U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

All-Hazard Emergency Planning for Colleges and Universities
40 CFR 300. Overview of the NCP Roles and Responsibilities National Response Priorities General Pattern of Response Relationship with the Area Contingency.
Spill Prevention Control & Countermeasures Compliance and Planning.
Occupational Safety and Health Course for Healthcare Professionals.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Spill Response Plans – Why Are They Developed? Alan K. Mayberry.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
MODULE 1 Introduction to OSHA and DOT Training.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Contractor Management and ISO 14001:2004
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Workplace Safety and Health Program
Pipeline Safety Program Regulatory (DOT) Pipeline Risk Management Pipeline Safety Trust New Orleans, Louisiana November 16, 2007 John A. Jacobi, P.E. PHMSA.
© 2010 Chevron Spill Contingency Plan & Drill Program Pete Lundgreen Chevron Pasco Facility Northwest Area Committee Presentation March 10, 2011.
CLICK TO EDIT MASTER TITLE STYLE TRIPR FLAMMABLE LIQUID UNIT TRAINS 6.0 LOGISTICS AND RESOURCE MANAGEMENT.
Regulation of Pipelines
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Center for Offshore Safety
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Ship Recycling Facility Management System IMO Guideline A.962
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Process Safety Management
Basics of OHSAS Occupational Health & Safety Management System
Company duties under the ISM Code
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Liquid Pipeline Advisory Committee Meeting Arlington,
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Spill Response Plans 1 Aaron W. Martinez Pipeline Safety Specialist NuStar Energy L.P.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
State Fire Marshal’s Office Washington State Fire Marshal’s Office Deputy State Fire Marshal Scott Lancaster.
Summary of Senate Bill 861 (2014) and the Emergency Regulations Needed to Implement This Bill August 2014.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
04-25 Right to Know Right to Know  General  The purpose of this guideline is to insure that the Brunswick Fire Company No. 1 provides a safe.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Business Continuity Planning 101
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Presentation to Pipeline Safety Trust Conference November 18 & 19, 2015.
Pipeline Safety Management Systems
Operator Qualification
Marine safety Unit Savannah
Public Meeting MTR Facility Response Plans for Hazardous Substances; Proposed Rule New Orleans, LA May 10-11, 2000 Revised 3/7/00.
Presented to the Project Certification Committee on November 16, 2011.
Excavation.
County Wide Safety Program
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS MAY 30, 2012 Terry Larson PHMSA, Western Region

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Mission: To ensure the safe, reliable, and environmentally sound operation of the Nation’s pipeline transportation system.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Regions/Offices Western Region Lakewood Southern Region Atlanta Eastern Region HQ Washington, D.C. Trenton Southwest Region Houston T&Q Oklahoma City Central Region Kansas City

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Safety Regulations The rules governing pipeline safety are included in Title 49 of the Code of Federal Regulations (CFR), Parts Individual states may have additional or more stringent pipeline safety regulations.

49 CFR Parts Part procedures used by OPS to carry out regulatory duties. Part requirements on operators of gas pipelines Part requirements for gas pipelines. These regulations contain sections applicable to gas gathering, transmission, and distribution lines. Part safety standards for liquefied natural gas (LNG) facilities. Part requirements for oil spill response plans. Part safety standards and reporting requirements for oil and carbon dioxide pipelines. Parts are currently reserved for future use. Part 198 – establishes grants for State pipeline safety programs. Part 199 – drug and alcohol programs

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 195- Design and Construction Design Criteria Trenching Welding Non destructive testing Coating Lowering and backfilling Depth of Cover Hydro-testing Valve location

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 195 Operation and Maintenance Procedures Manual for Operations, Maintenance & Emergencies –Establish and maintain liaison with responder orgs –Abnormal Operations –Emergencies Response Equipment Actions Minimize public exposure Training

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 195 Integrity Management Programs (IMP) Assessment of pipeline integrity in high consequence areas (HCA) Integration of risk and knowledge Allocate resources to focus on the highest risks Operators developing their own performance measures and performance monitoring programs Written integrity programs are a living document to drive continuous improvement

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART Operator Qualification Pipeline Employees and Contractors must be Qualified to perform Covered Tasks Personnel must be Trained and Evaluated to ensure: Safe and Proper Performance of Covered Task Recognize and React to Abnormal Operating Conditions Consensus Standard - ASME Standard B31Q

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 195 Public Awareness Programs In June 2005, regulations revised to require all operators to comply with API Recommended Practice 1162 Communications Plans tailored to Stakeholder Audience –Residents along ROW, General Public, Local Public Officials, Emergency Responders Operators must evaluate effectiveness of public awareness programs

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 195 Additional Requirements Damage Prevention CPM Leak Detection Control Room Management Corrosion Control

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREPAREDNESS

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 194 – Response Plans Operators required to submit Response Plans –Some exceptions –State Programs Substantial Harm or Significant and Substantial Harm to environment by discharge of oil to navigable waters or shorelines Worst Case Discharge Certify that response plan is consistent with NCP and ACP

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A Guidelines for Preparation of Response Plans Section 1. Information Summary for Core Plan –Name and address of the operator –Qualified Individual ID –Response Zone ID –Certification of Significant and Substantial Harm –Type of oil and volume of Worst Case Discharge –Certification the operator has personnel, equipment, and means (internal or by contract) to respond to Worst Case Discharge

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 2. Notification Procedures –Notifications to federal, state and local officials –Notifications to Qualified Individuals –Internal Notification Call Down Tree

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 3. Spill Detection and On-Scene Spill Mitigation Procedures –Methods of Initial Discharge Detection: Procedures by priority Equipment List External response equipment information Personnel contact information

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 4. Response Activities –Operating personnel response responsibilities and actions i.e. first responder –Qualified Individual Responsibilities –Procedures for coordinating with OSC –Oil Spill Contractor information Available under contract or other approved means Equipment and supplies Personnel and response time

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 5. List of Contacts –24 Hour Contact information for: Operator response personnel Qualified Individuals Insurance, lawyers, etc. Persons or organizations for activation or response

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 6. Training Procedures –Description of Training procedures and Programs of the operator i.e. knowledge of: Assignment in Incident Command Structure Product characteristics Response actions including priority Other emergencies – fire, security, etc. –Evaluate performance annually not to exceed 15 months for supervisors and personnel

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 7. Drill Procedures –Drill Program and Procedures (FOLLOW PREP) Announced and unannounced drills: –Quarterly Notification and Action Drills for both manned and unmanned facilities – QI, Key OPS Personnel –Annual table top drills –Annual equipment deployment drills –Every 3 years conduct a drill that exercises entire response plan.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 8. Response Plan Review and Update Procedures –If substantial new condition or information submit change within 30 days i.e. change in: Worst Case Scenario OSRO/QI Response Procedures Significant change in NCP or ACP –Review, update and resubmit Response Plan every 5 years –Evaluate response plans effectiveness after a release

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PART 194 – Appendix A (cont.) Section 9. Response Zone Appendices –Provide information on: Zone worst case discharge Operator personnel information Response equipment and supplies Response contractors Potentially affected environmentally sensitive areas Piping diagrams and alignment sheets Product transported

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Questions