Presented By: Gwen Nuttall – Chief Operating Officer, Nichole Day Executive Chief Nurse Prepared By: Information Team Date Prepared: 15 th March 2011 Subject:

Slides:



Advertisements
Similar presentations
SAFER Patient Flow Bundle The patient flow bundle is similar to a clinical care bundle. It is a combined set of simple rules for adult inpatient wards.
Advertisements

Special Measures Action Plan Sherwood Forest Hospitals NHS Foundation Trust September 2014 KEY Delivered On Track to deliver Some issues – narrative disclosure.
Acknowledgements RHH ED staff Safety and Quality Unit RHH for their participation and valuable contribution Next Steps It is envisaged over the next 12.
Scottish Stroke Care Audit System NHS Fife 2012 data Dr Sue Pound, Stroke Consultant Hazel Fraser Stroke Co-ordinator Isla McBain, Stroke Audit assistant.
Inefficiencies in provision of acute care with poor use of estate Dependence on hospital care with failure to transfer care to community Need for more.
28th March 2013 Debbie Newton Chief Operating & Finance Officer
Annual Health Check 2007/08 Summary of Trust Action Plan.
Trust Programme Board 15 July Transforming Services Key Programme Status 2 Key Risks and Issues 4 Key Benefits & Measures 3 Summary status 1 Risk/IssueMitigating.
Presented By: Gwen Nuttall – Chief Operating Officer, Nichole Day Executive Chief Nurse Prepared By: Information Team Date Prepared: 18 th January 2011.
The BHRUT Clinical Strategy Presentation for stakeholders, patients and the public.
© Grant Thornton UK LLP. All rights reserved. Review of Sickness Absence Vale of Glamorgan Council Final Report- November 2009.
Standard 5: Patient Identification and Procedure Matching Nicola Dunbar, Accrediting Agencies Surveyor Workshop, 10 July 2012.
An Anaesthetist’s perspective on Same Day Surgery
*Data from July-December 2013 is for GNEF CHP only. From January 2014 onwards this will also include Acute Services Division data. SAFEEFFECTIVE C difficile.
RAPID IMPROVEMENT EVENT involving partner organisations
Sunderland Neutropenic Sepsis Audit Melanie Robertson – Nurse Consultant Oncology.
Acute Quality Standards Dan Beckett Acute Physician CMO Advisor for Acute & General Medicine.
Council of Governors Meeting Elaine Hobson Chief Operating Officer January 2010, Item 7 Relates to Domain 1 (C4a) and Domain 5 (C18, C19)
0 West Suffolk Hospital NHS Trust Report To:Trust Board Date: July 2011 Title:Quality and Performance Report Report of:Nichole Day, Executive Chief Nurse;
NHS Fife Winter Preparation  Winter plans in place in each part of system  Joint escalation procedure agreed and in place  Agreement on information.
A Regional Approach to Improvement Julie Branter Associate Director for Clinical Governance and Patient Safety 21 September 2010 South West Strategic Health.
Improving Patient Safety at the RD&E Council of Governors January 2010, Item 9 Respond, Deliver & Enable.
Commissioner Feedback for SLAM CQC Inspection in September 2015 Engagement with Member Practices 1.
Guildford and Waverley CCG update 16 th July 2015 Shaping healthcare for you … and your family.
Implement new Emergency Pathways that ensure patients are cared by the right person, at the right time. …………………………………………………………… Establish a daily dashboard.
Presented By: Gwen Nuttall – Chief Operating Officer, Nichole Day Executive Chief Nurse Prepared By: Information Team Date Prepared: 20 th December 2010.
The Health Roundtable Early detection of patient deteriopration Presenter: (delegate name) Innovation Poster Session HRT1215 – Innovation Awards Sydney.
Presented By: Gwen Nuttall – Chief Operating Officer, Nichole Day Executive Chief Nurse Prepared By: Information Team Date Prepared: 19 th May 2011 Subject:
Improving handover in the ED setting “SBAR“. Objectives of the “SBAR Squad from A&E” Where we are Where we need to be What do our staff think How far.
South London Healthcare NHS Trust Service changes March 2011.
On-line briefing for Program Directors and Staff 1.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Acute Myocardial Infarction (Heart Attack) Committee Membership: B. Majcher, APRN, C. Mulhall, APRN, K. McLean, MD, M. Jarotkiewicz RRT, MS, Administrative.
Standards for Better Health – update for Overview & Scrutiny Committee Jacqui Evans Clinical Governance Manager 22 February 2006.
Preparing for Winter 2011/12 Guidance Overview Stuart Low Planning Manager Scottish Govt NHSScotland Business & Performance Mgt Team.
Board Report - Performance September 2008 Produced by Business Intelligence (Performance)
Jason Holland 10/06/2013 Changing face of Unscheduled Care The Implementation of new roles within the Emergency Care Directorate across Pennine Acute Hospitals.
Reducing Mortality in AKI/ SEPSIS Patients Aintree University Hospital DEBBIE COWELL/SUE GALLAGHER 2015.
ED Capacity Management Admissions Flow through ED Tim Parke ED Consultant through ED.
Introduction In 2005, comparisons were made internally by word of mouth and externally with other Tenet Healthcare Corporation hospitals, Georgia Hospitals.
Is avoidable mortality a good measure of the quality of healthcare? Dr Helen Hogan Clinical Senior Lecturer in Public Health London School of Hygiene and.
Other Performance Standards A&E:- A&E performance against the 4 hour standard improved in March and the Trust achieved 97.8%. Year to date overall performance.
Presented By: Gwen Nuttall – Chief Operating Officer, Nichole Day Executive Chief Nurse Prepared By: Information Team Date Prepared: 15 th April 2011 Subject:
1 Hinchingbrooke Health Care NHS Trust CQC report October 2015 Inspection Chair: Helen Coe Team Leader: Fiona Allinson Quality Summit 2 February 2016.
1 Board Report – Performance January 2008 Produced by Business Intelligence (Performance)
Council of Governors Meeting December 2013 Beverley Geary Director of Nursing.
NHS West Kent Clinical Commissioning Group West Kent Urgent Care DRAFT Strategy Delivering a safe and sustainable urgent care system by
Greater Manchester Area Team Joint Health Overview & Scrutiny Committee 7 th April 2014 Performance Report to Operations Executive- 30 May
CLINICAL GOVERNANCE Presentation for Assembly of Governors Thursday 15 December 2011.
‘Preventing and treating blood clots’ The South Tees Anticoagulation Team 1.
JUST GIVE IT: a 2 phase study to audit the Immediate Management of Patients with Proven or Suspected Neutropenic Sepsis by Ally Gruber Acute Oncology Clinical.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
Safeguarding Adults in Acute Care The Role of the Safeguarding Lead.
Insert name of presentation on Master Slide Quality & Safety improvement Reporting.
Council of Governors Meeting Tim Bennett – Director of Finance and Steven Vaughan – Director of Operations &Performance July 2011.
Insert name of presentation on Master Slide Annual Quality Framework Quality & Safety improvement Reporting.
Nurse Led Discharge Mater Misericordiae University Hospital Hilda Dowler, ADON Nursing Quality.
Corporate Performance Report December 2012
Velindre NHS Trust June 10th 2011
Mortality and harm Learning Set. National context update
Introducing 1000 Lives Plus
2.13 Copyright UKCS #
Powys teaching Health Board
National Learning Session - 10th June 2011
Principal recommendations
Red2Green Why is this improvement work important?
Commissioner Feedback for SLAM CQC Inspection in September 2015
System Level Measures: Measuring Healthcare Improvement in NHS Wales
Introducing 1000 Lives Plus
Cardiff and Vale UHB Dr Graham Shortland
Presentation transcript:

Presented By: Gwen Nuttall – Chief Operating Officer, Nichole Day Executive Chief Nurse Prepared By: Information Team Date Prepared: 15 th March 2011 Subject: Integrated Quality and Performance Report - February 2011 Purpose: For Information Strategic Objective: To Achieve Performance Levels in accordance with the CQC “Standards for Better Health” Executive Summary: The paper focuses on the key core targets, identified by the Department of Health and the Care Quality Commission, summarising performance to the end of February It also provides the board with information to assess the Trust’s performance against quality indicators, including patient experience, clinical outcome and effectiveness and patient safety. Trust Board Committee – 25 th March 2011

SUFFICIENT Note the Trust Performance to February Failure to deliver the 4 hour core access target for the year. - Failure to achieve C-Difficile target for the year. Robust Action Plan developed. Performance Management and Monitoring. Improved Escalation Review of Cohort Unit

Contents 1. Introduction 2. Emergency Care A&E 3. Cancelled Operations 4. LOS 5. Outcomes & Effectiveness – Clostridium Difficile 6. Patient Safety 7. Risk Assessment 8. Patient Experience 9. Conclusion

1.& 2. Introduction & Emergency Care 1. Introduction: This report provides a briefing to the Board members on the performance against key targets up to February The paper focuses on the main targets, identified by the Department of Health and the Care Quality Commission. 2. Emergency Care – A&E Target: 95% of patients seen/treated/discharged within 4 hours The Trust did meet the 95% Target for the month of February 2011 (98.59%). Key actions:- EAU posts to be advertised in February. Integrated Action Plan agreed and monitored weekly, via weekly A&E departmental meetings. Review of medical commitments in morning and afternoon commenced. Job Plans are being updated. Bed Meetings reviewed and enhanced. Standard operating procedures commenced. Short stay beds introduced on ward G5. Trust will pilot Discharge/Transfer Lounge in March to assist with flow of patients and discharge planning. The updated detailed A&E 4 hour performance action plan is attached as a separate paper. Page 4

3. Cancelled Operations The target was not met for February at 0.85% A decrease in performance from last month. Out of Theatre time (41%) and Lack of theatre time (29%) are the highest reasons for cancellation. Urgent Patients (18%) and Equipment issues (12%) follow. Target 0.8% Actual 0.85% (YTD) The Productive Operating Theatre project (TPOT) is in progress, and will be reported to the Board in March Page 5

4. Length of Stay (Spells) Page 6 The targets are from Dr Foster ‘Expected’ positions using 09/10 as a benchmark. Non Elective LOS for Medicine is above target – Actions to improve this performance is linked to discharge action plans and implementation of EAU model and short stay beds. Non Elective LOS for Surgery remains below the expected level, but has seen an increase in 2010/11. This is related to complex elderly patients. Elective LOS for Surgery is similar to last year. Review of day case and day of surgery activity continues, especially in urology. The productive theatre will also focus on Urology.

7 Hospital Standardised Mortality Ratio HSMR has been fairly consistent over recent months and is below the expected level as can be seen by the overall mortality shown in the graphs and the table giving a mortality rate for the five Dr Foster - How Safe is Your Hospital indicators. These tables provide information on relative risk, with red, blue and green traffic lighting. Blue indicates that the score is within the standard deviation. We continue to monitor the overall HSMR at the Patient Outcomes Group. We also monitor the HSMR for emergency patients and identify any individual diagnoses that trigger any alerts. These are all investigated and reported to the Quality and Risk Committee and Patient Outcomes Implementation Group. 5. Outcomes and Effectiveness Page 7 National Rate from last reporting period Jul 08- Aug 09 Aug 08- Sep 09 Sep 08- Oct 09 Oct 08 - Nov 09 Nov 08 - Dec- 09 Dec 08 - Jan 10 Jan 09 – Feb 10 Feb 09 -Mar 10 Mar 09 -Apr 10 Apr 09- May 10 May 09 -Jun 10 Jun 09 -Jul 10 Jul 09- Aug 10 Aug 09- Sep 10 Sep 09- Oct 10 Oct 09- Nov 10 Nov 09- Dec 10 Rolling 12 Month HSMR-All Admissions Rolling 12 Month HSMR-Non Elective SMR Stroke (Acute Cerebrovascular Disease) SMR - Heart Attack (AMI) SMR - FNOF Mortality from Low Risk Conditions

8 5. Outcomes and Effectiveness Page 8 Infection Prevention The C. difficile stretch target for 2010/11 is 29 hospital cases. The PCT contract is 42 cases. In February there were a further 2 hospital attributed cases, bringing the total to 34. All patients were transferred to the F9 cohort unit within the time frame specified. The Trust continues to achieve excellent results in other infection control KPIs. There were no hospital associated MRSA bacteraemia and High Impact Intervention performance has improved with scores ranging from %: HII 1a: CVC Insertion scored 93% in the Critical Care Unit due to a documentation issue. This is being addressed by the Matron. HII 2b: Peripheral cannula ongoing scored 97% due to VIP scores not recorded. All other HII scored 100% compliance. Antibiotic Prescribing There was an improvement in performance to 95% in January. The revised drug chart which includes a specific antibiotic prescribing section requiring a medical review signature every 3 days has been implemented from the 1st March.

9 6. Patient Safety Page 9 Pressure Ulcers The number of patients with ward acquired pressure ulcers decreased this month to 12 with 1 Grade 3 and 1 Grade 4 pressure ulcer reported Themes from RCAs: Four pressure ulcers were considered avoidable and root causes were identified as infrequent assessment of patients and a lack of proactive pressure ulcer prevention plan. Eight pressure ulcers were classed as unavoidable as all aspects of the pressure ulcer management bundle were implemented Actions: The pressure ulcer prevention group will be driving improvement through the development of a strategy and workstreams focusing on identified problems from RCAs. To ensure that appropriate action is taken from the risk assessment, the matrons will be moving their focus from incident management to risk management with an early warning system from the Ward to Matron.. Pressure ulcer incidence will be reviewed at Directorate Performance Meetings.

6. Patient Safety Page 9 Patient Falls The total number of falls in February was of these falls resulted in harm to the patient. Themes from RCAs : Only minor harm was caused. Of the falls with harm, all were elderly patients and 75% of these patients had delirium/dementia. Five of the sixteen falls were considered preventable as 1:1 nursing staff were requested to “special” but were unavailable and one patient was inappropriately left alone on the commode by a physiotherapist. Actions: Driving forward the dementia strategy may decrease falls in this patient group. A SWIFT bid has just been approved which will provide two trainers delivering dementia/delirium knowledge and practice development as well as a County project lead who will embed the change process and develop pathways of care, policies and guidelines in order to ensure that the practice development is embedded and sustained. The Falls Group has updated the documentation as part of their action plan reported recently at the Operational Group meeting. All completed parts of the documentation form our falls management plan: screening, risk assessment, medical review, high risk care plan and post-fall protocol. The Matrons audit 10 patients/ward area/month with a random sampling strategy to ensure that our falls management plan is adhered to. 10

11 6. Patient Safety Venous Thrombo-Embolism (VTE) Verbal update to be provided at the meeting by Dermot O’Riordan. Page 10

12 6. Patient Safety Page 12 Root Cause Analysis (RCA) Performance data: A total of 11 RCAs were undertaken in February: 6 SIRIs and 5 reds. These related to: 3 unexpected deaths, 2 Pressure Ulcers, 2 falls and 1 regarding discharge planning. 2/11 have an associated complaint letter. 2/5 of the RCAs (non SIRI) were late (both) by seven working days. No SIRI RCAs were late. A delay in receipt of the chronologies meant that the meetings attendees were not identified early enough to set the meetings up within the deadlines. The process has now been amended to ensure that the initial chronology request includes an "attendees required" question to ensure that delays in receipt of final chronology do not impact on meeting dates. In March all eight RCAs due have dates set within the 45 working day limit. All the 10 actions outstanding in last month's dashboard have now been completed. An additional 10 became due at the end of February all from one RCA. Of these 6 are still outstanding. The action plan from this RCA was the subject of in depth discussion at the Operation Steering group on the 28th February. As a result it was agreed to take an organisational approach to the issues raised rather than locally to the area. This has led to a review of the timeascales for implementation. The key issues identified include; a)The induction of Locums across the Trust, b) Consultation with the Consultant before all invasive procedures, however minor, and c) An update to the aspiration policy. Patient Safety Incidents resulting in harm: Please refer to SIRI report for details.

13 7. Risk Assessments Page 11 Risk Assessments in date There are currently 112 (as of 9 th March) active risks on the Risk Register. Of these, 99 (88%) are in date, while 13 (12%) are late for review. This is a significant improvement from last month’s performance. The number of risk assessments beyond their review per Directorate are listed below: 1) Medical = 5 2)Trust-Wide = 3 Additional controls in date Each active risk should identify additional controls which are required to reduce the risk rating to a tolerable level. Currently there are 155 additional controls identified by the active risk assessments. Of these, 124 (80%) are within the agreed timescale, while 31 (20%) have passed their agreed implementation date. This is a significant improvement, as at the start of the year only 51% of the additional controls were in date. The number of additional actions beyond their review date per Directorate are listed below: 1) Medical = 9 2) Trust-Wide = 7 3) Facilities = 6 4) Surgical = 5 5) Finance and Information = 3 6) Human Resources = 1 The Directorate Governance Performance Meetings and Operational Steering Group reports also detail the actions and status required so that this can be managed/progressed at the Directorate level, and where necessary considered at the Operational Steering Group. Additional Controls in Place

14 Page 13 Patient Satisfaction (Patient Experience Tracker) Overall satisfaction was 95%. No questions scored a red performance rating. Patient Satisfaction Questionnaires (PSQ) (paper) All remaining clinical areas use this method for reporting and overall satisfaction remained at 82% although only 173 patients completed the paper questionnaire. The questions with red performance ratings relate to noise at night and discharge advice re: who to contact/medication side effects. The noise at night is particularly an issue in the midwifery areas and also medical wards due to confused patients. The low score re: discharge advice is related to the timing of the questionnaire rather than lack of advice as patients wait for TTOs and complete the questionnaire prior to being given side-effect advice. A number of wards also use volunteers to complete the questionnaires with patients prior to side-effect information being given. Actions: Increase the number of patient respondents. Continue to advise ward areas to ask patients to complete the patient satisfaction questionnaires at discharge. Advise the patient discharge lounge staff to ensure questionnaires have been completed. Proactive management of sleep routines for patients with dementia. CQUIN Achievement of 2% patients surveyed this month was achieved by all CQUIN reportable areas. 8. Patient Experience

Page 14 Same Sex Accommodation There were no breaches of same sex accommodation criteria during February. Environment and Cleanliness

9. Conclusion The action plan remains in place and performance has improved in January with regard to the 4hr standard. One of the major challenges for the Trust, was in adherence to same sex accommodation, the re-configuration in December has improved performance. Performance with regard to C-Difficile, full RCA’s have been carried out and actions implemented specifically with regard to anti biotic prescribing and monitoring. Progress on other KPI’s is being made. Page 15