8. MARACAIBO CHANNEL According to the International Energy Agency IEA, Venezuela produced 2.5 mmbbls per day during year 2006. A number of 2,234 port calls.

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

Shipboard Procedure Manual
Presentation Requirements in the Marine Mode – Private Boats.
NGA World Port Index SNPWG 18 Michael Kushla 3 December, 2014
Crew Visas FYBA Yacht Sales & The Law October 1, 2014 Laura Ross.
Ocean Lighretage Services Pvt. Ltd.
Planned Expansion of the Panama Canal a brief discussion of the potential effects Western Dredging Association, Eastern & Gulf Chapters 2007 Fall Meeting,
Don’t Forget to Invest in the Vessels: Two Linked Vessel-Focused Projects on the Columbia River.
MARITIME TRANSPORTATION MANAGEMENT
Domestic Water Carriers. Significance of the Industry Transport roughly 14% of total national freight 26.5% of total domestic ton-miles Employ close to.
LCDR Quincy Davis Commanding Officer Marine Safety Unit Baton Rouge.
TSIGELI PORT Located west coast Gulf of Pagassitikos Lat: 39  10’- 39  11’N & Long: 22  49’-22  51’E.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
Lumsden Point Development
1 Indian Port Sector By Hans Ole Madsen – CEO, South Asia for A.P. Moller-Maersk Port Pipavav.
Office of Marine Safety Actions of the Pilot and the Master Captain R. A. Jones.
Intertanko Vetting Seminar Athens – May 15, 2007 Tim Plummer President Tesoro Maritime Company.
Tomislav Skračić, MA Undergraduate English Course for MARITIME MANAGERS 6th Semester Essential reading: ● T. Skračić, Waypoint – English Textbook for Maritime.
Case Study of an industry Oil Refining Cheung Yee On 6SS ( 09 )
COMPUTING TRANSIT FEES - TERMS DISPLACEMENT: Mass of water displaced by the ship. Always less than the mass of the ship. It represents the volume of the.
North East Process Industry Cluster(NEPIC), UK. Kandla Port Mumbai Port Jawahalal Nehru Port Mormugao Port New Mangalore Port Cochin Port Tuticorin Port.
MARPOL 73/78 International Convention for the Prevention of Pollution from Ships, 1973, as modified by the Protocol of 1978 thereto. Technical regulations.
NCBFAA WEBINAR ADVANCE TRADE DATA ELEMENTS March 1, 2007 Moderated by Mary Jo Muoio and Alan R. Klestadt.
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA SPACES AND IN BLACK SEA REGION AS A WHOLE SPEAKER capt. Zhivko Petrov - Director of Directorate.
U.S. Coast Guard Unclassified
U.S. Foreign Waterborne Commerce and Vessels. OMB Assigns Responsibility for the FWTSP to the Corps FWTSP -- Foreign Waterborne Transportation Statistics.
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
Concerns of a Coastal State by Christian Breinholt.
Seminar Buenos Aires, 2004 Port Capacity Versus Port Safety by R. Groenveld.
Master / Pilot exchange
Underkeel Clearance (UKC) Project
ALEXANDRIA PORT AUTHORITY. Location Of Alexandria Port Main International Trade Route Alexandria Port.
Slovenian Regional Portal -Descriptive Overview Prototype Design Overview.
Harbor Safety Committee of the San Francisco Bay Region Established by state law to prevent oil spills in San Francisco Bay by planning “for the safe navigation.
Discovering Maritime Transportation. Significance of the Industry  Transport roughly 14% of total national freight  26.5% of total domestic ton-miles.
THISVI PORT Located Gulf of Corinth Lat: N & Long E.
Terminal Vetting Database II Latin-American Journey of SPM Operators Cartagena – Sep 29, 2006.
Investment Project Construction of corn transloading terminal in the port Yuzhny.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
Automated Manifest System (“AMS”) C. Jonathan Benner Troutman Sanders LLP Washington, D.C. 22 March 2004 Stamford, Connecticut.
1 Suez Canal Nikos Marmatsouris, FICS Senior Marketing Manager GAC Shipping S.A.
SOUTHWEST PASS AREA Examples of the Known Effects to Navigation Due to Channel Narrowing Associated Branch Pilots for the Port of New Orleans Associated.
Background: A Barge owned by Samsung collided with the M/V HEBEI SPIRIT on December 8, 2007, 10 km (6.2 miles) off the coast of South Korea, west of Taean.
CASE STUDY Distance: The port of Long Beach to China.
Main Channel Columbia River Channel is filled in to an unknown level with debris & sediment to mile 18 and maybe more. The Columbia River Jetty’s have.
Navigation NAU 102 Lesson 7. Introduction Nautical Publications Charts are not enough! We need more information. Voyage planning. Often paper & electronic.
ALASKA’S FOOD SUPPLY CHAIN. HOW DOES IT GET HERE?
Horizontal line line of sight. A fire 20km from a man has a bearing of 60 degrees west of north, how far is the fire north of a man, and how far.
TOPIC 5 SHIPPING TECHNOLOGY DEVELOPMENT. VOYAGE PLANNING & MANAGEMENT.
UNION OF CRUISE SHIP OWNERS & ASSOCIATED MEMBERS I Cruise Update at Posidonia 2012 Presented by Mr. THEODORE C. KONTES President Union of Cruise Ship Owners.
Project Ⅱ Task 6 Bill of lading. Section 2 III. Bill of lading A bill of lading (sometimes referred to as a B/L) is a transport document issued by a carrier.
Project Ⅱ Task 4 modes of transport ( 1 ). Learning Objectives To understand different modes of transport To understand basic concepts of ocean transport.
Program Agenda Cruising outlook Deployment considerations Factors influencing selection of ports.
Capt. Mike Lorino, President Capt. Michael Miller, Vice President Associated Branch Pilots for the Port of New Orleans Southwest Pass Area Examples of.
Do Now: A safety regulation states that the maximum angle of elevation for a rescue ladder is 72 degrees. If a fire department’s longest ladder is 110.
Super Ultra Large Container Vessel Operations in the Port of NY/NJ
Port Agent, Houston Pilots
UNCLASS Sail Boston 2017 June 17-22, 2017.
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA
33CFR158 COA.
SEATRADE Tanker Industry Conference
Oleh : Ir. Sjaifuddin Thahir, MSc.
EHCMA Hurricane Workshop
Vendor Compliance Academy will begin issuing non-compliance
Gatchalian, Rein Edrian Hernandez, Diana Erika Ramos, Aira Coline
Session I NAUTICAL PUBLICATIONS
Section 2: European Claims in North Africa
Kestutis Oginskas Inland Waterways Center Liepaja, 2011
Navigation on the Voyages of Discovery
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
Presentation transcript:

8. MARACAIBO CHANNEL According to the International Energy Agency IEA, Venezuela produced 2.5 mmbbls per day during year A number of 2,234 port calls were recorded during 2006 of vessels engaged in International trading. And 2,510 port calls of vessels on coasting trade. An excel table was provided to the LAP members, containing the main Pdvsa oil terminals in Venezuela, including the specifications of the crude oil, distillates and clean products produced by the Pdvsa refineries shipped through this terminals. As viewed on referred table, within Lake Maracaibo are located the following Pdvsa terminals: Puerto Miranda, Bajo Grande, La Salina, El Tablazo. Also there are coal terminals within the lake such as: Bulk Wayu the largest one, Palmarejo, El Bajo, La Ceiba. Access to both the Pdvsa terminals and the Coal terminals are through the Lake Maracaibo channel. There is also a Port facility called Maracaibo port, and some other minor chemical terminals including Pralca, Punta Camacho, etc. Other larger Pdvsa terminals around the country coastline are: Puerto La Cruz also named Guaraguao, and the Jose Complex including Jose Platform known as Taej, Jose terminal, Petrozuata, Bitor Monobuoy, Fertinitro, etc. This group of terminals are located at the east of Venezuela in the Anzoategui State. El Palito terminal located at the center and Amuay and Cardon north west Venezuela.

8. MARACAIBO CHANNEL Opec Crude Production per day during 2006 according to the IEA

8. MARACAIBO CHANNEL Number of vessel’s calls during 2006: East Venezuela: Crude oil, synthetic oil, lpg and clean products: Taej: 421Guaraguao: 572Petrozuata: 105Jose terminal: 160 Sub total: 1,258 vessels calling at above Pdvsa terminals Lake Maracaibo - Western Venezuela: Crude oil, lpg and clean products: Puerto Miranda: 230Bajo Grande: 174La Salina: 133 Sub total: 537 vessels calling at above Pdvsa terminals Lake Maracaibo: Coal shipments: Sub total: 195 vessels North West Venezuela: Clean products, distillates Fuel oil, etc: Amuay & Cardon: Sub total: 412 vessels calling at those Pdvsa terminals Other products such as: chemicals, petcoke, urea, ammonia, etc: Fertinitro + Petozuata solids + El Tablazo: 127

8. MARACAIBO CHANNEL Vessels loading capacity average: Lake Maracaibo - Western Venezuela: Puerto Miranda: roughly from: + 200,000 bbls to 538,000 bbls Average: + 450,000 bbls Bajo Grande: roughly from: + 12,000 to 450,000 bbls Average: + 200,000 bbls La Salina: roughly from: +70,000 bbls to + 520,000 bbls Average: + 400,000 bbls East Venezuela: Taej: roughly from: + 300,000 to -2,000,000 bbls Average: ,000 bbls Puerto La Cruz (Guaraguao): roughly from: + 60,000 to -1,000,000 bbls Average: ,000 bbls Above one third of the Venezuelan Crude oil production is shipped from the Pdvsa Terminals in Lake Maracaibo.

8. MARACAIBO CHANNEL IMPORTANCE OF LAKE MARACAIBO CHANNEL: Far more than one third of the Venezuelan Crude oil production is shipped from the Pdvsa Terminals in Lake Maracaibo. Around 732 vessels loaded with Crude oil, lpg products, clean products and coal, sailed through referred waterborne during 2006 and a similar or even a bigger number is expected to sail during LAKE CHANNEL SAILING RESTRICTIONS: High tide: 37`03" Medium Tide: 35`03" Low Tide: 33' 03" However the responsibility to determine the sailing draft is to be established by the master. One way sailing is restricted between buoys B13/B14 and buoys T33/T34. From same buoys T33/T34 further to the south sailing is allowed both ways simultaneously. it prohibits the entrance to the channel and transit to vessels exceeding one of the following main dimensions: Breadth:45.64 m Length:262 m SDWT:115,000 mt Vessel's with a breadth exceeding 35.5 m will be limited to a one way sailing on the channel section within the EM buoy and buoys B61/B62.

8. MARACAIBO CHANNEL Agents must inform to the Harbor Master office of those vessel's with breadth exceeding 35.5 m intended for inbound or outbound transit at least 12 hours previously to their channel entrance in order to be programmed and for transit control purpose. Vessels sailing outbound have preference to those on inbound transit. Maximum draft for vessel's sailing inward should not exceed 33´03". The outer channel is 15 miles; the inner channel is 12 miles; the lake channel that proceeds to the Maracaibo roads is 11 miles; and the main channel is 83 miles long. Distances from: EM buoy to Puerto Miranda (PM): +/-30 miles; PM to La Salina (LSN): +/-28 miles; PM to Bajo Grande (BG): 15 miles; PM to Maracaibo (MBO): 8 miles. Lake Maracaibo/ Channel Pilots boarding time considering tide restrictions: Please be informed that the Lake Maracaibo Harbor Master Office has the following pilot boarding schedule for vessels intended to sail on outbound transit based on tide restrictions: Tide’s heights of high water (H.W.) according to the Malecon Mareograph reference: Puerto Miranda:3 hours before maximum H.W. level at piers # 1 & # 5. Bajo Grande:4 hours before maximum H.W. level. La Salina: At Anchorage:5 hours before maximum H.W. level. Alongside:6 hours before maximum H.W. level. Tide’s heights of high water (H.W.) according to the Punta Palma Mareograph reference: Puerto Miranda:during maximum H.W. level at piers # 2 & # 6.

8. MARACAIBO CHANNEL Buoys report periodically issued by Agemar: The latest non official Buoys status report available was provided to the LAP members during the meeting. Same contains the following information: Buoys status report in the Maracaibo Channel- AGEMAR-: Buoys status report in the Maracaibo Channel - Feb. 7th, 2007 Kindly find attached the latest status report regarding navigation buoys in the Maracaibo Channel. We would like to expressly point out that this is a non-official information.  Breakwater Lighthouse has no operating light.  Rafael Urdaneta "amber" light not working.  Margarita Light off Due to the continuous changes in the buoy's operating lights, this information is only for your reference. If you need further details, please do not hesitate to contact us.

8. MARACAIBO CHANNEL Comments regarding the Buoys Status Report dated February 7th, 2007: According to same report there are: 23 buoys with no operating lights from Buoy EM (channel entrance) to Puerto Miranda from an existing number of around 61 (+/-37%). 07 buoys missing from its charted position (+/-11%). 02 buoys moved from its charted position (+/-3%). General comments: Many ship operators have decided to restrict their vessels inbound/outbound transit of the channel to daylight exclusively based of safety issues. We have non official information that the dredging of the channel was halted since the end of December 2006, and still has not resumed. Due to referred night time sailing restrictions some vessels have remain docked at Puerto Miranda awaiting for the daylight hide tide once loaded. Pdvsa has warned to ship operators, to charters and all parties involved, that extra berthing charges will be imposed to vessels refusing to sail during night time/high tide and after completion of loading. Another fact is that Pdvsa does not accept to apply an EDP procedure on its terminals, meaning that load cargo documents must be placed on board before the vessel departure. In some occasions this fact could impose a new restriction due to that the vessel might lose the hide tide well before the daylight is over if documents are not on board.