Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.

Slides:



Advertisements
Similar presentations
1 Calice ECAL Meeting UCL 8/06/09David Ward Thoughts on transverse energy profile for e/m showers David Ward  We have work from G.Mavromanolakis on this.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
17 May 2007LCWS analysis1 LCWS physics analysis work Paul Dauncey.
Longitudinal shower profile of the DESY and CERN testbeam data in the electromagnetic calorimeter Valeria Bartsch (UCL) & Nigel Watson (Birmingham)
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
HCAL Digitization Rick Wilkinson 1. CMSSW HCAL Simulation Three gains are used as input –Calibration (GeV/fC) From DB gain, by channel –Electronics (fC/photoelectron)
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
Calibration issues for the CALICE 1m 3 AHCAL LCWS11 - International Workshop on Future Linear Colliders Granada, Spain 2011/9/28 Jaroslav Zalesak Institute.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
First Results from T3B Calice AHCAL Meeting – Desy, January 2011 Christian Soldner Max-Planck-Institute for Physics.
DHCAL - Resolution (S)DHCAL Meeting January 15, 2014 Lyon, France Burak Bilki, José Repond and Lei Xia Argonne National Laboratory.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
May 1-3, LHC 2003V. Daniel Elvira1 CMS: Hadronic Calorimetry & Jet/ Performance V. Daniel Elvira Fermilab.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Interactions of hadrons in the SiW ECAL Towards paper Naomi van der Kolk.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Longitudinal shower profile - CERN electron runs Valeria Bartsch University College London.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
AHCAL analyses overview List of ongoing analyses targeted to the upcoming publications Erika Garutti.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL SiW ECAL Meeting at LLR, February 8th 2011.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
ATLAS Jet/ETmiss workshop, 24/06/ Scale and resolution Measurement errors Mapping of material in front of EM calorimeters (|  | < 2.5) Inter-calibration:
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Interactions of pions in the Si-W ECAL prototype Towards a paper Naomi van der Kolk.
M.D. Nov 27th 2002M0' workshop1 M0’ linearity study  Contents : Electronic injection Laser injection Beam injection Conclusion.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
1 Calice Analysis 21/7/08David Ward Quick look at 2008 e - data; low energy hits in 2006  2008 e - data from Fermilab; July’08  Looked at several runs.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
Online Monitoring : Detector and Performance check
Calice collaboration meeting– March 5th 2012 – Shinshu, Japan
CALICE scintillator HCAL
Correction of saturation effect of ICCD
Plans for checking hadronic energy
E. Garutti - Main Meeting
Rick Salcido Northern Illinois University For CALICE Collaboration
Testbeam analysis on module #1
Michele Faucci Giannelli
Presentation transcript:

electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may 10 th – 12 th 2007 Niels Meyer & Nanda Wattimena

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 2 MC digitisation (reminder) MOKKA Monte Carlo [GeV]:  Monte Carlo [MIP]  light crosstalk to neighbouring tiles  add MIP calibrated pedestal events (from data)  remove hits below 0.5 MIP & uncalibrated channel simulation of nonlinearity  convert to pixel with measured lightyield (pixel/MIP)  apply SiPM response curve measured at ITEP for each SiPM  convert back to MIP with same lightyield  convert back to GeV !! not in released code !!

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 3 selection criteria HCAL only August runs (double sampling, wrong SiPM working point ~ 0.5 V too low Bias) 50 GeV secondary beam (320678, , , , , ) demanding 3x3 cm² trigger on & 1x1m² trigger off ignoring hits below 0.5 MIP ignoring uncalibrated (MIP, gain or intercalibration) channel Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 4 uncalibrated channel less than 4 hits in uncalibrated cells per event (mean value) no hits above ITEP measured curves at any energy hits in uncalibrated cells are removed from analysis the energy loss is not compensated for MC includes uncalibrated cells and treats them in the same way

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 5 non-linearity correction SiPM response curves measured at ITEP  linear fit to first 3 points to fix „linear pixel“ scale  convert data from ADC channel to pixel  find corresponding „linear pixel“  convert corrected pixel to MIP  convert MIP to GeV if no ITEP curve in database use arbitrary curve if data point higher than measured curve use last measured point !! different correction as in released code !!

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 6 temperature variation temperature variation in module 9 during the gain taking periode: K during the electron runs temperature: K gain variation during this periode: < 2%

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 7 systematic uncertainties temperature stable within ~0.5K (not corrected for  systematic error) gain calibration G from low LED light:  G  2%  intercalibration I from LED light:  I  2%  non-linearity correction f resp from ITEP curves:  f  4%  Pixel uncertainty:  pix  5%  MIP calibration M from muon beam:  M  3%  pix has to be propagated through non-linearity correction  fortunately this leads to  G  I almost cancel out  M is the dominating error

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 8 linearity sampling factor SF data (10-20 GeV): MIP/GeV = GeV/MIP sampling factor SF MC (10-20 GeV): MIP/GeV = GeV/MIP data still shows saturation effects up to 6% difference due to shifted working point: data taking – ITEP measurement ?

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 9 number of hits ~ 2 more hits in data  within nonlinearity effect still „MIP“- reminent at high energies  selection can be improved

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 10 noise contribution 18 noise 20GeV beam with 1.2 MIP per hit times 1.8*0.029 GeV/MIP  1.1 GeV noise N hitshit amplitude [MIP] energy sum [GeV]

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 11 noise shape E beam = 10GeV E beam = 45GeV distance from center [cm]  E HCAL /event [GeV]  calorimeter depth [X 0 ]  lateral noise profile is flat (few outliners, though) longitudinal profile shows noisy modules (especially module 2 in layer 11) E HCAL /event [GeV]  calorimeter depth [X 0 ]  module 2

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 12 lateral shower profile good agreement between data & MC (within the rather large systematic uncertainties)

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 13 energy per hit good agreement between data & MC at low energies (<20 GeV) discrepancies at higher energies: beam profile & saturation

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 14 longitudinal profile MC shower still starts too late (beam-line material in MC ?) module 7: missing ITEP curve for 4 core cells module 7 module 2

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 15 t max & att shower depth t max = b / c data: 1.04 x MC: 0.90 x shower attenuation att = 1 / c data: 0.07 x MC: x ??????

Niels Meyer & Nanda Wattimena - CALICE collaboration meeting may 11 th 2007 em shower in the AHCAL 16 summary & outlook done: analysis chain fully established  6% nonlinearity remaining at high energy data & MC in agreement within remaining nonlinearity dominated by systematic uncertainties to do: repeat for October data (more active layers, correct working point, but less data points) apply temperature correction (LED data)