Footer Text PROFESSIONAL SERVICES CONTRACTING. Footer Text PROFESSIONAL SERVICES CONTRACTING.

Slides:



Advertisements
Similar presentations
1 Solicitations/Advertisements Solicitations/Advertisements
Advertisements

1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Documenting Competitive Negotiation Procurement Procedures WisDOT – Consultant Services Lisa Stern, P.E. QBS Documentation Requirements.
Selecting Contractors and Architects Hiring Architects and Engineers in Missouri Dwight Dickinson, AIA Missouri Association of Rural Education PART 1.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Advanced DBE Tutorial June 10, DBE Program FAQ Why does BRMA have a DBE program? Federal law requires that airports that receive federal funding,
Facilities Institute July , 2012 Houston, Texas Professional Services: How do you get them? Gregory A. (Greg) Pratt, VCO, VCCO.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
PRE-PROPOSAL CONFERENCE Bond Program Monitor Procurement (RFP 13-08) Moderator: Stephen J. Densmore, Special Counsel June 10,
Marcy Mealy Procurement Specialist CDBG Program
The Threshold Has Changed: Now What Should I do? Presented by Jan Giffin, CPPO, CPPB, VCO Procurement Management Account Executive, DGS/DPS.
QBS Colorado QBS Colorado QBS Colorado is an organization comprised of the Colorado chapters of AIA, ACEC, NSPE, and others; to be.
Selection Processes and Administrative Qualification
Contracting with WYDOT
THE EVALUATION PROCESS FOR RFP’S: THE DIFFERENCE BETWEEN THE ARCHITECTURAL RFP AND A GENERAL SERVICE RFP TREENA BRADLEY, ROOSEVELT ELEMENTARY SCHOOL DISTRICT.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Qualification Based Selection. Qualifications Based Selection – Basing selection of design professionals on their qualifications first and foremost through.
The Importance of the Qualifications Based Selection (QBS) Process
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
HOW TO DO BUSINESS WITH THE STATE OF SOUTH CAROLINA John R. Stevens, CPPB State Procurement Officer Procurement Services Division S.C. Budget & Control.
Refresh of the Task and Solutions Professional Services (TSPS) – Addition of Real Property Project Management Services Class August 2011.
Purchasing Overview. Fundamentals of Purchasing Procedures.
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
“EVERYBODY WINS”.  Exclusively prescribes the use of a qualifications based selection process for awarding contracts  Prohibits the competitive consideration.
United Nations Procurement Division
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Two Heads are Better Than One Patrick Callahan, Snyder & Associates Handouts and presentation are available online at
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Selecting Contractors and Architects Hiring Architects and Engineers in Missouri Dwight Dickinson, AIA Missouri Association of Rural Educators PART 1.
Doing Business is easy as 1,2,3 Doing Business is easy as 1,2,3 1.Register your Business with Wayne County 1.Register.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Consultant Selection Missouri Local Programs How to Evaluate Consultant Proposals, Complete the Rating Sheets & Make a Selection.
Purchasing Overview Related to Request for Proposals (RFP’s) and Request for Qualification (RFQ’s)
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
City of Chicago Department of Procurement Services Welcome to the City of Chicago Department of Procurement Services Bid & Bond Room Rahm Emanuel, Mayor.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
Professional, Personal, Consulting, and Social Services (PPCS) Contracts PRESENTED BY: CELENA D. TILBURY ASSISTANT DIRECTOR FOR CONTRACTS & STRATEGIC SOURCING.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
Small Purchase of Professional Service Providers Administrative Rule R
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Introduction to Procurement for Public Housing Authorities Competitive Proposals.
PRE-PROPOSAL CONFERENCE Welcome! Conference Room A/B NYSDOT 50 Wolf Rd, Albany NY Monday July 15, :00 to 12:00 Noon NEW YORK STATE DEPARTMENT.
Elevating the Quality of Life in the District. Debriefing Procedures Department of General Services Contracting and Procurement Division Policy, Research,
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
RFP 12-58, Data Warehouse Pre-Proposal Conference
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
ACEC INDIANA Environmental Business & Funding Source Conference
State Lobbyist Services
Construction Oversight
“How To Do Business” with Atlanta Public Schools
QBS: The Process Selecting a Design Firm
Consultant Selection Training
“How We Do Business”.
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Architectural Services RFQ
Demystifying Article 15A – MWBE Requirements
Procurement.
United Nations Procurement Division
Doing Business with the City
Presentation transcript:

Footer Text PROFESSIONAL SERVICES CONTRACTING

Footer Text PROFESSIONAL SERVICES CONTRACTING

Footer Text Table of Contents 3 Professional Services Overview Procurement Process TxDOT Precertification Precertification Categories Precertification Process 55 Professional Services Opportunities 66

Footer Text 4 Professional Services Overview

Footer Text What Are Professional Services?  Government Code 2254 – Professional And Consulting Services “Professional services” means services, within the scope of the practice as defined by state law, of: Accounting * Architecture Landscape Architecture * Land Surveying Medicine Optometry * Professional Engineering Real Estate Appraising, or Professional Nursing 5

Footer Text Why Is Architecture, Surveying And Engineering Different?  Government Code – Contract For Professional Services Of Architect, Engineer, Or Surveyor – In procuring architectural, engineering, or land surveying services, a governmental entity shall: (1) First select the most highly qualified provider of those services on the basis of demonstrated competence and qualifications; and (2) then attempt to negotiate with that provider a contract at a fair and reasonable price. – If a satisfactory contract cannot be negotiated… 6

Footer Text What Are Professional Services?  Providers Do Not Bid On Professional Services More Specifically  Providers Do Not Bid On Architecture, Engineering, Or Surveying Services 7

Footer Text Work Types Typically Outsourced  Engineering – Advance Planning – PS&E – Support PS&E services such as TRAFFIC, HYDRAULICS & HYDROLOGY  Surveying  Materials Engineering (Commercial Lab)  Subsurface Utility Engineering (SUE)  Architecture  Variety Of Combinations… 8

Footer Text Annual Expenditures 9

Footer Text TxDOT Districts 10

Footer Text 11 Procurement Process

Footer Text Basic Process 12  Identify Need To Outsource – Project Identification – Work Type Identification – Type of Contract – Number of Contracts  Publish Notice Of Intent (NOI) / Request for Qualifications (RFQ)  Receive Letters Of Interest (LOIs) / Statement of Qualifications (SOQ)  Screen LOIs For Acceptability (Long List)  Evaluate, Score, And Rank Long-Listed LOIs

Footer Text Basic Process, cont’d 13  Identify Top-Scoring LOIs (Short List)  Evaluate, Score, and Rank Short-Listed Firms, through Interviews and/or Proposals  Select Most Qualified Provider Based on Score  Negotiate Contract  Execute Contract  Initiate Work  Manage Contract

Footer Text Notice of Intent (NOI) 14  Formal Advertisement of TxDOT’s Intent to Contract for Professional Services  Communicates Work Types – Uses Precertification Work Categories  Communicates Staffing Requirements  Lists Work Categories, along with Anticipated Percentages

Footer Text Precertification 15  To Compete: – Firm Must Be Precertified – Must Be In Active Status (Complete Annual Renewal)  NOI Uses The Precertification Work Categories

Footer Text 16 TxDOT Precertification

Footer Text TxDOT Precertification 17  Requirement In Order To Be Eligible For TxDOT Professional Service Contracts (Engineering, Architectural & Surveying)  Acknowledgement Of Minimum Qualifications  Eliminates The Need To Submit Lengthy Qualification Information In Response To Each Advertisement

Footer Text Precertification Types 18  Employee Precertification – Based On An Individual’s Ability To Meet Requirements Professional and Educational Qualifications Previous Project Experience – Once Precertified – Always Precertified  Firm Precertification – Based On The Precertified Individuals Employed By The Firm – Some Categories Require Special Equipment – Status Can Vary As Employees Come And Go

Footer Text 19 Precertification Categories

Footer Text Work Categories 20  16 Work Groups  78 Separate Work Categories  NLCs – Non-Listed Work Categories

Footer Text Work Category Format 21  Category Description – Basic Description of Type of Work  Certification Requirements – Professional Qualifications – Experience – Education – Note: These are the Minimum Technical Requirements

Footer Text Working Categories On-Line 22

Footer Text 23 Precertification Process

Footer Text Precertification Process 24

Footer Text Precertification Process 25

Footer Text TxDOT Contact 26 Paula McGinley TxDOT Design Division Consultant Contract Office Phone: Fax:

Footer Text 27 Professional Services Opportunities

Footer Text Contracting Opportunities 28 Projected Contracts List

Footer Text Project Contracts List 29 Standard vs Federal

Footer Text Contracting Opportunities 30 Contract Solicitations

Footer Text Contract Solicitations 31

Footer Text Contracting Opportunities 32 Addenda and Attachments

Footer Text 33 Thank You

Footer Text TxDOT Contacts Division Contacts:San Antonio Contacts: 34 Camille Thomason, P.E. DES-CCO Phone: Dan M. Neal II, P.E., P.G. DES-CCO Phone: Lizette Colbert, P.E. SAT District Consultant Mgmnt Phone: Mathew Dalton, P.E. DES-CCO Phone: Kori Rodriguez, P.E. SAT PEPS Phone: