Deployment, logistics and systems engineering. PILOT Design Study Main functions of conceptual design study for PILOT for feasibility, costing and risk.

Slides:



Advertisements
Similar presentations
Ironwood Remote Observatory (IRO) Kenneth Archer July 2007 Ironwood Observatories.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
Service and Training. Our engineers and Instructors are all highly qualified and possess many years of experience with top manufacturers. Surveys Studies.
Alternate Software Development Methodologies
ITIL: Service Transition
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
CONCORDIA Logistics issues JB. Daban (LUAN) Thanks to Eric Fossat (LUAN) and Chiara Montanari (PNRA)
Lecture 13 Revision IMS Systems Analysis and Design.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
Lecture Nine Database Planning, Design, and Administration
MODULE “STRATEGY DEVELOPMENT”
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Overview of the Database Development Process
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Introduction to ISO New and modified requirements.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
Community Preparedness & Disaster Planning. Why Disasters occur ?
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
Wind / PV / Diesel in Off-grid: Lessons learned Best Practices
From Research Prototype to Production
DCS Overview MCS/DCS Technical Interchange Meeting August, 2000.
Visit us at E mail: Tele:
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Al Cooper Jeff Stith Earth Observing Laboratory (EOL) HIAPER Debrief 9 November 2005 Ongoing Development and Support: EOL Plans for Deployment of HIAPER.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Tom MAZOUR IAEA, Division of Nuclear Power
Installation and Maintenance of Health IT Systems
The Tiksi Hydrometeorological Observatory Program International Collaboration for Climate Studies U.S. Science Contact:
OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation.
Michael deLamare Requirements Management Program Functions R-9.
ERLN OPERATIONAL FRAMEWORK EPA Quality Management Conference Presented By: Sean Kolb Schatzi Fitz-James and Terry Smith, OEM Sean Kolb and Lisa Modigliani,
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
a guidance to conversion
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
IES Integration of research activities on a long-term perspective Co-operation between universities, research institutes, enterprises and technology organisations.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Winter 2011SEG Chapter 11 Chapter 1 (Part 1) Review from previous courses Subject 1: The Software Development Process.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
How can collaboration be improved ? - can research collaboration facilitate growth for sub-suppliers? Kenneth Thomsen DTU Wind Energy Ane Holck DTU Innovation.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Technical Operations 12 th July 2010 Dr Phil Spiby Eurostep Limited Integrating Systems Engineering Information with AP233.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
AIRPORT SURVEYS.
Planning and Realisation of Wind Farms
ITIL: Service Transition
Constraints Space Load Capacity Costs Operating hours.
Uniper Energy Services
Warehouses in Emergencies
Software and Systems Integration
Integration & Commissioning
GLAST Large Area Telescope:
Across the entire value chain
Engineering Processes
Charge and Agenda of the 18th TAC meeting
Presentation transcript:

Deployment, logistics and systems engineering

PILOT Design Study Main functions of conceptual design study for PILOT for feasibility, costing and risk assessment purposes. In order to properly capture the full lifetime facility cost, it is necessary to investigate and plan the operations of the complete facility as well as the telescope itself. Systems engineering approach

Systems Engineering Systems engineering is an interdisciplinary approach and means to enable the realization of successful systems … [an] integrated, ‘holistic’ view of the complete system, intended to ensure that the delivered system meets requirements. INCOSE (International Council on Systems Engineering)

Systems Engineering Integrated, multidisciplinary, ‘holistic’ view of complete system, intended to ensure that the delivered system meets requirements Not just nice words to keep in mind while doing ‘old style’ engineering – now a formalised methodology –ISO/IEC 15288, Second edition, 2008 Systems and software engineering – System life cycle processes –INCOSE Systems Engineering Handbook, Version 3.1, August 2007

Systems Engineering Formal documentation structure Full system design – system boundary definition Interface management (external) Requirements management (identification, validation, verification) All requirements to be traceable Documentation structure grows to map susbsystem design Interface management (internal) Document control (numbering, version control)

PILOT Documentation Structure Science Case Document Environmental Conditions Document Customer Requirements Functional & Performance Requirements Document Science Requirements Document Operations Concept Document System Specification Document Design Study Report Delivery Plan Document Subsystem FPRD Science Case Document

PILOT Documentation Structure Science Case Document Environmental Conditions Document Customer Requirements Functional & Performance Requirements Document Science Requirements Document Operations Concept Document System Specification Document Design Study Report Delivery Plan Document Subsystem FPRD Science Case Document Requirements traceability

What is PILOT?

Systems engineering methodology requires clear definition of system boundaries PILOT SYSTEM Dome C atmosphere Overland Antarctic transport system Antarctic air transport Satellite communications infrastructure Concordia Station Concordia- based support scientist Observer Concordia lifting/handling equipment Config tools Control I/F Data transport Raw data Reduced data Physical Optical Consumables supply Physical AAD (Hobart) staging facilities Docks and shipping Commissioning crew Antarctic legislation Archive/VO Astronomical science light Instrument designers/builders Physical Organisational Physical Organisational Dome C surface Physical

PILOT facility functional roles Training support and planning Logistics support and planning (transport) Consumables to Dome C Spares to Dome C New equipment to Dome C Waste from Dome C Equipment from Dome C (decommissioned or for refurbishment) Personnel to and from Dome C Logistics support and planning (consumables) Fuel, lubricants, filters, seals, wire, solder, batteries, minor maintenance supplies, cleaning fluids, wipes, storage media, tape, ties, etc. for Dome C. Office supplies for PILOT office Logistics support and planning (accommodation) Winter and Summer staff at Concordia Logistics support and planning (waste management) Maintenance support and planning Preventative and restorative for Dome C facilities Facility upgrade cycle Maintenance of stores (Dome C and PILOT office)

PILOT facility functional roles Communications support and planning Monitoring of requirements Local communications around Dome C site Comms link between Dome C and PILOT office (high and low bandwidth) Comms between PILOT office and community Data handling support and planning Dome C archive Live data transfer Archival transfer PILOT office archive PILOT partner astronomers’ use Community release and public archive Observing preparation support Provision of observing preparation tools to client astronomers Receipt of observing time applications from client astronomers Processing and review of observing time applications from client astronomers Scheduling of observations (queue preparation) Instrument exchange Observing supportTelescope and instrument operation

PILOT facility subsystem breakdown Facility extends well beyond components at telescope site Must consider all aspects of running any observatory –observing support, maintenance, data archive and distribution, TAC, upgrade cycle Extended logistics chain Unusual access/upgrade cycle

Unusual elements of PILOT system design for Dome C Site characteristics and facilities Physical access Communications Observing model Organisational model Commissioning/decommissioning

Dome C 75.6ºS 123.2ºE, 3250m elevation

Dome C

Concordia Station Significant infrastructure and logistics support ‘a dozen’ wintering staff –can accommodate up to 80 in summer PILOT proposed to be 500 – 1000m from station Cold: long periods <-60ºC, reaching -80ºC Supersaturation: frosting a problem Remote: limited physical access, limited communications Deep ice (>3000m)

Site access Physical access via traverse (tractors pulling sleds) or air Traverse can carry hundreds of tonnes, taking 10 to 14 days Air transport fast but limited in capacity IPEV have established traverse support to Concordia, with three traverses annually carrying ~450T (PILOT to augment for construction) Short access season ~10 weeks, November to February Access season applies to commissioning crews, too

Power supply PILOT Antarctic components expected to consume ~20kW annual mean load Sited close enough to Concordia to integrate power supplies (reliability, economies of scale) Concordia diesel generators have sufficient peak load capacity but limited by diesel PILOT requirements would require additional 60,000 litres of diesel annually Carry additional fuel with increased traverse capacity

Alternative power options Diesel has high cost due to transport Solar panels: reduce station fuel burn in summer to provide PILOT reserve Wind turbines: Year-round power supplement Payback period < 4 years Progressive or mixed implementation options Environmental credentials

Communications No overland communications link All data via satellite or physical carriage of media Two main satellite options: –Iridium (2400 $1/min) –Geostationary, 128kbps (limited coverage due to low elevation angles from 75ºS) Iridium broadband option planned rollout later 2008 Will not be possible to transmit all PILOT raw data Close remote control of telescope impractical

Queue-based robotic observing PILOT’s strengths in large surveys (wide field good seeing) Surveys well-suited to queue-based observing Limited winter access even for PILOT operator at Concordia Limited access and communications also suggest queue- based observing Robotic operation proposed Intelligent queue scheduler local to the telescope, responsive to variations in observing conditions

Queue-based robotic observing Observation scripts transmitted via satellite Wintertime instrument exchanges limited to those that can be simply automated (e.g. switching tertiary mirror to select Nasmyth port) Limited data reduction done in data pipeline for QA Observation reports and quality monitoring data transmitted back via satellite Full data archive physically carried out by air annually

Commissioning Year 1 (2011/12) Year 2 (2012/13) Year 3 (2013/14)  basic infrastructure setup (team accommodation, communications infrastructure, power supply, equipment handling)  site preparation  temporary(?) equipment protective accommodation  site communications  tower assembly  meteorological monitoring station  install other observatory building(s)  dome assembly  telescope assembly protective enclosure  telescope assembly  telescope test  telescope installation  instrument installation (commissioning imager only)  alignment, telescope tuning, TCS parameter setup  acceptance test  Science survey instrument commissioning

Decommissioning Part of systems engineering approach Legislated Antarctic responsibilities Nominal 10-year lifetime Dismantling and carriage out of structures similar to carriage in for commissioning No particular site restoration difficulties (deep ice) Possible handover to future facilities (interferometer? submillimetre?)