Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Advertisements

Strategic Decisions (Part II)
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Operations Management Aggregate Planning Chapter 13
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
Aggregate Planning in a Supply Chain
Operations Management
Aggregate Planning.
Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Production Planning All manufacturing and service operations require planning and controlling, although the formality and detail may vary. Some operations.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Operations Planning Horizons
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Production Planning and Control.  Allocate the company’s ressources  Taking into account :  Strategic and operational objectives (quantity, quality,
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Inventory Stock of items held to meet future demand
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Aggregate Planning This Chapter explores:
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning. Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 6 to 18 months. Short range Intermediate.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Sales and Operations Planning CHAPTER 11.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Inventory Stock of items held to meet future demand
Chapter 14 Aggregate Planning.
Aggregate Planning 2 2.
BUAD306 Aggregate Planning.
Operations Management
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Aggregate Production Planning (APP)
Inventory Stock of items held to meet future demand
Presentation transcript:

ISQA 459 Sales & Operations Planning Planning production to meet the firms strategic objectives Demand vs. Supply Volume Mix How is sales plan different from operations plan? Demand > Supply Demand < Supply

Balance Supply & Demand Intermediate Term (3-18 months) APP = Competitive Advantage: Anheuser-Busch- 40% of US beer Production of certain brands in specific plants High volume & low variety/plant Labor requirements Meticulous cleaning between batches Inventory Capacity Goal: High facility utilization Why?

Hierarchical Planning Annual demand by item and by region Monthly demand for 15 months by product family for quarter by item Forecasts needed Allocates production among plants Determines seasonal plan by Determines monthly item production schedules Decision Process Decision Level Corporate Plant manager Shop superintendent 5 5

At this stage Generally Planning for a product line or family (AGGREGATE) not individual SKUs How much beer at each plant of each type Not container types, etc. Inputs Strategic objectives, demand forecasts, company policy, financial constraints, capacity constraints. Outputs Size of workforce, production per month (units or $), inventory levels, and units subcontracted, back ordered, or lost.

Aggregate Planning Goal: Specify the optimal combination of the following variables to minimize cost production rate (units completed per unit of time) workforce level (number of workers) inventory on hand (inventory carried from previous period) 6 6

Balancing Aggregate Demand and Aggregate Production Capacity Suppose the figure to the right represents forecast demand in units. 10000 10000 8000 8000 7000 6000 5500 6000 4500 Now suppose this lower figure represents the aggregate capacity of the company to meet demand. 4000 2000 Jan Feb Mar Apr May Jun 9000 What we want to do is balance out the production rate, workforce levels, and inventory to make these figures match up. 10000 8000 8000 6000 6000 4500 4000 4000 4000 2000 Jan Feb Mar Apr May Jun 9 9

Aggregate Planning Examples: Unit Demand and Cost Data Suppose we have the following unit demand and cost information: Demand/mo Jan Feb Mar Apr May Jun 4500 5500 7000 10000 8000 6000 Materials $5/unit Holding costs $1/unit per mo. Marginal cost of stock-out $1.25/unit per mo. Hiring and training cost $200/worker Layoff costs $250/worker Labor hours required .15 hrs/unit Straight time labor cost $8/hour Beginning inventory 250 units Productive hours/worker/day 7.25 Paid straight hrs/day 8 11 11

Cut-and-Try Example: Determining Straight Labor Costs and Output Given the demand and cost information below, what are the aggregate hours/worker/month, units/worker, and dollars/worker? Demand/mo Jan Feb Mar Apr May Jun 4500 5500 7000 10000 8000 6000 Productive hours/worker/day 7.25 Paid straight hrs/day 8 12 12

Cut-and-Try Example: Determining Straight Labor Costs and Output Given the demand and cost information below, what are the aggregate hours/worker/month, units/worker, and dollars/worker? 7.25x22 Demand/mo Jan Feb Mar Apr May Jun 4500 5500 7000 10000 8000 6000 Productive hours/worker/day 7.25 Paid straight hrs/day 8 7.25/0.15=48.33 & 48.33x22=1063.33 22x8hrsx$8=$1408 12 12

Chase Strategy (Hiring & Firing to meet demand) Lets assume our current workforce is 7 workers. First, calculate net requirements for production, or Demand-Begin Inv. Then, calculate number of workers needed to produce the net requirements, or Net req/Units per worker or # workers Finally, determine the number of workers to hire/fire. Current Workers-Required = (-) hire or (+) fire 13 13

Chase Strategy (Hiring & Firing to meet demand) Lets assume our current workforce is 7 workers. First, calculate net requirements for production, or 4500-250=4250 units Then, calculate number of workers needed to produce the net requirements, or 4250/1063.33=3.997 or 4 workers **Round-up Finally, determine the number of workers to hire/fire. In this case we only need 4 workers, we have 7, so 3 can be fired. 13 13

Complete the calculations for the next two months of the planning horizon. 14 14

Complete calculations for the next two months planning horizon with the other costs included. 15 15

Level Workforce Strategy (Surplus and Shortage Allowed) Lets take the same problem as before but this time use the Level Workforce strategy. This time we will seek to use a workforce level of 6 workers. 16 16

Complete the calculations for next two months in the six month planning horizon. 17 17

Complete calculations for the next two months in the six month planning horizon with the other costs included. Labor Material Storage Stock-out 18 18