1 Luminosity of 10 35 cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001.

Slides:



Advertisements
Similar presentations
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Advertisements

S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Accelerator Plans at KEK
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II.
10 36 ??? 20 Apr K. Oide Super B Workshop.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
1 SuperKEKB Upgrade project of KEKB KEK Yukiyoshi Ohnishi.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Beam Induced Pressure Rise in Ring, Dec. 9-12, Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC design status V.Ptitsyn for the eRHIC design team.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Nov. 28, 2003RF System Overview, K. Akai1 RF System Overview Contents: ◆ High beam current and measures ◆ Construction ◆ Damping ring RF system ◆ Crab.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
T. Agoh (KEK) Introduction CSR emitted in wiggler
SuperB Injection, RF stations, Vibration and Operations
Linac possibilities for a Super-B
Machine parameters of SuperKEKB
Electron cloud and collective effects in the FCC-ee Interaction Region
The PEP-II Interaction e+e- Factories Workshop
Measurements, ideas, curiosities
Injector Chain General and more about p-RCS
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Overview of SRF system of Ring and Linac (1)
Electron Source Configuration
LAL meeting on e+ studies, Oct. 2010
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Design of Interaction Region
CEPC SRF Parameters (100 km Main Ring)
MEIC New Baseline: Luminosity Performance and Upgrade Path
HE-JLEIC: Boosting Luminosity at High Energy
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
MEIC New Baseline: Part 7
MEIC low rep-rate operation and path length
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
MEIC Alternative Design Part III
Presentation transcript:

1 Luminosity of cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001

2 Preliminary Plan Luminosity of 4.49x10 33 cm -2 s -1 was achieved at KEKB. Major target of B physics is CP violation, especially sin2  1 (or sin2  ): –Belle/KEKB : 0.58±0.33 (10.5 fb -1 ), March –Int. luminosity from KEKB is 30 fb -1 now. Statistical error will be –There is a chance to say 3 S.D. significance this summer(?). Integrated luminosity of100 fb -1 is needed to achieve the required accuracy of 0.1 for sin2  1. We expect to reach 100 fb -1 within 1.5 year even if the luminosity is still 4x10 33 cm -2 s -1. (very conservative) BTeV and LHC-B will become strong competitors in 5 years.

3 Preliminary Plan (cont’d) KEKB will loose its competitiveness in –Luminosity of BTeV or LHC-B corresponds to cm -2 s -1 e+e- collider. SUSY related B physics at cm -2 s -1 e+e- collider is a very attractive choice. We hope to upgrade KEKB to Super KEKB(10 35 cm -2 s -1 ) during and begin physics run in We try to improve luminosity to cm -2 s -1 up to KEKB is R&D machine for Super KEKB. Super KEKB project consists of theorists/experimentalists/accelerator staffs of universities and KEK. (18/5/30) We will submit LoI to HEP community and KEK in winter 2001

4 Parameters for Super KEKB(10 35 cm -2 s -1 ) Luminosity formula: Beam-beam tune shift parameters: Assumed that the “transparency” conditions: Alternative expression for luminosity:

5 Parameters for Super KEKB (cont’d) Design luminosity of KEKB is cm -2 s -1. To achieve cm -2 s -1 : Squeeze beta at IP. :  y *   z  3 mm (coherent radiation?) Higher beam current : 10 A for LER and 3 A for HER

6 Coherent Synchrotron Radiation Power of coherent synchrotron radiation (Kheifets,Zotter) N: particles/bunch  : bending radius h: height of chamber Particles: Gaussian distribution incoherent E ∝ √N P ∝ N coherent E ∝ N P ∝ N 2 zz zz coherent condition  z ≦ 

7 Coherent Synchrotron Radiation(cont’d) The ratio of coherent power to incoherent: LER: 3.5 GeV Bending radius:  = 16.3 m Chamber height: h=47mm Coherent radiation can be ignore for 3mm bunch length (?)

8 Questions Beam current is 10x3 A. Beta(y) at I.P = 3 mm Bunch length = 3mm Energy(or Particle) exchange: –3.5 GeV e + /8 GeV e - to 3.5 GeV e - /8 GeV e + –Advantage: Beam blow-up due to photoelectron cloud(?) If fast ion instability for electron beam is ok. Injection (injection rate: e - > e + at KEKB). Once machine parameters are fixed, questions are: –RF system ? –Vacuum system ? –IR design ? –Injector ?

9 Layout of KEKB (not Super KEKB) Double ring, Asymmetric collider Circumference: 3km

10 RF System Beam current at Super KEKB is 3 times larger than KEKB. Number of bunches is or 5120 ? If we choose harmonic number of15000, we have to develop completely new 1.5 GHz RF system. (Current RF frequency is 508 MHz.) We consider RF frequency is 508 MHz to minimize the cost, time, and man power. Normal conducting cavities (ARES) for LER and normal+superconducting cavities(SCC) for HER. The severe requirement on HOM damping. Rf system for LER depends on whether wiggler exists or not.

11 RF System (cont’d) RF parameters (RF unit includes klystron, power supply, wave guide, circulator, dummy load, cooling, etc)

12 RF System (cont’d) RF system needs small modifications if we keep 508 MHz RF frequency used at KEKB. However, we have to develop new HOM damper for higher beam current. We increase NC(ARES) cavities from 32 to 36 and SC cavities from 8 to 12. –We should have 36 NC(ARES) cavities for KEKB, we only add 4 SCC. Klystron for Two NC(ARES) cavities is modified to Klystron for one NC(ARES) cavity. Number of RF units becomes twice of KEKB. We consider RF system with wiggler for LER at this stage.

13 Vacuum System Parameters of vacuum system Max. cooling power is 〜 8 MW. New powerful cooling system has to be built. This issue is for institute not for accelerator division. It is difficult for copper chamber. 510 A/m 130 A/m 200 kV/m These values are tested and confirmed.

14 Vacuum System (cont’d) Ante-chamber for positron ring: We have no experience even if GlidCop is used. R&D for material. Make incident angle slant? practicable In the case of energy exchange

15 Vacuum System (cont’d) Movable masks. Photo shows the early version of movable mask. SiC blocks were equipped as a HOM absorber, since trapped mode was very serious. However, beam current was limited by the absorbed power(estimated to be 500W). This kind of mask can not be used for huge beam current machine. The most serious problem is damage of mask head. R&D for the structure and material is needed.

16 Vacuum System (cont’d) Latest version of movable mask at KEKB(LER). Movable chamber. The chamber works as a mask. There is no trapped mode. We have already observed mask damage(looks like previous photo). To avoid mask damage, mask should be hybrid structure of Al and copper.(Just make energy loss point at mask)

17 Positron Beam Blow-up Positron beam blow-up caused by photoelectrons is reduced by solenoid field. Beam size measurement using SR interferometer. Spec. Luminosity/bunch All solenoid off All solenoid on Partial solenoid off

18 Positron Beam Blow-up (cont’d) Solenoid coils are also necessary for Super KEKB. Chambers in positron ring are wrapped by solenoids: –Straight section as well as bending section. –Bellows, inside of steering magnets, …

19 Injector Short lifetime due to collision: 10A/100 min=1.7 mA/s. Powerful injector is needed to keep the rings filled up. Super KEKB will be very inefficient machine. KEKB(current status:4.3x10 33 ) 3mA/s(e-)/1.5mA/s(e+) 800mA(HER)/900mA(LER) High efficiency! Super KEKB 3mA/s(e-)/1.5mA/s(e+) 3A(HER)/10A(LER) Top-up Super KEKB(upgrade injector) 15mA/s(e-)/3mA/s(e+) 3A(HER)/10A(LER) Inj.+dead time=6.5min Inj.+dead time=50min Inj.+dead time=12.8min Luminosity efficiency

20 Injector (cont’d) Improvement of Injection rate: –Charge intensity can be increased from 1nC to 5 nC for electron. –Positron charge becomes twice, if two-bunch acceleration is performed. We have already tested. Energy exchange(3.5 GeV e-/8GeV e+) may help beam blow-up due to photoelectron cloud in positron ring. To accelerate positron up to 8 GeV, there are two possibilities: ① Improvement of accelerating electric field(simple): C-band is a candidate instead of S-band. One of techniques of Japan Linear Collider. ② Recirculation(S-band) with damping ring(similar to SLC): In order to do recirculation, next RF pulse is used. Damping ring is needed so that beams wait for next RF pulse. Beam transport lines are very complicated.

21 Injector (cont’d) e+ Target e- 3.7 GeV ECS KEKB e+ 3.5 GeV J-Arc 1.7 GeV S-Band Gun C-Band B A C MeV/m 1.1x x3 = Max 8.8 GeV Layout of injector for super KEKB Layout of injector for KEKB Super KEKB e- 3.5 GeV Super KEKB e+ 8 GeV ECS J-Arc 1.7 GeV Gun B A C e+ Target e- 3.9 GeV KEKB e- 8 GeV S-Band Preliminary plan 10nC e- for e+ production 1 nC e- for injection

22 Summary Machine parameters of Super KEKB: –Beam current: 10A(3GeV e-)/3A(8GeV e+) –Beta at I.P:  y *=3mm –Bunch length:  z =3mm –Number of bunches: 5120 –Crossing angle at I.P: 15 mrad(?) RF system is not so difficult (practicable). –Development of HOM damper Vacuum system is very difficult. –R&D of materials and structure of vacuum chamber Injector will be widely modified to exchange energy and improve beam intensity. –C-band or recirculation –Two-bunch acceleration