Outside Component Manufacturers and Status Report to the Gatling Gun Review Committee By John Skaritka June, 28, 2012.

Slides:



Advertisements
Similar presentations
Jeffery Peyton Office of Contracts Ohio Department of Transportation.
Advertisements

MASBO February Information to purchase Services Information to purchase Construction.
WAREHOUSING MANAGEMENT
1 “The Gatling Gun” A High Current Polarized Electron Gun System John Skaritka Collider-Accelerator Department Brookhaven National Laboratory.
Identifying and Selecting Projects
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Total Quality in Organizations
Total Quality in Organizations
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Business-to-Business and E- Government Strategies.
Management 11e John Schermerhorn
Chapter 8 Assuring the quality of external participants’ contributions
Total Quality in Organizations
Specialists for Specialists
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
VENDORS, CONSULTANTS AND USERS
Safety and Loss Control
1December 14, 2006Identifying Preferred Suppliers A Training Tool on Supplier Selection By Kira Connell Bus M 361.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Effective Methods for Software and Systems Integration
Total Productive Maintenance (TPM)
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
Producing Quality Goods and Services
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2006 Thomson Business & Professional Publishing. All rights reserved.
Head of School Search Process Overview and Stages  Agnes C. Underwood Consultant.
Providing Outsource Services Introduction Outsourcing is a great way for a company to fill a temporary need or to hire expertise they may not have within.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
The Year of the Customer FE&P Reorganization: Improving for Our Customers.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
Communications Skills (ELE 205)
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Software Engineering Saeed Akhtar The University of Lahore Lecture 6 Originally shared for: mashhoood.webs.com.
CHAPTER 2 THE ORGANIZATIONAL BUYING PROCESS. Important Topics of the Chapter Changing Role of Business Buyer. The Business Buying Process. Business Buying.
1 1st PMI AGC Energy Forum: DMS Debates NOCs in the GCC no longer need a PMC on a Project 2 nd June 2010 Essa Al-Ansari.
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
Business Functions, Processes, and Data Requirements
Managing for Quality and Competitiveness
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
1 Total Productive Maintenance and Maintenance Management
Communications Skills (ELE 205) Dr. Ahmad Dagamseh Dr. Ahmad Dagamseh.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Network of Suppliers warehouses, operations, warehouses, distribution centers, retail outlets, and customers. Supply Chain.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
Outsourcing of Census Operations United Nations Statistics Division UNSD-ESCWA Regional Workshop on Census Data Processing in the ESCWA region: Contemporary.
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
Building Competitive Advantage Through Functional-Level Strategies
What you need to know about handling major school works 5 th July 2013.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Total Quality in Organizations 1. Growth of Modern Quality Management 2 Manufacturing quality Improved product designs Service quality Performance excellence.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Mike Pryor, 23 rd March 2016 Intelligent Governance : Smart Gateways and Sharp Communications.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Total Productive Maintenance and Maintenance Management
(Additional materials)
Industrialization of previous projects
Software System Integration
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Experimental equipment Edgar L. Black February 17, 2019
Production and Operations Management
Building Competitive Advantage Through Functional-Level Strategies
Presentation transcript:

Outside Component Manufacturers and Status Report to the Gatling Gun Review Committee By John Skaritka June, 28, 2012

Talk Outline Rational for using outside contractors for development Outside vs. onsite development pros and cons. Developmental efforts and contractor facilities Status of MDC projects Status of Atlas Technology projects Status of Transfer Engineering projects Status of Stangenes Industries System integration and test plans of the Grand central and Gun assemblies Summary 2 Gatling gun program review June 28 th -29 th, 2012

Rational for using outside Contractors for Gatling Gun DOE has set limits on the number of non-scientific personal to be employed by the department. As the result the Gatling Gun cannot receive the same degree of support as other higher priority projects. So to make progress on this project, we must go to outside contractors! 3 Gatling gun program review June 28th-29th, 2012

XHV Chamber manufacturing experience There were concerns that large XHV chambers could not be built by US industry. After implementing the lessons learned from the development program XHV experience with the manufacturer of large chambers in US industry now exists. The successful testing of the Grand Central Chamber proves this. Gatling gun program review June 28th-29th,

Outside vs. onsite development pros. and cons. Pros. – Eliminates the non scientific head count issue. – Costs are controlled by the use of firm fixed priced contracts. – Overruns are the contractors problem and can’t be billed without formal contract changes. – Using the contactors existing infrastructure eliminates the need to expend limited resources to establish and maintain our own, and no space charges. – By not methodizing, an contractor can apply his expertise into the job and make the product better than originally expected. – Contractors can perform safety testing and can certify a product as safe for operation at BNL. Cons. – Contractors may have priorities that are at odds with scientific inquiry. – The contractor may down play a serious issue or exaggerate a minor one to satisfy his agenda. – A contractor may indicate he is following instructions but actually does what he believes is best for him. thinking we will never find out or his solution will be just as good. – Contractors can have a misunderstandings about a job or bid on the job with out understanding it’s details, not carefully reading the Spec, or not taking the SOW seriously, then delays occur in correcting these misunderstandings. 5 Gatling gun program review June 28th-29th, 2012

How to take advantage of the Pros and avoid the Cons. It is essential to visit the companies regularly and see that the contractor fully understands the tasks he is asked to perform. If possible establish multiple vendors to perform similar tasks to maintain a sense of competition and to avoid being cornered. Establish and regularly maintain lines of communication with decision makers in the company. It is important to resolve problems quickly, to close the loop and never leave open issues. Never be complacent, it is better to ask the questions and probe the knowledge of the vendor to assure they have a full understanding of the problem and the solution. It is best to establish longer term professional relationship with vendors and to get to know their inner workings 6 Gatling gun program review June 28th-29th, 2012

Developmental efforts and contractor facilities It is sometimes necessary to improve the Contractors facilities to help them improve their in house capabilities. BNL supplied equipment can help expedite work and is cost effective avoiding the markup charged if the vendor has to purchased the equipment themselves,. We have supplied RGA’s, ion pumps, NEG pumps, and the 3-BG super gauge. Making the Job easier to do, makes the job go faster with fewer mistakes and the contractor retains the experience 7 Gatling gun program review June 28th-29th, 2012

Status of MDC projects MDC was the first Contractor to officially achieve 10^-12 scale vacuum. As far as we know this is the largest vessel to reach this vacuum level built by industry MDC’s ISI division is proceeding with completing orders for the Gun laser windows and the Combiner’s ceramic break that is scheduled to be completed by early September. Grand Central Chamber under Test using BNL supplied, RGA, 3-BG gauge, 2000l/s Ion pump, 2000l/s Neg pump and 350l/s turbo pump 8 Gatling gun program review June 28th-29th, 2012

Status of Atlas Technology projects Components for the first Cathode Tree Component for the Gatling Gun transition assay Cathode service Flange Assy Completed G-Gun End transition Assy- manufacturing underway. Cathode Shroud Assy- manufacturing underway Cathode Cooling Ring- manufacturing underway Anode Assembly- manufacturing underway 9 Gatling gun program review June 28th-29th, 2012

Transfer Engineering projects G-Gun Vessels- vessel manufacturing underway First Cathode Tree Delivered G-Gun manipulators- manufacturing underway. Grand Central manipulators Detailed Design complete, 10 Gatling gun program review June 28th-29th, 2012

Status of projects at Stangenes industries Testing of High Voltage of Vacuum Feed through 250KV achieved, Testing on hold pending high voltage supply repair Improvements to the HV feed through Manufacturing is underway Focusing Solenoids, Anode Sub. Assy- manufacturing underway First Bend dipole Detailed design underway Components of the Anode Solenoid array 11 Gatling gun program review June 28th-29th, 2012 Testing and repair of the 250 KV feed through

System integration and test plans of the Gatling Gun assembly Early next fiscal year the majority of components for the Gun assembly will be ready for assembly. – Main, gun chamber – Transition chamber – Anode assembly – Combiner brake – Exchange chamber – High voltage feed through System will be assembled and ultimate vacuum will be established. The Gun assembly will undergo High Voltage system tests. After these tests are complete the assembly will be shipped to BNL. 12 Gatling gun program review June 28th-29th, 2012

System integration and test plans of the Grand central assemblies Early next fiscal year all the major components of the Grand Central Chamber assembly will be ready for integration. – Main vessel – Magnetic manipulators – New set of cathode preparation Trees – Ion pumps and controls The system will be integrated, base vacuum established, and then shipped to BNL 13 Gatling gun program review June 28th-29th, 2012

Summary The rational for using outside contractors for development was discussed. Outside vs. in-house development pros and cons and how to avoid contractor problems were presented. Status of major Gun and Prep. Chamber components at MDC, Atlas Technologies, Transfer Engineering, and Stangenes Industries were listed System integration plans of the Grand central and Gun chamber assemblies were presented. 14 Gatling gun program review June 28th-29th, 2012