Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.

Slides:



Advertisements
Similar presentations
1 April 27, 2004 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
Advertisements

GOES-R Direct Readout Implications Richard G. Reynolds GOES-R Ground Segment Project 4 th GOES User Conference “Session 5: GOES-R User Readiness” 8:30-10:15.
DADDS DCS LRIT Prototype LRIT Latency Results Presented by Microcom Design, Inc. May 2014.
NWS Use of Direct Broadcast Geostationary Weather Satellite Data
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
NOAA COMMAND AND DATA ACQUISITION STATION
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Software Configuration Management
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
DCS Alternate Data Distribution System (DADDS) Database Development Status Presentation to the STIWG/TWG July 9, 2008.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
DCP COMMAND …bringing two-way communications to your DCPs.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
Near Real-Time Data Access - PDA
Dependencies on NETS Presented by UCAR Technical Security.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
OCONUS Update June 2013 Jerry Janssen David Hartzell 2.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
Tuesday, October 06, 2015 Santos Rodriguez NWS EMWIN HRIT/EMWIN.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
1 PETER WOOLNER MITRETEK SYSTEMS KAY METCALF NOAA GOES DCS PROGRAM MANAGER NOAA DECISION BRIEFING STIWG AND TWG NOVEMBER 7-8, 2006 ASHEVILLE, NC.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
Upcoming Frequency Topics: Future GOES-R Concerns
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Meteorological Spectrum Issues- Outcome of the 2003 World Radiocommunication Conference Presented By: David Franc National Weather Service December 2,
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
Welcome to the June 24 th NOAA Weather Wire Service (NWWS) Partners Brief The Webinar will begin momentarily….
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
1 DCPRS CERTIFICATION STANDARD STATUS DCS MANUFACTURERS MEETING MAY 18, 2006 Peter Woolner Mitretek Systems
NOAA’s NWS Telecommunication Gateway RTH Washington Fred Branski Office of the Chief Information Officer NOAA’s National Weather Service 20 th NamEurDEx.
DEC.10,20061 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
Improved Geo-location Accuracy For POES Imagery 11 December 2002 NOAA/NESDIS Office of Satellite Operations Office of Systems Development Peter Phillips.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
NOAA Satellite and Information Service: Dissemination Systems Update George Jungbluth Senior International Relations Specialist NOAA Satellite and Information.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
March 15, NWSTG Critical Infrastructure Update Fred Branski Telecommunication Operations Center February 2, 2006 NOAA’s National Weather Service.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.
Top Recommendations GOES POES Services Frequencies.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report Satellite Direct Readout Conference for the Americas Miami, Florida.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
DADDS New Features Tuesday, May 3, 2016Sioux Falls, SD Letecia Reeves, GOES DCS Customer Service Specialist NOAA/NESDIS/OSPO/SPSD.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
EMOSS-V Pre-Proposal Brief 19 May 2015, Room 2007.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
Federal Acquisition Service U.S. General Services Administration Lessons Learned from a Shared Service Perspective Steve Duncan GSA MSO January 15, 2008.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
IT 280 RANK SUCCESS IS A TRADITION/IT280RANK.COM.
DCS Alternate Data Distribution System (DADDS)
GOES DCS Customer Interaction/Access Training
Presentation transcript:

Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on –No decision on South American support after Dec 13 GOES-13 is prime East 75 deg West GOES-15 is prime West 135 deg West GOES-14 is in 105 deg West GOES-11 was de-commissioned 15 Dec 2011 GOES-3 was de-orbited Mar 2012

DCS DADDS on-line since Jan IT Security Authorization and Accreditation completed on Mar –We have a 1 year Authority To Operate –This includes the WCDAS and the NSOF Four of the six test transmitters have been upgraded to the new crystal oscillators New RSS news feed link on the DCS web sites to provide DCS status updates.

DCS Continued NWSTG TCP/IP data currently being transferred from both WCDAS and NSOF. No more X.25. –This gives NWS capability to chose source Lowered AGC lock threshold on all demodulator cards from 30dBm to 25dBm. –Analysis shows the lowered threshold will yield approx more messages per day.

Wallops LRGS Configuration No real changes to the LRGS configuration since the last meeting NOAA staff builds accounts and shares these with USGS/EDDN Customers can get LRGS client S/W and manual at: – – Sites and IP’s for CDADATA, CDABACKUP and DROT: – ( ) – ( ) – ( ) –Use drot to troubleshoot (this is the DOMSAT downlink as seen at Wallops). –cdadata & cdabackup are sharing data with EDDN

LRIT Status Internal latency tests were conducted jointly with NOS in Feb (this will be discussed further during the meeting). Wallops is working with SSD (Satellite Services Division) to use the backup at Wallops during periods of outages. The SSD LRIT failover at Wallops remains manual –Tested week of April 16 –SSD staff in Suitland can activate remotely

LRIT LRIT benefits –1 meter antenna receives full LRIT stream –There are no re-occurring costs associated with LRIT reception. –GOES coverage = LRIT coverage

GOES Footprint

SES-1 Ku-Band Footprint

DOMSAT Status Recent DOMSAT failover attempts have been rough Equipment upgrades expected with the new contract

Current DOMSAT Configuration Frequency change on SES 1 – 16 Dec 2011 GOES DCS DOMSAT Service Current Satellite, SES-1 Located at 101deg West Ku Transponder 14 New Frequency MHz (Old Frequency MHz) Horizontal Polarization

WCDAS Equipment Moves Major components of the DCS system at Wallops will be relocated during the week of May 15 (Travis is the lead) to make room for GOES-R equipment and facility upgrades. WCDAS is planning a failover test to NSOF for DOMSAT and NWS services during week of May 7 th. Anticipating two days of WCDAS outages during the move. DOMSAT and NWSTG feeds will be from NSOF No Wallops LRGS availability during this period Please check the DCS bulletins, RSS feed, or call the 24/7 number to get system status concerning the move. All equipment moves are contingent on critical weather day declarations (these can be declared suddenly)

WCDAS Equipment Moves The DCS pilot antennas located on the Wallops Operations Building will be moved to new location mid/late Summer During the move process, we will use the Wallops Backup (Goddard) pilot. No planned interruption to users. Ultimately three new 4-meter directional antennas will be installed to be the permanent pilot antennas. This upgrade will be in the Fall 2012 depending on: –OSD/Procurement priorities –Construction schedule

Wallops Backup A second pilot remains active (channel 0) at the WBU. The frequency is 401.7MHz. LRIT and EMWIN equipment is at WBU & FCDAS still waiting for connectivity to NSOF – multicast issue.

Test Channels GOES East –300bps 195E for CS1 & CS2 ( MHz) –1200bps A99 for CS1, 497 for CS2 ( MHz) –Incompatible with CS2-needs to move –100/300 bps Auto Detect 151E CS1 Only ( MHz) GOES West –300bps 196W for CS1 & CS2 ( MHz) –1200bps A100 for CS1, 499 for CS2 ( MHz) –100/300 bps Auto Detect 151E CS1 Only ( MHz)

Misc. From Last Meeting (Phil) (Points for discussion) NESDIS review of binary data usage: Assigned to Philip, Warren, Peter. Philip reviewed the vendor proposals and forwarded comments and recommendations to Warren, Nov or Dec. LRGS Source code: Assigned to Warren (from NOS) & Philip: Warren & Philip agree that the LRGS source code (the old "FF") would be most useful if it could be used as a "value added" stamp for all DRGS, LRGS, LRIT, etc. paths.

Misc. From Last Meeting (Phil) Philip to Provide drawing of the DADDS & interconnections: Work in progress.

GOES-R WCDAS Construction Update

NOAA COMMAND AND DATA ACQUISITION STATION (Prior to GOES-R construction)

Current Aerial WCDAS View

Informational NESDIS Phone Numbers DCS Help Desk at or 7451 For 24/7 Technical Help Travis Thornton (Team Lead) Kay Metcalf (Program Manager) Letecia Reeves (Customer Service) Phil Whaley (RF/Engineering) Al McMath (Operations Manager)