Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 1 Proposal for Numerical Studies for PIP-II at Fermilab Leonid Vorobiev Muons, Inc.,

Slides:



Advertisements
Similar presentations
Feb 09, 2012 L. Vorobiev, I. RakhnoPage 1 Multi-Turn Stripping Injection and Foil Heating with Application to Project X Presentation Based on: Phys. Rev.
Advertisements

ISIS Accelerator Division
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 1 Numerical Studies for Proton Improvement Plan (PIP) at Fermilab Leonid Vorobiev Muons,
Alexandr Drozhdin March 16, 2005 MI-10 Injection.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
NON-SCALING FFAGs: questions needing answers Andy Wolski The Cockcroft Institute, and the University of Liverpool Department of Physics. BASROC-CONFORM.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Eric Prebys 10/28/2008.  There is a great deal of synergy between PS2 and the Fermilab Main Injector during the Project X era.  High energy ion transport,
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Extending FETS with a Ring Electron models are not sufficient for simulating the beam.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Acceleration System Comparisons S. Machida ASTeC/RAL September, 2005, ISS meeting at CERN.
 Advanced Accelerator Simulation Panagiotis Spentzouris Fermilab Computing Division (member of the SciDAC AST project)
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
ISIS Upgrade Modelling Dean Adams On behalf of STFC/ISIS C Warsop, B Jones, B Pine, R Williamson, H Smith, M Hughes, A McFarland, A Seville, I Gardner,
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ADSR Inst.July 2009 From PAMELA to ADSR, T.Yokoi From PAMELA to ADSR Takeichiro Yokoi (JAI)
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Numerical Simulations for IOTA Dmitry Shatilov BINP & FNAL IOTA Meeting, FNAL, 23 February 2012.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Collimation Concept for Beam Halo Losses in SIS 100
Progress in the Multi-Ion Injector Linac Design
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Jeffrey Eldred, Sasha Valishev
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
LHC (SSC) Byung Yunn CASA.
Monday Week 1 Lecture Jeff Eldred
Injection design of CEPC
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC Ion Integration Goals
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
Multi-Ion Injector Linac Design – Progress Summary
HE-JLEIC: Do We Have a Baseline?
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 1 Proposal for Numerical Studies for PIP-II at Fermilab Leonid Vorobiev Muons, Inc., Batavia, IL 60510, USA

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 2 Introduction Since present I’ve been developing software and accelerator designs for Fermilab and Muons Inc., related to : - Project X - Mu2e - Booster upgrade - Electron Cloud in Main Injector - Electron Lens (hollow e-beam) for collimation in LHC - Space Charge for HL-LHC - Other Muons Inc. projects Now FNAL may be interested in Muons Inc. continuing the work, in relation to PIP-II

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 3 List of Topics for PIP-II 1. Non-linear lattices with SC. Resonance extraction. 2. Multi-turn injection painting 3. Stripping foil heating/survival 4. Transition crossing. Acceleration scenarios. 5. Momentum stacking. Beam loading. Feedback. 6. Beam notching during injection into Booster 7. Linac/FEL. Electrons/Ions. DTL & SRF. Back- bombardment, 3D Space Charge, etc. 8. ECloud

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 4 1. Non-linear lattices with SC. Resonance extraction. Non-linear lattices in ORBIT: third-order resonance compared to pure linear lattice Ref.:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 5 1. Non-linear lattices with SC. Resonance extraction. Ref.:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 6 2. Multi-turn injection painting (MI) Horizontal (up), Vertical (bottom) Stripping Foil Kickers + Bumps Longitudinal Painting from 325 MHz Linac into 52.8 MHz Main Injector Ref.:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 7 3. Stripping foil issues Hits on the Foil Scenario A (582-turn injection) Particle hit number on the foil during 1st, 4th, and 6th cycles are: 62067, , and , respectively. The total hit number is Average number of interactions with foil =33 (for each injected particle). Hit density at the maximum of the distribution =1.31e+14 proton/mm^2 at 2.52e+11 particles injected at every turn. Ref.:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 8 4. Transition crossing. Acceleration scenarios. Rapid-cycling synchrotron FNAL Booster 20,000 turns acceleration ramp Synch. phase – self-consistent Works for Main Injector CERN SC 2013:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 9 5. Momentum stacking. Beam loading. Feedback. Mu2e Exp. at Fermilab: Extinction interval for mu2e detector: NO STRAY PROTONS Long. dynamics w/o (left), with (cent) Beam Loading. Histogram (right) CERN SC 2013:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev Beam notching during injection. Acceleration, Transition, Extraction. Notched beam presumably facilitate extraction. Survival during acceleration, Transition, 3D SC, Wakes Beam Loading, Synchro-beta res. CERN SC 2013:

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev Linac/FEL e - /p/ions. DTL & SRF Back-bombardment, 3D SC, etc PIP – for protons Example FEL – for electrons – serve as software demo for PIP-2: RFQ, DTL normal-conducting/SRF. SuperFish 3D SC & Geometry EGun (z=0) + 3SRF Cavities + Undulator (z>120 cm, not shown)

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev FEL e - BB, 3D SC, etc X (red),Y (blue) dynamics vs Z. Halo formation. FEL 700MHZ, X&Y Dynamics Particle densities contour lines (up), 3D (down) vs Z in phase units (degrees). Halo formation observed. Important: self-consistent synchronous phase

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev FEL e - BB, 3D SC, etc FEL 700MHZ, dynamics Energies (blue) and Current (green) vs Z in phase units (degrees). Back-bombardment (BB) observed.

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 14

Muons, Inc. Numerical studies for PIP-2, Aug. 25, 2014L.G.Vorobiev 15 Summary of new work to be done 1.PIP-II Booster, Main Injector with Multi-Bunch + Nonlinear Lattice + 3D SC + Wakes -Injection, notching, acceleration, stripping -Painting, foil, transition X-ing, extraction -Beam Loading, Feedback -ECloud (trial, errors) 2. PIP-II Linacs with 3D SC, Real 3D Geometry + Synch. Phase - Ion Source, RFQ, DTL Linac, SRF,… 3. Additional PIP-II needs …