TRICERATOPS The Case for a New Deepwater Concept

Slides:



Advertisements
Similar presentations
SHIP LOADS AND STRESSES
Advertisements

Cofferdam.
OO Star Wind Floater A robust and flexible concept for floating wind
Edit this text for your title
Edit this text for your title
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
Introduction to Structural Design
Characteristics of Three Bridge Types
Chp12- Footings.
Introduction Recently the industry has had to moved from having traditional derrick mounted drill string compensators to utilizing active drawworks. This.
An Experimental Investigation on Loading, Performance, and Wake Interactions between Floating VAWTs ____________________________________________ Morteza.
ENG-1010 Lecture 16 Bridge Design.
17th FPSO Research Forum April 5th 2006
The Evolution of a New Mooring System for Ultra-Deep Waters By Charles N. White Strategic Offshore Solutions – Houston Fall.
Bridge Engineering: Lessons from Rome to Tacoma
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
SHIP STRUCTURES Unique Structures (6.1) What are they optimized for?
Bearing Capacity Theory
1. By Dr. Attaullah Shah Swedish College of Engineering and Technology Wah Cantt. Reinforced Concrete Design-II Lec-3 Retaining walls.
Floating Production Systems
TOPIC 2: TYPES OF FOUNDATION
Foundation Engineering CE 483
2001 Winter Presentation. Site Location Site View.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
FOFFF.
IEC TC88 : Wind turbines Republic of Korea.
OFFSHORE PLATFORM DESIGN
Erin Bachynski, PhD candidate at CeSOS May 15, 2013
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
ID-2125 Marianela Najul KARLYS PULIDO PARICIA CAMACHO FRAMED STRUCTURE.
Details of Construction Lecture-2 “Shallow Foundation”
Bridges & Forces.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Design and Construction of a Spaghetti Bridge Michael Karweit Department of Chemical Engineering Johns Hopkins University.
BRIDGES Greenwood Lake Middle School TECHNOLOGY. History of Bridge DevelopmentHistory of Bridge Development How Bridges Work Basic Concepts Types of Bridges.
TOPICS COVERED Building Configuration Response of Concrete Buildings
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Lesson 6 Drilling Structures
Petroleum Engineering 406 Lesson 9b Station Keeping.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Overview of SURF Systems & Analysis
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Mass Simulator Concepts Robert Besuner 12 October 2005.
Lecture 2: Ship structural components
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Foundation Loads Dead Load Live Load Wind Load
A View of NCSX Structural System and Load Path for the Base Support Structure.
BUILDING CONSTRUCTION
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Building Construction
BUILDING CONSTRUCTION ( ). 1. BHOL SUFIYAN [ ] 2. CHAVDA KRUNAL [ ] YEAR: 2 ND SEM: 3 RD CIVIL ENGINEERING DEPARTMENT PRESENTED.
IMPROVED SEABED ANCHORING TECHNOLOGY Innovation Opportunity Identified at PROTTEC Retreat 26/28 October 2010 Jonathan Williams, Marine South East.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
1 Spars for Deepwater Developments Don Vardeman VP, Worldwide Projects Anadarko Petroleum Corp September 9, 2009.
Floating Windmill ( A solution to present power shortages in Tamilnadu) Present By R Sugumar V Suriya Raja GS.
Sustainable Engineering
Sardar Patel Institute Of Technology
Structural design and dynamic analysis of a tension leg platform wind turbine, considering elasticity in the hull NTNU supervisor: Erin Bachynski TUD.
OFFSHORE CONSTRUCTION
INSTRUCTOR © 2017, John R. Fanchi
Bridge Engineering: Lessons from Rome to Tacoma
Harbors and Ports Engineering Geology – CE31FB2.
Residential Foundations
Residential Foundations
ROOFS.
A Numerical Modeling Approach of Composite Riser Hoses Amaechi Chiemela Victor 3rd Year PhD Student – Engineering Department Supervisor: Prof. Jianqiao.
BUILDING CONSTRUCTION Foundation
Petro Data Mgt III- Facilities
Presentation transcript:

TRICERATOPS The Case for a New Deepwater Concept Is there room for a new concept? Principles and limitations of (TLP’s) What’s at the core of spar concepts? (risers) When is a spar not a spar? Reducing deepwater TLP costs A Buoyant Leg Structure is an optimized tethered buoyant tower Clustering Towers to support big payloads Triceratops (assembly) Triceratops in shallower waters

Is there room for a new concept? Currently there are only 3 proven concepts for deepwater dry-tree platforms Towers (steel - Bullwinkle, Lena; concrete - Troll, Draugen) TLPs (& mini-TLPs) Spars Only TLPs and Spars have been proven for very deepwaters and large payloads Large payload deepwater TLPs have very expensive hulls & mooring systems Spars have very expensive hulls and riser systems TLPs have great motion characteristics, but costs & dynamic response increase dramatically in ultra-deep waters

Enter BLS & Triceratops Buoyant Leg Structures are tethered spars (i.e., vertically restrained) The BLS combines the qualities of spars and TLPs where its deep draft hull limits vertical excitation The BLS can give better motions and more convenient riser systems/well access than spars with much smaller, simpler hulls than spars or TLPs A Triceratops combines 3(or more) tethered spars to support very large production facility deck structures Either one may support dry tree or subsea well risers AND….BLS & Triceratops will be cheaper than TLPs & spars for competing payloads

10ft Triceratops ? 10,000ft Water Depth Ranges for PLATFORM Concepts Dry Trees Caissons Wet Trees Posted Barge Jackets FPSO Tower Semi FPS TLP Mini-TLP BLS Triceratops BLS Spar Spar ? 10,000ft

Heavier & ‘Stretchier’ Tendons & Buoyant Legs TLP Tendons’ useful strength may be preserved by stepping wall thickness & partial buoyancy, but large steel cross-sections are still required to avoid vertical mode RESONANCE. Tendons become Heavier & ‘Stretchier’ with increasing WD => RESONANCE

Reducing Ultra-deep TLP Costs $$$ If a ‘buoyant tendon’ is extended through the surface, we might call it a ‘tethered buoyant tower’ Tendons are costly in deep waters, but rigid TLP ‘nodes’ are costly at ALL water depths

Self-standing (buoyancy supported) Risers Multi-Function Barge Spar Tree The ‘self-standing risers’ used in spar are simple ‘Tethered Buoyant Platforms’ With Trees as their payloads

When is a Spar NOT a Spar? Spar When it’s Tethered and becomes a Tree Trees When it’s Tethered and becomes a Buoyant Leg Structure Well & Riser

Triceratops - a tethered buoyant platform structure Three (or more) tethered buoyant towers acting together can support “a lot”! Triceratops - a tethered buoyant platform structure Buoyant Columns Tension Legs (partially flooded) Hybrid Gravity/Suction Anchors

Triceratops – a tethered buoyant tower structure Workover/Completion Rig Float-over Truss Frame Deck w/ Modules Contact “Hinge” Nodes CVAR Tubing Tieback Riser Buoyant Columns Tensioned Restraining Legs (may be stepped in wall thickness, tapered in section, or partially flooded) Hybrid Gravity/Suction Anchors The columns are installed and stand independently until the deck ties them together

Triceratops – a tethered buoyant tower structure Workover/Completion Rig Contact “Hinge” Nodes CONCEPT FEATURES/CHALLENGES- Float-over Truss Frame Deck w/ Modules Typical top-tensioned or Compliant Vertical Access Dry Tree Tieback risers can be used Deck stays horizontal as platform offsets in wind, waves & currents (like a TLP) Contact nodes between deck structure and buoyant columns allow angular deflections (acting as a bi-directional “hinge” joint) Hinge points can face upward (to deck) or downward (to columns) Hinges require careful design but loads and angles are well within limits for existing flex-joint designs Columns are only about 450ft in draft (versus 700+ft for spars) and are relatively small diameter Heave restraining leg allows column draft to be limited and still maintain great motions Column vertical weight (mass) distribution optimized for stability and limited excitation to restraining legs Restraining legs experience very little vertical resonant excitation due to column design/draft Buoyant Columns Tension Legs (partially flooded) Hybrid Gravity/Suction Anchors

Triceratops – a Compliant Concept that is readily adapted to a wide range of water depths Ultra-deep Water Moderate Depths Deep

Why Triceratops? Payload & deck area virtually unlimited Workover/Completion Rig Why Triceratops? Float-over Truss Frame Deck w/ Modules Contact “Hinge” Nodes Payload & deck area virtually unlimited Tethering costs minimized Tethering loads minimized as with TBT/BLS Concern about vertical mode resonance limited Deck sees TLP-like motions Lower cost deck fab/install Small diameter columns cheaper to fabricate Can be fab’d in GoM without long tow Wells can be located beneath deck or well away from foundations Buoyant Columns Tension Legs (partially flooded) Hybrid Gravity/Suction Anchors

Basic Comparisons TLP Spar BLS/TBT T’tops WD range 500-5,000ft Payload capacity 1,000-60,000t 1,000-30,000t 1,000-20,000t 5,000-60,000t Motions Vertical modes restrained; heave-pitch/roll cross-coupled All vertical modes minimized by design; surge/sway limited by size Heave restrained, roll/pitch minimized by design principles Heave restrained, roll/pitch & surge constrained by configuration High Cost elements Nodes at column tops & bottoms, tendons, installation Massive hull; spread mooring, deck installation, Restraining-leg (cheaper than tendons); deck installation Restraining-legs (cheaper than tendons) Risk Installation; Well hazards affect foundations Deck install & pitch/riser fatigue in well-bay Pitch angle at tension-leg New Ideas (see next slide)

Risks v. Benefits Cost Risks Project Schedule Risks Replaces complex rigid nodes at deck & pontoons on TLPs with compliant compression bearing joints at deck Reduces tethering steel/cost to minimum required for station-keeping Avoids complex tendon porches Avoids massive spar hull Avoids complex riser systems & buoyancy on spar risers Allows simple deck installation Project Schedule Risks Small, simple hull & tether structures easily fab’d locally (e.g., in US) Towing column/tether as one unit with up-ending at field limits critical exposure periods for installation Hook-up & pre-commissioning inshore can be maximized Design/Safety Risks Simple structures compared to TLP Tethers see low dynamic loads Wells can be located remote from foundations/anchors Hulls float stably with restraining leg removed Provides large deck area for safe distribution of hazardous area Operational Risks Limited inspection challenges Easy maintenance of readily replaced components Reservoir Risks With tethers (ie., restraining leg) removed entire platform can be towed to new field as one unit or deck can be easily removed for upgrade inshore and re-installed at new field

Apparent Cost Advantages Spar T’tops Mission 6000ft WD, 100mbopd, 12 prod. risers Payload, Incl. Deck structures 14,740t 16,130t Column Dia. & Draft, Displacement 132ft x 700ft 40ft x 400ft 49,900t Engineering & Project Mgt $47MM $32MM Fabrication Topsides + Hull/mooring $66MM +$121+28MM. $85MM +$51MM Installation & HUC $27MM $11MM Total Cost, excl. Risers/well systems $289MM $179MM delta = -$110MM Work-over + Completion Rig is leased =>Savings >30%

Triceratops Introductory Study Ultra-deepwater Applications Location & WD Mission/Payload Characteristics Definition of System Components Performance Criteria & Safety Considerations Global Analysis Contact “Hinge/Node” loads and behavior Installation Planning and Estimates Costs Schedule

“A Triceratops horridus gallops”, a painting by Douglas Holgate TriceraTOPS’em All!! “A Triceratops horridus gallops”, a painting by Douglas Holgate

“Triceratops horridus charges through the forest” By, Frank DeNota