Overall Equipment Effectiveness (OEE)

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

The Five Ss.
Total Productive Maintenance
Total Productive Maintenance and FTM From Werardt
Improving Employee Performance. Why Look at This in Depth? Competitive Edge Cost Effectiveness.
In order to understand anything, you must not try to understand everything Aristotle.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
- Overall Equipment Effectiveness -
Productive Maintenance
WHAT IS TPM. W H A T I S TPM ? A well defined methodology to optimize resources & improve performance A culture change - “never be satisfied” Team-work.
Equipment Productivity By T.A. Khan January 2008.
Total Productive Maintenance
TOTAL PRODUCTIVE MAINTENANCE
ABB Reliability Fingerprint
Total Productive Maintenance Chit Khin TEC Introduction Good maintenance is fundamental to productive maintenance. TPM keep plant and equipment.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Total Productive Maintenance (TPM)
Production Capacity & Efficiency
Case Study _ Smart Art Team Type: Cross FunctionalTeam Size: 6 members Project Meetings: 12 Primary Metric: Specific customer complaint on average every.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Page. 1 Partners for Creative Solutions, Inc. 36 Deerfield Rd, Shrewsbury, MA Total Productive Maintenance.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
Overall Equipment Effectiveness
LEAN system.
JIT and Lean Operations
Profile Solutions Ltd. In Partnership with it’s Clients Overall Equipment Effectiveness OEE December 8th 2003.
CHALLENGES IN MAINTENANCE FUNCTIONS
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Lean Production (MUDA)
Single Minute Exchange of Die OR Quick Changeover
Managing Processes and Capabilities CHAPTER THREE.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
Presentation on Preventive Maintenance
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Total Productive Maintenance (TPM)
“Without the Cost of Waste …”
Factory Pulse – A Virtual Supervisor Logix Automation Systems Pvt Ltd, Chandigarh Mail:
Maintenance and Reliability Decisions MGMT3057 © 2011 Pearson Education.
Multi-company Project Management applied to Manufacturing Improvement
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Chap 4 - Facility Layout: Manufacturing and Services.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
TPM and Manufacturing Agility
Maintenance Management [14]
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Charles Brassard, P. Eng., M.B.A. President of Laubrass Inc. Measuring Effective Work Performance MUWG Workshop MAXIMO Utility Working Group.
Why Measure?. What Would You Do First? What Would You Do First?
Improving Preventive Maintenance of Packaging Process Equipment in a Pharmaceutical Industry Final Presentation By: Anabel Rodriguez.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Reactive to Proactive Maintenance through LEAN. What is Reactive, Proactive and Lean?
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
CECE FICCI Quality Costs & Profit Chapter no.2 CECE FICCI Many people think that quality costs money and adversely effects profits. But these costs are.
IENG 451 / 452 Stability: Total Productive Maintenance
TOTAL Productive MAINTENANCE
Training Module OEE 1.
Dr. S. Poornachandra Dean EIE & BME SNS College of Technology
Total Productive Maintenance and Quick Changeover
Total Productive Maintenance © Imants
Service for increased productivity
TPM Definitions Goals and Benefits Components GEOP 4316.
Service for increased productivity
4/29/2019 Overall Equipment Effectiveness (OEE) “Strategic Management is an exciting process that allows an organization to be proactive rather than.
OVERALL EQUIPMENT EFFECTIVENESS (O E E)
Operations Management
5/10/2019 Overall Equipment Effectiveness (OEE) “Strategic Management is an exciting process that allows an organization to be proactive rather than.
LEAN Principles Total Productive Maintenance (TPM)
Presentation transcript:

Overall Equipment Effectiveness (OEE) 01-January-2014 Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Overall Equipment Effectiveness (OEE) Elements of OEE OEE OEE is the way to Measure Effectiveness How to increase OEE ? Prime Cause of Production Loss OEE Calculation Fundamental Concept of plant Effectiveness Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Overall Equipment Effectiveness (OEE) Overall equipment effectiveness (OEE) is a hierarchy of metrics to evaluate how effectively a manufacturing operation is utilized. In an ideal factory, equipment would operate 100 percent of the time at 100 percent capacity, with an output of 100 percent good quality. The difference between the ideal and the actual situation is due to losses. Calculating the overall equipment effectiveness (OEE) rate is a crucial element of any serious commitment to reduce equipment- and process-related wastes. Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Elements Of OEE Inconsistent Timings, Insufficient Skills. Poor Planning & Scheduling, Different methods, Poor Tooling, Poor start up controls, Missing Parts, Insufficient support, Excessive start-up adjustment Set-up Breakdown Availability losses Performance losses Quality losses Lack of Maintenance, Low Operator Interest, Not knowing of problems, Poor Training, Design Problems, Inferior Material Minor Stoppages Speed losses Material not Available, Change over at start/end, Jams/misfeeds/ overloads, Operator Error, Operator Absence Overall Equipment Effectiveness Unclear Design Specs., Poor Maintenance History, Incorrect Settings, Poor Training, Speed Deliberately Reduced, Inconsistent Material Start-up losses In process losses Poor Product Changeover, Inconsistent Materials, No start-up check lists, Waiting for Temp. Pressures, Minor adjustments Environmental Conditions, inconsistent Materials, Process not followed, Poor Calibration, Gauges not calibrated properly etc. Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

OEE is the way to Measure Effectiveness OEE is the way to measure how effectively Machine / Equipment hours are used. Total time e.g. 480 min. (1 shift) OEE goes down due to following Losses Planned Downtime - breaks, planned maintenance, training Available time - breakdowns, repairs - changeover - adjustment - start up Running time Downtime Productive time Performance Losses - machine speed - short stoppages - lower yield Effective time - scrap - reject - rework Quality Losses Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Prime Cause of Production Loss A production line seldom operates at optimum speed. A myriad of reasons or Negative Performance Impacts, mostly in combination, cause losses in productivity and therefore loss of money. These include: Line Saturation There is no place for more output from the machine. For example, a filling machine of a bottling line is running at its max. speed. Equipment Failure Machines break down, wear out, are not used properly and so on. All ends up in lost production time. Product changes During the change over from one product to another the machine settings must be changed, breakdown may occur and speed must be reduced. Short Stops For example, a bottle falls down in a bottling machine and the operator picks it up. These short but frequent events can be the reason for major time loss. Operator Inefficiency The operators like to have it nice and easy. They run with lower speed in order to guarantee smooth operation. Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Prime Cause of Production Loss External reasons Sometimes, the production runs out of orders and the machines have to shut down. Or there can be a failure in the electrical power network far away from the factory. Product Type Some products are more difficult to make. There are more breakdowns and quality problems. Speed Losses For one reason or another, the speed of the machine is not optimum. In order to save costs, someone has purchased cheap but poor quality raw material. Quality Although the machine is running, the products are not good enough for the customers. These are the most expensive kinds of losses. Missing Material The raw material storage is empty and machines can not produce any more. Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Overall Equipment Effectiveness Calculation Available time - Downtime OEE (in %) = Running Efficiency = Availability 420 min - 80 min factor 81% 420 min X Running time - Performance loss Productive Performance= Running time 340 min – 70 min = factor 79.4% 340 min X Productive time - Quality loss time Quality = Productive time 270 min - 20 min = factor 92.6% 270 min Overall Equipment Effectiveness = 59.6% Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

How to Improve OEE ? Data collection is the most important action to increase OEE Collect data for all downtimes and losses on the machine Data analysis and visible measure Make improvements visible and implement Analysis 5 10 15 20 25 30 35 Repair Changeover Tool change Scrap Minor Stopp. 33 26 16 7 3 Repairs Autonomous Mainten. Change over, Adjustm. Preventive Maintenance Tool change Changeover reduction Minor stoppages Standardize tooling Scrap, rework J F M A S O N D OEE Trend Target 2003 Improved machine reliability Standardisation Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

Fundamental Concept of Plant Effectiveness 16 Kinds of loss 8 availability losses 5 productivity losses 3 production/ cost losses – not part of OEE - Machine Failure Management losses Loss of energy Set up & adjustments Motion Die, Jig and tool losses Tool changes Line organization Yield losses Start-up losses Logistics Minor stoppages Adjustments Speed Losses Defects and Rework Shutdown Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in

For more information on OEE or our other services Thank You For more information on OEE or our other services Logix Automation Systems Pvt. Ltd. Ph. +91-98140-35599; +91-92167-36975 Email : info@logixind.com; info@factorypulse.in Website : www.logixind.com ; www.factorypulse.in Factory Pulse Logix Automation Systems Pvt. Ltd. www.logixind.com; www.factorypulse.in