ACARP Presentation Developing Worker Problem Solvers Implementing Lean Techniques and Challenges.

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

Total Productive Maintenance
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
CAPA is Lean p Toyota mantra: People + Brilliant processes = Amazing results Always: Add value Smooth flow Pull not push Make decisions slowly,
 Truths About Change  Work Smarter, Not Harder  Lean Processing  Wants and Needs  How do we begin?
Task Board Monitoring Cards Visit GoLeanSixSigma.com for more Lean Six Sigma ResourcesGoLeanSixSigma.com.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-In-Time and Lean Systems
Computer Engineering 203 R Smith Agile Development 1/ Agile Methods What are Agile Methods? – Extreme Programming is the best known example – SCRUM.
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Lean Coaching Principles: using Lean Six Sigma and Coaching to Improve the Quality of Outputs Gail Rowles Alison Pattimore UK Office for National Statistics.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
Science Inquiry Minds-on Hands-on.
Shelee King George Puget Sound Center for Teaching, Learning and Technology.
ACARP Conference – September 2007 Lessons from Manufacturing.
 There are five primary 5S phases: 1.Sort. 2.Straighten. 3.Shine. 4.Standardize. 5.Sustain. The 5 S's Kamalnathan, MIM.
How Team-Oriented Problem Solving Unleashes Workforce Creativity Gerard M. Cronin Kaizen Promotion Office Manager Massachusetts General Hospital CCM Vivarium.
Based on the book: Managing Business Process Flows.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Linking Process and Performance Metrics
The leadership piece. What does the leadership concept mean?  Leadership is chiefly about dealing with the intangibles and the most frustrating situations.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Toyota Production System (TPS) MGMT- E5060 Operations Management.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
DAILY MATH SKILLS DMS OBJECTIVES Determine the purpose of DMS Plan for implementation of DMS at our school Understand how DMS will look in the classroom.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Process Improvement An Overview of Lean Agenda: The origin of Lean
Developing a Lean Strategy Akın Aydemir05.July.2012.
Philosophy and Key Concepts
G-1 Rapid Process Improvement Event Overview Dewey Warden.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
CPA Leadership Institute Dustin Hostetler LSS Master Black Belt Office: Mobile:
Have you implemented “Number Talks” in your classroom? What are the pros? What are the cons? Any suggestions?????
Problem-Based Learning. Process of PBL Students confront a problem. In groups, students organize prior knowledge and attempt to identify the nature of.
Chapter 16 Problem Solving and Decision Making. Objectives After reading the chapter and reviewing the materials presented the students will be able to:
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Total Productive Maintenance (TPM)
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Lean Project Management Principles
Continuous Improvement (CI) Overview A quick review of principles, methodology, and tools.
Practical Coach Discussion Session #60. Learning Objectives To understand the value of coaching in a manager’s work To learn how to determine when to.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
DAKTRONICS LEAN JOURNEY. DAKTRONICS VISION To be the WORLD LEADER at informing and entertaining people through dynamic audio-visual communication systems.
Advancing the World’s Supply Chains LEAN LEADERSHIP: Building the Lean Culture Robert Martichenko | June 17, 2016.
Semester 8th (Self Support)
Scott L. Evrard Lean Architect and OD Consultant
Lean Manufacturing Series
Small Sites Planning & Scheduling
Employee Engagement Leaders Networking Dinner June 2013 Water Rat Hotel - 256 Moray St, South Melbourne VIC 3205 Tuesday 11th June 2013, 6.30pm drinks.
IENG 451 / 452 Stability: Total Productive Maintenance
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
Organizational Agility
OVERALL EQUIPMENT EFFECTIVENESS (O E E)
Introduction to Lean and Lean Training
Task Board Monitoring Cards
LEAN Principles Total Productive Maintenance (TPM)
Presentation transcript:

ACARP Presentation Developing Worker Problem Solvers Implementing Lean Techniques and Challenges

2

3

4

5 Standard Work 

6 Standard Work  Visual Management 

7 Standard Work  Visual Management  Quick Changeovers 

8 Standard Work  Visual Management  Quick Changeovers  Auditing 

9 Standard Work  Visual Management  Quick Changeovers  Auditing  Levelling out work 

10 Standard Work  Visual Management  Quick Changeovers  Auditing  Levelling out work  Worker problem solvers 

HBS professor Steven Spear on Toyota “Kent (H. Kent Bowen) and I started to form the impression that despite all the attention that had already been paid to Toyota, something critical was being missed …” “…observers (of the Toyota Production System) confuse the tools and practices they see on their plant visits with the system itself.” “Toyota Production System makes a deliberate effort to develop the problem-solving skills of workers” 11

HBS professor Steven Spear on Toyota 12 “The Toyota Production System has so far been transferred successfully only when managers have been able and willing to engage in a similar process of questioning to facilitate learning by doing ”

13 Jim Womack – Author of Lean Thinking, Jan 2006 “A Lean management system involves managers at every level posing the key problems that need to be solved and asking the teams they lead to develop and implement the answers. This practice of asking the correct questions rather than providing the correct answers … is perhaps the starkest contrast between Lean Thinking and orthodox mass production and the hardest to implement.”

Lesson – Go and have a look Go to the place where value is added! Ohno – who is credited with the development of the Toyota Production System said... Management should walk the factory floor at the rate of 100m per hour 14 Slow down! Observe! Talk to the people adding value! Involve these people in the improvements!

15 If you want a step change in performance you need to develop Worker Problem Solvers To develop Worker Problem Solvers you need to design work so they can see that a problem has occurred, and they need to be involved in solving it.

24 April

Lesson – Audit and improve front line management Re-design mining tasks into “Standard Work” … 17 Audit the way “Standard Work” is done… Develop front line managers who coach & facilitate their teams in problem solving

Standard Work and Auditing Audit Front Line Managers need to audit standard work and use open ended questioning. They then become coaches and mentors

Lesson – Measure Success Develop a “dashboard” that ensures future success – not just looks at the problems of the past 19

24 April W aiting O ver Production R epairs / Defects M otion (unnecessary) P rocessing (unnecessary) I nventory T ransport

24 April

If you want a step change in productivity Design work to promote the development of worker problem solvers. Involve your total workforce Focus on real problems. Standardise and audit work – this allows problems to be identified early and solved in real time – this promotes the development of worker problem solvers. Teach manager to ask the right questioning to facilitate learning by doing. 22

23 Total Available Time 24 * 7 Scheduled Production Time Scheduled Down Time Scheduled Down Time Reduced by maintenance shifts Available Run Time Set-up Time Set-up Time Reduced by panel advances Reported Run Time Unplanned Recorded Stoppages Impacted by breakdowns as per Deputies reports Net Run Time Minor Unrecorded Stoppages Unrecorded Stoppages Reduced by getting supplies to face / wait on car / ventilation extensions Efficient Net Run Time Slow Speed Slow Speed Proficiency (speed) of bolters and miner driver Value Add Time Rejects Rework Rejects Rework Repairing roadways, intersections, off-centre or over-wide roadways Equipment Value Adding Time

24 Big productivity gains - Its about the people There are enormous productivity paybacks in eliminating non value adding time. And These productivity gain do not require big capital investment There are enormous productivity paybacks in eliminating non value adding time. And These productivity gain do not require big capital investment Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Efficient Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Value Add Time Net Run Time Reported Run Time Total Available Time Efficient Net Run Time Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Value Add Time

25 Big productivity gains - Its about the people Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Efficient Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Value Add Time

26 Big productivity gains - Its about the people Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Efficient Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Value Add Time Net Run Time Reported Run Time Total Available Time Efficient Net Run Time Net Run Time Reported Run Time Available Run Time Scheduled Production Time Total Available Time Value Add Time

27