A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.

Slides:



Advertisements
Similar presentations
HVAC523 Heat Sources.
Advertisements

K&W Permanent Metallic ® Block Seal
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
AeroE 423 Composites Travis Brotherson Kevin Howard Mike Nielsen 1.
Basic Refrigeration Cycle
1 Low Conductivity Water (LCW) Connection Training Environmental Energy Technologies Division Safety Topic January 9, 2012.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Installation. Indoor Unit Installation Typical Installation.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
© 2012 Delmar, Cengage Learning Automotive Hoses Chapter 23.
Cooling As working temperatures rise, the strength of metals used reduces. This in turn will force manufacturers to use superior metals/alloys, which can.
PREMIX PLANTS. We offer full supply of grinding, dosing and conveying lines, starting with the intake of raw materials, through main storage tanks, grain.
TrueSTEAM™ Humidification Systems Module 3: Basic Installation.
Hydrotherapy Spa Launch Presentation. Hydrotherapy Series - 7 Advantages
SPRAY-UP. WHAT IS SPRAY-UP? one or more continuous fiber rovings fed through a chopper one or more continuous fiber rovings fed through a chopper fiber.
RDP-TEKKEM Precision Hydrated Lime Systems. Lime Silo Precision Dosing Assembly RDP-Tekkem System Controls Lime Slurry Piping Lime Slurry Pump Slurry.
Composite Manufacturing Group 15 Eglin AFB Brandon Bair - John Brewer - Darnell Brown - Rob Contes Sponsor: Jeff Wagener - Lt Joe Czabarnek, AFRL Faculty.
Advanced Maintenance Provider  Aeration Equipment …
Design and Manufacturing
Plastics Processing and Safety Issues. Foam Processing.
Boiler Mountings.
"AIR COOLER" Heat Exchanger
Project Presentation: The AccuDrill Company: AccuTools Inc.
HVACR416 - Design Humidification. Relative Humidity 1.Air in the home is artificially dried out when it is heated. 2.Because warm air expands, this expansion.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
Unit A3-12 Insulating Agricultural Structures Problem Area 3 Construction Systems.
Machining is processes in which we get a desired final shape and size from of raw material. 1.Conventional / Traditional Machining 2.Non Conventional.
CD Ozone (oxidation) Ozone is produced with a high voltage electrical discharge called a “corona discharge” or “CD”. The idea is to actually create a small,
Hydraulics For The Long Term
Safe Facilities and Equipment
Accessories Planned Maintenance. Types l Humidifiers l Air Cleaners l Heat Recovery Ventilators l Condensate Pumps.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Floating Head Heat Exchanger
INTRODUCTION Definition:
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Automotive Algebra Maintaining the cooling system Using Algebra for a simple solution Joe Agruso,Xochitl Molina.
“Fix Tube Sheet” Heat Exchanger
Chapter 14: Fabrication of Plastics, Ceramics, and Composites
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
1 ASU Satellite Laboratory Fuselage Design Presenter: Eric Chen.
Discover the Dosmatic Difference Maintaining your Dosmatic injector for years of service.
AfterSalesTraining Welcome to AfterSalesTraining.
7 A/C System Components, Operation, and Service.
Sigma Rotary Screw Compressors
Washer and Dryer Compatible Steamer By: Corey Frazier, Isaac Blackman, Adam Harbeson, and Jon Goley.
Temperature Test Allows monitoring of temperature changes.
Automotive Engines Theory and Servicing
Automotive Heating And Air Conditioning
Maturing and cold smoking
Automotive Heating And Air Conditioning
14 Refrigerant Recovery, Recycling, and Recharging.
Application Operation principle Advantages Highlights Comparison
SB Packing Automatic Downpuller Power Unit
Chapter 14 Cooling System.
Sonozaire Routine Maintenance
Plastic Processing Extrusion Injection Moulding Blow Moulding
Floating Head Heat Exchanger
Cryomodule Assembly Plan
Pneumatic System Conditioning
Presentation transcript:

A Canadian Hot Tub Factory Tour

You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating the sheet to a consistent and precise temperature, and then molding it into the form of the desired model.

You then flip the shell upside down and begin spraying vinyl-ester resin on the shell. This lightweight structural bonding system ensures a watertight shell. Moulds are weighed and measured electronically to maintain consistency in production quality.

The vinyl-ester resin is then hand rolled to compact the resin and remove any air pockets.

Once the vinyl ester has completely cured, fiberglass is added to increase the shell strength. The shell is weighed and its thickness calibrated to ensure compliance with quality controls.

The fiberglass is again hand rolled to remove the air pockets. This gives the shell the highest shell strength / weight ratio.

Once the shell has cured, the lip of the spa is trimmed and the edge is ground smooth.

Once the shell has been trimmed, it progresses to drilling. The jet, valve and filter housing locations are then drilled.

Once the shell has been drilled, it progresses to grinding. The openings are ground to create a smooth flush surface area. This will ensure tight fitting plumbing.

The plumbing bodies are then mounted to the spa. Gaskets and silicone are used for all jet ports and filter canisters and are allowed to seal and harden before continuing the construction process.

After curing, air and water lines are added.

A maximum number of direct lines are used to minimize flow restrictions and maximize massage force.

Once jetted and the plumbing has been installed, pressure treated 2”x4” structural supports are attached. It ensures equal weight distribution, and the long-term structural integrity of the spa.

The framework of beams are secured to the shell using 2 lbs closed cell structural foam. All joints in the structure are permanently secured in this manner.

Next the equipment is installed.

The Gecko Control System - The most rugged Canadian spa pack platform currently offered

Foam vibration absorbers for pump mounts. Rubber mounts for easy access Quiet operation and minimal maintenance due to minimal vibration. The knife valves allow you to change a pump motor without having to drain the tub.

The air control uses warm air from the equipment area to inject air into the spa thereby keeping the spa warmer. Hose Bibb included for easy draining

Spas can be Ozone prepared Or Ozone ready

The ozonator is mounted at the highest possible point in the cabinet. The clear 3/8” tubing is connected from the ozonator to the mazzei injector.

The chamber, containing the electrode cell is installed into the circulation system after the heater in the spa. The Brominator System Controller is installed in the equipment area for easy access to the output adjustment knob.

Easy to get to LED lighting assemblies.

Every spa is taken to a water test station. At this point, the electronic equipment is installed in the tub and the spa is tested for all functions and for leaks. This control ensures no tub can bypass the rigorous testing procedure. With the equipment in place, manufacturers observe every inch of the spa to ensure there are no drips. Jets are individually checked by a viewing tube to guarantee they work properly.

Once the spa has been fully tested at the water test station, spa skirts are attached by concealed screws to the tub frame and can be detached and re-attached easily without damage to the skirt.

This eliminates adhesion of the foam to the outer skirt which help to make maintenance clean and easy. A plastic liner is placed around the spa before foam is added as an insulator to the spa.

Every spa is uses one form of insulation or another but all are energy efficient.

Quality control and final preperation.