High Recycle with WMA Fatigue Cracking Experiment AFD40(2) - April 11, 2013 Nelson Gibson, Ph.D., P.E. FHWA Office of Infrastructure R&D.

Slides:



Advertisements
Similar presentations
Performance Testing of Asphalt Pavements Specifying Low-Temperature Cracking Performance for Hot-Mix Asphalt January 22, 2012 TRB Workshop Tim Clyne,
Advertisements

2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
Long-Life Pavements Concepts and Lab Testing
Aspects of Current MLS APT Activities in southern Africa Fred Hugo Road Pavement Forum 7 November 2006.
Mix Design & Rejuvenators
North East Asphalt User/Producer Group Steering Committee Meeting Monday March 26, 2012 Presented by: Jo Sias Daniel, University of New Hampshire © Thorndyke.
Office of Infrastructure R&D U.S. Department of Transportation Federal Highway Administration High Reclaimed Asphalt Pavement Use in Asphalt Mixtures Canadian.
Steve Jackson, PE Technical Manager NB West Contracting As seen on shinglerecycling.org 6 th Asphalt Shingle Recycling Forum Denver, CO With Solutions.
Recruitment of the New LTPP SPS-10: Warm Mix Asphalt Experiment Gabe Cimini LTPP NCRSC Project Manager.
Presented at: Rutgers Asphalt Paving Conference March 8, 2011 Presented by: Eileen Sheehy, P.E. Manager, Bureau of Materials NJDOT.
Asphalt Issues AASHTO SCOC Virginia Beach, Va. By Victor (Lee) Gallivan FHWA August 2, 2011.
Development and Application of the Asphalt Mix Performance Tester Ramon Bonaquist, Ph.D., P.E Advanced Asphalt Technologies, LLC.
Test Result Relationships
Greening the Blacktop Going Green with Sustainable Asphalt RAP, Recycling, Energy and the Carbon Footprint.
Advanced Asphalt Technologies, LLC “Engineering Services for the Asphalt Industry” WHRP Project HMA Fatigue and Low Temperature Properties to.
Evaluation of Cracking Resistance of Superpave Mixtures Using Texas Overlay Test Syeda Rubaiyat Aziz Mustaque Hossain Greg Schieber Department of Civil.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
WMA TWG December NCAT WMA Research 2007 Andrea Kvasnak.
TRB AFK10 Committee on General Issues in Asphalt Technology Update on NCAT Test Track and Other Research Results April 24-26, 2006.
Warm Mix Asphalt Yellowstone National Park Brad Neitzke Western Federal Lands Highway Division.
Activities as Turner-Fairbank Highway Research Center Jack Youtcheff Materials & Construction Team Federal Highway Administration
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
HMA Pavement Recycling and Reconstruction
1 Green Roadway Design from a Pavements Perspective Rene’ Renteria, P.E. ODOT Pavement Design Engineer April 13, 2010.
RAP and RAS At DelDOT Karl Zipf, Chief Chemist DelDOT 2014.
Reclaimed Asphalt Pavements “RAP” Pete Coffman. RAP ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns ◊Case Studies ◊Uses ◊Mix Methods ◊Cost Savings ◊Concerns.
Characterization of Alaskan Hot-Mix Asphalt containing RAP
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
LOW TEMPERATURE CRACKING Tim Clyne, MnDOT Dec 7, 2011 MAAPT.
AAPA 2010 Study Tour – Accelerated Pavement Testing & Equipment Observations and Recommendations Accelerated Pavement Testing & Equipment.
Asphalt Shingles in HMA Missouri DOT Experience North Central HMA Conference Joe Schroer, PE January 10, 2007.
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
Accelerated loading test results of two NCAT sections with highly modified asphalt Erik J. Scholten – Kraton Innovation Center Amsterdam David H. Timm.
Asphalt Institute Research Update FAA Airport Pavement Working Group Meeting April 26, 2012.
Mix Designs with RAS Dr. Richard Willis National Center for Asphalt Technology at Auburn University Asphalt Shingle Recycling Forum November 8 th, 2013.
Overview Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Asphalt Pavement Team Leader, R&D Federal.
The Hassan / Omann Shingles Recycling Demonstration Project A Presentation by Bill Boettner At the Dakota County Shingles Recycling Workshop On Tuesday,
Warm Mix Asphalt & Recycled Asphalt Pavements
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
National Performance of High Recycled Mixtures. 2 Outline Trends in RAP and RAS usage and practices Motivations for higher recycled contents Barriers.
Using Reflective Crack Interlayer-
Volumetric Properties of High RAP Mixtures Based on Calculated Bulk Specific Gravities of RAP and Constituent Aggregates Nassim Sabahfer Mustaque Hossain,
AMERICA RIDES ON US HMA ECONOMICS 101 Minimizing Project Costs without Sacrificing Quality Purdue Road School March 09, 2011 M. Dudley Bonte PE Regional.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
Asphalt Technology Course
At Auburn University National Center for Asphalt Technology Accelerated Pavement Testing Facilities “APT”
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
2016 SCAPA Summer Conference July 23, 2016 Leland Colvin, P.E., Deputy Secretary for Engineering Todd Steagall, P.E., Director of Construction.
Update on the current APT Project in Texas
Critical Factors Affecting Asphalt Concrete Durability
NCAT Pavement Test Track
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
Update from FHWA Emulsion Task Force
Evaluation of Cracking Resistance and Durability of 100% Reclaimed Asphalt Pavement Mixtures Hesham Ali, PhD, PE. Mojtaba M. Afzali.
Research Implementation WHRP Flexible Group
Presenters: Sumon Roy1 and Badrul Ahsan1
Update on the current APT Project in Texas
2018 Pavement Workshop May 23-24, 2018
Performance Assessment of 100% Recycled Hot Mix Asphalt
Best Practices on the Use of RAS
Dr. Randy West, P.E. Director / Research Professor
Effect of Recovered Binder From Recycled Shingles
AASHTOWare Pavement-ME Design Software: Materials Library
Louisiana Accelerated Pavement Research Facility
2019 Pavement Workshop May 21-23, 2019
Superpave5 Superpave Design at Five Percent Air Voids
Warm Mix Asphalt & Recycled Asphalt Pavements
Warm Mix Asphalt & Recycled Asphalt Pavements
Presentation transcript:

High Recycle with WMA Fatigue Cracking Experiment AFD40(2) - April 11, 2013 Nelson Gibson, Ph.D., P.E. FHWA Office of Infrastructure R&D

Facility Overview

Past Accomplishments –Influence of Tire Type on Performance –Original Superpave Binder Validation –Ultrathin WhiteTopping –Revised Superpave Binder Validation –Delay of Top-Down Cracking with 4.75mm NMAS Overlay

Fully Published Final Report /infrastructure/pavements/ /index.cfm

Recommended Test for Fatigue Cracking DENT = Double Edge Notched Tension CTOD = Calculated Critical Tip Opening Displacement Originates Ministry of Transportation Ontario Equipment: AASHTO T-300 Force Ductility Written Test Method in Appendix

Stakeholder Input on Next ALF Exp. Combined Polling Results 1.Fatigue performance of High RAP HMA & Overlays 2.Cracking & durability of ultrathin HMA overlays as pavement preservation 3.Thinner & cheaper perpetual pavements with premium HMA 4.Cost effectiveness of high-modulus high binder HMA base 5.More structure oriented experiments and less binder- oriented experiments 6.Shorter turn around time

Convergence of Two Initiatives High RAP Content Less virgin binder Degree of mixing? Cracking/durability performance one of highest concerns Warm Mix Asphalt Sometimes less asphalt content than HMA Cracking less concern Affect aging and//or blending?? Better?? Medium/Long Term Catch Up with HMA?? OBJECTIVE: Establish realistic boundaries for high- RAP (& RAS) mixtures employing WMA technologies based on percent binder replacement and binder grade changes when combined together.

300 o F o F240 o F o F None FoamChem.None FoamChem. 0%  20% ABR RAP-only  20% ABR 1,2 RAP+RAS  (avoid) 40%-50% 2 RAP by weight  40%-50% ABR 2 RAP-only  40%-50% ABR RAP+RAS (avoid) RAP Content WMA / HMA Production Temperature Warm Mix Technology COMBINED WMA & Hi-RAP Full Scale ALF Experimental Design PG64-28 PG70-22 PG64-28 PG Let the contract determine the proportion of RAP:RAS, i.e. 15:5 or 13:7. Production Tolerance Needed on ABR 2 Preconstruction will include evaluation with FHWA input of the mix’s effective blend PG

Key Features of Experiment Focus on fatigue cracking, temp. controlled at 20 o C no high temperature rutting * Three year completion –2 years of loading –2 ALF units allow simultaneous loading Unmodified binder for all lanes, but 2 different grades WMA Technology which does not change PG grade 10 kip single wheel = 20 kip equivalent axle 4-inch total asphalt thickness

Tonnage Each Constructed Lane will Require Waste 30 Tons Actual Test Lane 50 Tons Test Strip (Parking Lot)109 Tons –Total Production: 189 Tons Total Mix1890 Tons Total RAP Required + extra 655 Tons –Have contractor set aside reserved stockpile? –About 19 ft tall & 54 ft wide

12 43 In each Lane there are 4 Test Sites Current planning is to use only 1 of 4 for the “core of the experiment” Leave 3 other sites to explore the following at a later date…possibly?: –Long term aging (natural or accelerated) –Rehab Study: How Deep Should We Mill? –Extension of life from pavement preservation treatments

12’ x 7’ => 96 Cores 12’ x 12’ => 225 Cores 12’ x 15’ => 270 Cores Total = 591 Cores

Laboratory Characterization Field Core 0, 1, 2, 3, 6, 12, 18, 24, 36 months + Before & After each ALF Test Plant Produced Mix Laboratory Tests on Immediate Compacted, Reheated, Long Term Oven Aged Mix Design & Laboratory Batched Tests on Short Term Oven Aged and Long Term Oven Aged o Hamburg WT, |E*|, Fatigue, TTI Overlay, SST RSCH o High Temp IDT, SCB, TSRST, Extract & Recover Binder o Hamburg WT, |E*|, Fatigue, TTI Overlay, Beam Fatigue o Flow# 3 types, SCB, TSRST, Extract & Recover Binder o Hamburg WT, |E*|, Fatigue, TTI Overlay o Flow# 3 types, SCB, TSRST, Extract & Recover Binder

Lab Characterization to Address Field Sequencing

Next Steps Construction coordination meeting July 18 th 2012 Gather RAP/WMA ETG input on July 24 th 2012 November 2012 – 95% PS&E Review 01/30/ ADVERTISE 02/12/2013– Pre-Bid Conference 03/28/ OPEN BIDS 04/ AWARD 04/ P + P BONDS 05/ Effective Notice To Proceed 07/ End Schedule A Construction 8-9/2013 – Begin APT Loading

Fed Biz Ops Advertisement Search “TFHRC 50(3)” de=form&id=936d1c9bb2c4d5c3a155c2593c58 707a&tab=core&tabmode=list&= de=form&id=936d1c9bb2c4d5c3a155c2593c58 707a&tab=core&tabmode=list&

Questions? Comments?? Criticisms???