MARSSIM Revision 2 Request for Input Public Meeting February 10, 2011 Kathryn Snead MARSSIM Workgroup Chair.

Slides:



Advertisements
Similar presentations
Slides to accompany the Adult Social Care Letter on National Data Collections to Local Authorities March Developed by the HSCIC / ZBR communications.
Advertisements

1 MARLAP, MARSSIM and RETS- REMP: How is All of this Related…or NOT? Robert Litman, Ph.D. Eric L. Darois, MS, CHP Radiation Safety & Control Services,
BLS U.S. Bureau of Labor Statistics The Paperwork Reduction ACT (PRA) What You Need to Know for Government UX Work Jean Fox Presented to the.
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
A Partnership Dedicated to Radiation Protection Conference of Radiation Control Program Directors, Inc. (CRCPD) The structure, working groups, and activities.
Industry Meeting with EPA ORD November 18, 2009.
KATHRYN SINNIGER ASSISTANT GENERAL COUNSEL FOR REGULATION AND ENFORCEMENT OFFICE OF THE FEDERAL REGISTER LIAISON CONFERENCE JUNE 5, 2014 U.S. Department.
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
Green Remediation An Overview of the State of the Practice
Alaska Contaminated Lands Conveyed to Alaska Native Corporations
Multi-Agency Radiological Laboratory Analytical Protocols Manual: MARLAP Presentation to the Radiation Advisory Committee/Science Advisory Board April.
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
0 The Rule-Making Process How It Works and How You Can Get Involved First Annual FAR/DFARS Conference October 24, 2006.
National Water Quality Monitoring Network Design Alfred L. Korndoerfer, Jr. Karl Muessig.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
1 Institutional Controls LTS “Framework” EPA Post-ROD Authority State and Tribal Government Working Group March 14, 2002.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 Federal Grants Streamlining Michael Nelson Director, Grants Management Division.
OFCCP Proposed Section 503 Regulations Webinar Wednesday, January 11,
Department of Commerce Bureau of Industry and Security “EAR Regulatory Update” Arlington, Virginia June 10, 2008 Timothy Mooney Export.
OAS Meeting August 2012 Jennifer Opila (CO) and David Allard (PA)
NIMAS National Instructional Materials Accessibility Standard OSEP Project Directors Conference July 31, 2006 Chuck Hitchcock Director, NIMAS TA Center.
U.S. Nuclear Regulatory Commission: Proposed Tribal Policy Statement National Tribal Air Association February 26, 2015 Michelle Ryan, Intergovernmental.
September 2014 Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61 Tom Corbett, Governor E. Christopher Abruzzo, Secretary.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
1 Environmental Business Council September 22, 2009 Janine Commerford Assistant Commissioner BWSC in FY10.
Web Resources Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Department of Defense Joint Services Environmental Management Conference April 14, 2005 Tampa, FL.
Potential Addition of Vapor Intrusion to the Hazard Ranking System U.S. EPA Office of Solid Waste and Emergency Response February 24, 2011 Listening Session.
Health Effects Program: Technical Support for NRC Programs Elijah Dickson Eli Goldfeiz, CHP, Ph.D. Tony Huffert, CHPDoris Lewis Robert Meck, Ph. DMohammad.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
Radiological Health Years in Review. Legislation 2001 General Assembly HB 1903 Health; radon programs SB 838 Health; radon proficiency listings.
What is a Public Health Assessment? “The evaluation of data and information on the release of harmful substances into the environment in order to assess.
SUBCOMMITTEE ON HYDROLOGY Overall Goal – from purpose statement: “To improve the availability and reliability of (surface water) information needed for.
IAEA International Atomic Energy Agency International Standards, Codes and Guidance for Radiation Safety Regulatory Infrastructure IAEA Advanced Regional.
Submitting Public Comments to the EPA Public Outreach Presentation New Orleans, LA June 26-27, 2014 Holly Wilson U.S. Environmental Protection Agency Office.
Update on NRC Low-Level Waste (LLW) Program Activities.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
2004 DoD Standardization Conference Product/Process Certification Panel Bldg. 33 Washington Navy Yard Federal Bldg. Oakland, CAU.S. Courthouse Las Vegas,
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Environmental Management Division 1 NASA EMS Building Blocks to Success Michael DeWit, QEP EMS Lead ICF Consulting Inc. Fairfax, VA Michael J. Green, PE.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
OFCCP Proposed Section 503 Regulations Webinar OFCCP Proposed Section 503 Regulations Webinar If you are unable to log onto the webinar,
US Army Corps of Engineers Portland District Sediment Evaluation Framework and Project Review Group Update Marci E. Cook Project Coordinator, RSET/SEF/PRG.
Department of Health and Human Services1 Update: October 2006 Public Meeting on Emergency Research Diane Maloney, J.D. Associate Director for Policy FDA.
Public Meeting October 21,  Open House6 - 7 PM  Presentations7 - 7:50 PM  Break7: PM  Q & A8 – 9 PM  Conclude9 PM.
Staged Electronic Data Deliverable (SEDD): Overview and Implementation Status Dr. Anand R. Mudambi US Environmental Protection Agency (USEPA) November.
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
United States Nuclear Regulatory Commission NRC’s Risk-Informed and Performance- Based Approach to Decommissioning DOE Workshop on Risk-Based End States.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
MARLAP Measurement Uncertainty Workshop
LOW LEVEL RADIOACTIVE WASTE FORUM--FALL 2014 MEETING
Update on EPA Regulatory and Guidance Activities
Community Development Department April 3, 2017
Fall Low Level Waste Forum Meeting
Community Development Department April 3, 2017
Georgia Update Jeff Cown Land Protection Branch
Overview of NRC Low-Level Waste Activities and Initiatives
CRCPD Update Presented to the National Radiological Emergency Preparedness Conference May 2004.
Community Development Department April 3, 2017
Presentation transcript:

MARSSIM Revision 2 Request for Input Public Meeting February 10, 2011 Kathryn Snead MARSSIM Workgroup Chair

1 MARSSIM Revision 2 Introductions and Logistics Document Overview Planned Revisions Comments and Next Steps

2 Introductions and Logistics

3 Introductions Members of the MARSSIM Workgroup Members of the Public Facilitator – Helen Burnett, EPA Center for Radiation Information and Outreach

4 MARSSIM Workgroup Independently-chartered Workgroup Under the ISCORS Umbrella since 2007 Four Federal Agencies Department of Defense (Air Force, Army, and Navy representatives) Department of Energy Environmental Protection Agency Nuclear Regulatory Commission CRCPD Participation

5 Logistics General logistics Meeting logistics Please write comments or questions on cards Submit cards to Facilitator Depending on the number of cards, time may be limited to provide comments/questions Workgroup will respond to comments or questions as time permits

6 Document Overview

7 Family of Three Multi-Agency Documents MARSSIM – Published 1997, Updated 2001 MARSAME – Published 2009 MARLAP – Published 2004 Technical Documents - Not Policy

8 Document Overview MARSSIM (Multi-Agency Radiation Survey and Site Investigation Manual) Covers real property (surface soils and building surfaces) Provides defensible and rigorous surveys for cleanup, especially Final Status Surveys Incorporates historical site knowledge and a graded approach to survey effort Recommends a two-tiered approach for surveys using scanning and direct measurements or samples

9 Document Overview MARSSIM – Widely Used NRC Decommissioning Sites DOE, EPA, DoD, and State Cleanup Sites Provides an already agreed-upon approach at sites with multi-party cleanup agreements

10 Document Overview MARSAME (Multi-Agency Radiation Survey of Materials and Equipment) Supplement to MARSSIM Provides defensible and rigorous radiation surveys for cleanup, operations, or interdiction Incorporates process knowledge and a graded approach Addresses surficial and volumetric contamination and difficult-to-measure areas

11 Document Overview MARLAP (Multi-Agency Radiation Laboratory Analytical Protocols) Provides defensible and rigorous protocols for radiation measurements performed in a laboratory setting Issued by a separate workgroup (MARLAP Workgroup) with specialized knowledge Included additional agencies: USGS, DHS, FDA, and NIST

12 MARSSIM Revisions

13 Planned Revisions MARSSIM not updated since 2001 Mostly errata and typos corrected before that date

14 Planned Revisions Full Revision (Rev. 2) planned for 2011 Update treatment of measurement uncertainty Update measurement methods Address user comments Increase emphasis on regulator interface during survey design Make definitions/terms consistent between documents Improve discussions of hotspots and UMTRCA standards Scenario B

15 Planned Revisions Update treatment of measurement uncertainty MARSAME and MARLAP in line with the state of the science regarding measurement uncertainty Complies with current guidance from ISO and NIST

16 Planned Revisions Update measurement methods MARSSIM written with the current (~1995) measurement technology in mind The state of radiation instrumentation improved MARSAME includes additional flexibility to take that into account

17 Planned Revisions Address user comments Both regulators and contractors submitted comments regarding the useful or confusing parts of MARSSIM Ten years of use generated significant lessons learned on both sides Increased emphasis on regulator interaction during survey design

18 Planned Revisions Better discussions of hotspots and UMTRCA standards MARSSIM didn’t explicitly address UMTRCA Hotspot discussion underway Make definitions/terms consistent between documents: User comments led to changes in some key terms for the issuance of MARLAP and MARSAME

19 Planned Revisions Scenario B MARSAME allows the use of Scenario B Already in use in some states for MARSSIM

20 Comments and Next Steps

21 Collecting Comments Collecting public comments Dedicated address: Physical address: MARSSIM Workgroup, c/o Kathryn Snead, Workgroup Chair, USEPA, 1200 Pennsylvania Avenue, NW, Mail Code 6608J, Washington, D.C Public meeting: February 10, 2010, EPA East Building Conference Room 1117A, 1201 Constitution Avenue, NW, Washington, DC

22 Next Steps Public Comments collected through April 1, 2011 Consultation with EPA’s Science Advisory Board Internal Agency Review Public Review Final Issuance

23 Next Steps Updates on the MARSSIM Revisions will be posted to the MARSSIM Workgroup website: Feedback on the comments received will be posted as part of the Federal Register Notice announcing the availability of MARSSIM, Revision 2.

24 Questions?