Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.

Slides:



Advertisements
Similar presentations
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Advertisements

1 Capacity mechanisms - IFIEC position June 12 th 2012.
Completing the EU internal energy market IFIEC, 22 November 2011
Baltic Energy Market Interconnection Plan (BEMIP)
Progress with coupling FUI and CWE region
Regulating New Interconnector Investment Emmanouela Angelidaki Ofgem 16 th June 2010.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
A 2030 framework for climate and energy policies Energy.
Electricity Interconnectors in GB
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
A regulatory framework for gas quality treatment facilities: recap and update.
Olje- og energidepartementetwww.oed.dep.no The energy sector and policy challanges in Europe. Viewpoints from Norway Johan Vetlesen Deputy Director General.
Completing the EU internal energy market
1 A Review of Potential Gains from Reforms ECRA Workshop 6 November 2006 Dr Brian Wharmby Independent Consultant, former Technical Director of Ofgem
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Balancing regulation and liberalisation in electricity markets David Newbery IAEE European Conference Vienna 9 September 2009
EU Energy Strategy
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
|Date faculty of law groningen centre of energy law 1 Security of Supply – EU Perspective and Legal Framework First EU-Russia Energy Law Conference,30.
Outline of NorthConnect Interconnector Project London – 3 rd July Sam Peacock, Head of UK and EU Public Affairs, SSE.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
1 1 CURRENT ENERGY POLICY CHALLENGES. THE 2030 ENERGY AND CLIMATE FRAMEWORK DG Energy, European Commission.
Energy Tom Howes DG Energy European Commission EU energy policy update.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Chryssa Argyriou Directorate B – Security of supply, Energy markets & Networks Unit B2 Electricity and Gas Sofia, Energy Day, 18 June 2010 Energy Infrastructure.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Information and communicationDirectorate-General for Energy and Transport European Commission Security of Electricity Supply in the EU Stefan Gewaltig.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Developing a cap and floor regime for the GB-Belgium Interconnector:
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
Presentation to Oireachtas Committee on Communications, Marine and Natural Resources by Harry McCracken Group MD Viridian Power & Energy David de Casseres.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Climate Action Meeting the EU’s Kyoto commitments & Avoiding a gap after 2012 Doha, 27 November 2012 Paolo CARIDI Policy Coordinator DG Climate Action.
Location, location, location FSR Executive Seminar Which network for which market design? Martin Crouch June 2014.
BritNed Investing in interconnection capacity Damian Bach France-UK-Ireland Stakeholder Group meeting 4 th July 2008, Sellindge, Kent.
The Energy Package:– The New Regulatory Framework for Europe International Energy Conference, 12 March 2008 David Halldearn Senior Advisor European Affairs.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Energy Community Secretariat Committee on Industry, Research and Energy, European Parliament Energy Community Activities and Outlook for the Future Brussels,
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Dutch presidency agenda on ensuring industrial competitiveness Erik Janssen, Ministry of Economic Affairs The Netherlands.
Knud Pedersen Deputy Director General Danish Energy Authority Ministry of Transport and Energy Renewables and Energy Security in Liberalised Electricity.
© OECD/IEA Do we have the technology to secure energy supply and CO 2 neutrality? Insights from Energy Technology Perspectives 2010 Copenhagen,
Challenges for Natural Gas in the Context of the Energy Union
Presentation at REEEP Regulatory Forum, 28 September 2004
IAAE International Conference Singapore June 18-21, 2017
CRE Public Consultation on new exempt interconnectors
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
International Conference
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Energy 2020: A Strategy for competitive, sustainable and secure energy
Baltic Energy Market Interconnection Plan (BEMIP)
Agriculture’s contribution to a carbon neutral Europe
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012

2 Agenda Ofgem’s role How much interconnection? Regulatory framework Is interconnection a good thing?

3 Average total import capacity relative to installed generation capacity by percentage, 2004 (Source, DG Competition Report on Energy Sector Inquiry, 2007) Interconnection from Great Britain: the context 2012 figure: 4.8%

4 Policy context – an electrical island Existing Construction Planned/ possible But less so in future

5 Energy Infrastructure Package: Interconnection capacity to support 2020 RES targets UK now = 3.5GW EIP proposal = 6.6GW (Source: Imperial College & KEMA, study for EIP communication, 2010) 2020

6 Source: ECF – Roadmap to 2050 ( UK + ROI 2010 = 2 GW ECF pathways = 21GW ECF 2050 Pathways: Interconnection capacity to support 80% RES by

7 Agenda Ofgem’s role How much interconnection? Regulatory framework Is interconnection a good thing?

8 Potential for commercially viable interconnection –But pure merchant financing of projects less viable … –We want to see timely development of new infrastructure to contribute to the delivery of internal energy market Financing gap- greater need for 3 rd party investors? Need for a common / coordinated approach to regulation of shared assets Challenges with merchant-exempt regime: –Regulated “risk” of exemptions, which are seen as the exception not the rule –European model, national TSOs deliver interconnector investment Drivers for change  Need to develop a regulatory regime to remove regulatory barriers and facilitate investment

9 The regulatory framework will take into account the commercial viability of a project as well as considering the wider benefits efficient levels of interconnection can offer to consumers for example: security of supply, integration of renewable energy sources, competition and market integration across Europe, Consumers should be protected from the cost implications of excessive returns or market power that might accrue to interconnector owners, Developers should be able to earn returns that are commensurate with the levels of risk they are exposed to under the regulatory framework, Regulatory treatment of developers should be coordinated between NRAs at either end of the shared asset and (For GB and new interconnector developments) Regulatory treatment should allow third party developers and should be impartial and unbiased between TSOs and non-TSO developers, existing and future developers Regime principles

10 Inetrconnectors derive their revenues (congestion rents) from auctioning capacity at different time horizons Recoup returns within bounds of pre- set cap and floor Returns over cap – paid back to consumers Returns fall below floor – triggers payment from consumers Allows revenue regulation, protects consumers from market power Maintains element of market valuation of interconnection Within the regulated regime favoured by Third Package The Cap and Floor approach

11 Agenda Ofgem’s role How much interconnection? Regulatory framework Is interconnection a good thing?

12 Two real examples that demonstrate the benefits of interconnection Example 2: National Grid can call on interconnectors to assist in emergency situations The Moyle Interconnector was offline between June 2011 and Feb 2012 This resulted in an additional £20 million constraint costs for National Grid in Scotland (excess wind power in Scotland could not be exported to N Ireland) Example 1: Interconnectors can reduce the cost for National Grid to manage the system The IFA Interconnector provided 30% of the emergency assistance used by National Grid to meet a 3.5 GW shortfall in Feb 2012 – this helped avoiding problems in GB X Moyle IFA

13 48 Hypothetical concerns

Hypothetical concerns...

15 Benefits of interconnectors are likely to be higher if... 1.Interconnected countries have different generation and demand patterns – asymmetric shocks + access to diversity of generation sources and reserve 2.The GB price respects and reflects the physical constraints of the GB transmission system as well as scarcity – our price needs to signal when we need more energy and where we need it 3.Good cooperation between neighbouring TSOs and full implementation of internal market rules

16