MWh, AUX = 1%, NAPAF = 85%, AFC = Rs 300 crore, FEHS = 12%, NDM = 30, NDY = 365, PAFM = 90%, Month’s load factor = 50%. ECR = 3000,000,000 x 0.5 / ( 2000,000 x 0.99 x 0.88 ) = Rs 861 per MWh = 86.1 p/kWh. Capacity charge for the month = 3000,000,000 x 0.5 x ( 30 / 365 ) x ( 90 / 85 ) = Rs 130,539,880. Scheduled energy for the month = 128,304 MWh Energy charge for the month = 861 x 128,304 x 88 / 100 = Rs 97,213,371. Total average rate = = p/kWh.

16 Safe-guards against revenue loss due to persisting lean inflow In first ten years: if A1 < DE, ECR for next year shall be calculated assuming DE = A1, till energy charge short fall has been made up. Normal ECR thereafter. After 10 years, if A1 < DE, ECR for the third year shall be calculated assuming DE = ( A1 + A2 – DE ), subject to a minimum of A1 and maximum of DE, on rolling basis.