OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.

Slides:



Advertisements
Similar presentations
2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan February 2010 presented by: Minnesota Department of Transportation and Cambridge.
Advertisements

Emerging California Passenger Rail Corridors A Comparative Look at the Future For Enhanced Passenger Rail in Coachella Valley/Banning Pass and the Delmarva.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Transportation Border Working Group
Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
First Statewide Comprehensive Rail Plan for MN Commissioned by 2008 Legislature Compliant with 2008 PRIIA Federal Rules 6 Months to prepare, 10 Months.
Department of Industrial Engineering1 Economic Evaluation of the Impact of Waterways on the Port of Cincinnati-Tristate Heather Nachtmann, Ph.D. River.
Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet September 24, 2013SCORT Kentucky Railroad Planning Experience.
Section 209 Activity Report September 12, 2011 Federal Railroad Administration.
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Oregon Passenger Rail EIS Project Leadership Council Hal Gard, Rail Administrator, ODOT John Sibold, Cascade Rail Corridor Director, WSDOT Salem, OR June.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
C O N F I D E N T I A L | Transportation Economics & Management Systems, Inc. Briefing: Northern Indiana / Ohio Passenger Rail Corridor Chicago – Gary.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
HSRD Systems Diagram Ten FRA Criteria 1.Ridership Forecasts: Calculated using a logit model that incorporates the reliability, cost, and travel time of.
Oceanside-Escondido Rail Line Final Project Presentation John R. VelascoMay 12 th, 2003.
High Speed Passenger Rail for Indiana August 21, 2012.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
Miao(Mia) Gao, Travel Demand Modeler, HDR Engineering Santanu Roy, Transportation Planning Manager, HDR Engineering Ridership Forecasting for Central Corridor.

Cross Border Rail Passenger Service Transportation Border Working Group Buffalo, New York – April 8, 2014.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Krum Amtrak Stop Status September 21, 2010 Mayor Terri Wilson Krum, TX.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Trains are better for our environment than other modes of travel.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
English 212: Technical Writing Sarah A. Bujno. Overview Introduction Criteria Methods Research Results Conclusions Recommendations.
December 12-13, 2007 Item 4.4 Tab 31 California State Rail Plan to
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
September 19 & 20, 2007 Items 4.11a,b, & c Tabs 15, 16, & 17 Proposition 1B Intercity Rail Bond Program.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Amtrak: America’s Railroad Todd Stennis, Director Government Affairs, South.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
Moving Passengers and Products: The Ohio Hub Rail Study Ohio Rail Development Commission Lima – December 13, 2004 Provided Courtesy of the Good Governance.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Amtrak Gov’t Affairs October 19, 2007 Amtrak Key Facts Summary November 12, 2007.
Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express Minneapolis-Duluth/Superior Passenger.
Summary and Wrap-up Discussion 8 July 2015
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Framework for Rail Planning and Project Development.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
Northern Lights Express Minneapolis/Duluth-Superior Passenger Rail Alliance February 24, Northern Lights Express Minneapolis/Duluth-Superior Passenger.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Oregon State Rail Plan Update
Regional Roads Committee
2017 SCORT Conference Washington, DC
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
Ohio Rail Development Commission November 15, 2017 Meeting
I-85 Corridor Light Rail Transit Feasibility Study
Chicago to Council Bluffs-Omaha
NCRR is helping build a strong economy that benefits the people of North Carolina. We do this most visibly with steel and wood. Even more important, we.
Presentation transcript:

OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003

SYSTEM OVERVIEW

Ohio and Lake Erie Regional Rail Cleveland Hub An 860 mile rail system with 32 Stations. Serving 22 million people in 24 cities and towns.

Study Goals and Objectives Forecast system ridership and revenue Estimate operating and maintenance costs Evaluate inter-modal connections with airports

Study Goals and Objectives Analyze alternative routes Examine synergies with other corridors Incorporate into the State Transportation Plan Access Ohio Apply for FRA High Speed Rail Designation

Part of an International Rail Network

Railroad Objectives Provide opportunities for and encourage railroad input in the planning process. Be sensitive to the railroad’s needs for capacity and future growth. Expand railroad capacity while improving the fluidity of railroad operations.

Keep railroads whole Expand capacity (mainlines, sidings, yards, bridges) Improve fluidity and reliability Eliminate bottlenecks; decrease train travel time; and increase train speeds Examine three investment scenarios (design speed) 79 mph; 90 mph; 110 mph (Top Speed of 125 mph) Improve safety and grade crossing warning systems Capital costs and improvement concepts are based on field observations by HNTB and Amtrak Infrastructure and Engineering Objectives

Modern Equipment Technology Talgo Flexliner Acela Gas Turbine

KEY TECHNICAL FINDINGS

Findings Significant Regional Travel Market and Potential for Intercity Rail. Strong Ridership Estimates. System Benefits from Connectivity. Competitive Travel Times with the Automobile. Regional Economic Benefits.

Strong Potential Market for Passenger Rail

2025 Ridership and Revenue Forecast System Hub Total with Modern Technology (Option 1, Max. speed at 110-mph) Ridership Passenger Revenue M $ M Cleveland-Pittsburgh Ridership Revenue M $ M Cleveland-Detroit RidershipRevenue M$ M Cleveland-Columbus- Cincinnati RidershipRevenue M$ M Cleveland-Buffalo- Toronto RidershipRevenue M$ M

Travel Time Summary Corridors Existing Rail/Bus Service Modern Scenario(Top Speed at 79-mph) High Speed Scenario (Top Speed at 110- mph) LocalExpressLocalExpress Cleveland to Detroit (Detroit Airport) No Service 3:052:462:472:23 Cleveland to Detroit (Wyandotte) 4:002:592:412:402:20 Cleveland- Buffalo/Toronto 8:305:355:215:204:53 Cleveland-Pittsburgh (Youngstown) 4302:362:152:242:02 Cleveland-Pittsburgh (Alliance) 3:282:322:092:221:58 Cleveland- Columbus/Cincinnati 5:154:274:073:493:28 Note:Existing service consists of all public transportation (Amtrak, bus thruway service, and combination of both) available in the study area.

Corridors Distance (miles) One-Way Fare/CostRound-trip Fare Cleveland Hub System Auto Acela High Speed Rail Rate Air (3-week Advance Fare) Air (Business ) BusinessNon- Business Cleveland to Detroit 175$39$57$18$105$157$544 Cleveland to Pittsburgh 140$38$46$14 $84$232$621 Cleveland to Buffalo 182$58 $18$109$174$808 Cleveland to Columbus 135$43$44$14 $81$163$706 Columbus to Cincinnati 123$43$84$26$155$186$755 Notes: 1. The one-way and round-trip fares are rounded to the nearest dollar. 2. Auto Business cost was calculated based on the Internal Revenue Service Standard Mileage Rate at $0.325 per mile. 3. Auto Non-Business cost was calculated based on the Internal Revenue Service Standard Mileage Rate at $0.10 per mile. 4. Acela Rate was calculated based on fare per mile between Washington D.C. and New York City ($0.60 per mile). 5. Air round trip fares was web-listed fares as of October 25, Estimated Fares Between Stations

Possible Implementation EIGHT TO TEN YEAR IMPLEMENTATION (Assumes Federal Funds) START-UP SERVICE: 79 MPH, 2-3 Trains per day (2 to 5 Years) 1. Cleveland – Columbus – Dayton - Cincinnati 2. Cleveland – Detroit 3. Cleveland – Pittsburgh 4. Cleveland – Buffalo – Toronto FULL SERVICE: 110 MPH, 6-8 Trains per day (5 to 10 Years) 1. Cleveland – Columbus – Dayton - Cincinnati 2. Cleveland – Detroit 3. Cleveland – Pittsburgh 4. Cleveland – Buffalo – Toronto

Preliminary Economic Impact Jobs Created 16,000 temporary construction jobs created 300 full-time operating jobs created 2,000 indirect job benefits Property Value Increases Approximately $1 billion increase in Ohio property values. Income Annual income increased by $256 million Annual tax revenues increased by $28 million

Next Steps Complete Federal Railroad Administration Study of Track Maintenance Costs and incorporate results into the Cleveland Hub financial and economic analysis.

Next Steps Distribute draft report to railroads and steering committee for comment. Build support at the local, state, and national levels (Ohio program) Hold public outreach meetings. Hold meetings with the business community.

Next Steps Conduct detailed Economic Impact Study. Initiate ODOT Environmental and Project Development Process. National Environmental Policy Act (NEPA) Process First 4 Steps of ODOT’s Major Project Development Process.

Passenger Rail Investment Reform Act of 2003 Proposed by USDOT. Removes Amtrak from the discussion of how to improve passenger rail service in the U.S. Places responsibility for passenger rail development in the hands of the states and federal government. Reduces Amtrak’s role to that of a service provider.

Passenger Rail Investment Reform Act of 2003 Envisions a national system of interconnected corridors, rather than a network of long distance trains. Is consistent with Ohio’s corridor planning. Recognizes the real cost of access to railroad tracks and railroad property.

Other Proposed Federal Bills S. 1505, The American Rail Equity Act of 2003, (AREA) HR 2571, Rail Infrastructure Development and Expansion Act for the 21 st Century, (RIDE-21) ARRIVE-21, To be introduced soon. Rail infrastructure investment bills: H. 1617, HR 2192, HR 876,