1 MIS FOR CUSTOMER SUPPORT, ECC & ICA – WK OF 2 nd Mar 2015.

Slides:



Advertisements
Similar presentations
Send your enquiries to Globe Local Electronics Globe Local Electronics provide a high level of service for Electronic Component.
Advertisements

1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.
1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/12 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/12 ( R.
July 17, 2009, Atlas Copco Group Q2 Results July 17, 2009.
GREENSSOFT. Profile Greensoft is a software company based at Kochi, Kerala, India. Being in the field since 2001, it has a group of young developers,
1 Cash Budget   Used to determine monthly needs and surpluses for cash during the planning period   Examines timing of cash inflows and outflows i.e.
Advanced Forecasting & Procurement for Microsoft Dynamics NAV Presented to ABC Annual Conference 2011 May 12, 2011.
Johnson Street Bridge Replacement Project Technical Briefing April 8, 2015.
1 SPE - MIS. Key Issues 2 Sl.No PART NUMBER PART NAME DATE REJECETED S.NAMEQUALITY CONCERNRCAICAPCAStatus 1 CP8G1U 11075CA Frame6/Apr/15Necco ToolsDull.
Week LINE STOPPAGES 3 LINE STOPPAGES ISSUE AND CORRECTIVE ACTION S.NoModelPartReasonActionResp 1 StartersDV6 Frame Assy Due to Stock variation.
MIS SPE- New Model Team. Focus Points PPAP – 2015 (Wk6) Panther Frame - Necco AM31 Gasket Indica Panther Cap AM31 OP Shaft Jatco Arm shaft Wk 6 PPAP.
Days Of Supply Protects the plant from variation between forecasted and actual usage between vessels, and vessel delays.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Auditing OEM Customer Specific Requirements under ISO/TS 16949
Key Performance Indicators - KPI’s
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April/May 2012.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – January 2013.
NCR Confidential NCR Supplier Quality Webcast June Bob Ciminera - Vice President Strategic Sourcing Robert Mele - Vice President, Quality and Continuous.
Copyright © 2011 SYSPRO All rights reserved. Inventory Optimization User Group 17 th August 2011.
Confidential S&OP March th March Confidential.
OMSAN LOJİSTİK. Vendor Managed Inventory (VMI) Inventory Planning and Management Latin America Logistics Center Logistics Management Series -
Smart solutions for comfort and safety UL/CSA approval of small motors.
Master Scheduling Chapter 3.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
UW Procurement Services Updates Monthly Research Administrator’s Presentation May 8,
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
1 Dumex Malaysia Workshop 1 Finished Goods Inventory at Nilai FGS July 9, 2008.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Project Spear 8/6/2013.
MRP Model.
The information contained in this document is highly confidential and privileged. No part of this document may be copied or circulated without express.
1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/11 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/11 ( R.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014(As on ) RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
File 5 Duplex Production Part 5 :. Now, offer to Quality Department.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2012.
Atlas Copco Group Q1 Results April 29, Page 2 April 29, 2002www.atlascopco-group.com Contents  Q1 Highlights and Strategic Moves  Market Development.
Raaj Unocal Standard Operating Procedures Order to cash
1 1 Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – MIZORAM On
Atlas Copco Group Q4 Results February 2, Contents  2003 Summary  Q4 Business Highlights  Market Development  Business Areas  Financials 
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
Dynamic Lot Size Models
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
VERSHIRE COMPANY Rochak Acharya (2) Swati Kamilla (21)
Cartrack Management MMD Meeting 27th January 2012.
Atlas Copco Group Q1 Results April 27, 2004 April 27, 2004.
ACCOUNTING FOR MERCHANDISE INVENTORY
SCHEDULE Nov 1st - Assembly Table Complete
SHIKHAR Q
SmartMeterTM Steering Committee Update – September 2012
Mid Day Meal Scheme MDM-PAB Meeting – Meghalaya on
SmartMeterTM Steering Committee Update – March 2013
© 2009 Cengage Learning. All rights reserved.
Mid Day Meal Scheme MDM-PAB Meeting – ARUNACHAL PRADESH On
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
15/02/2019 MRSO Update Aileen O Connor 15/02/2019.
SmartMeterTM Steering Committee Update – July 2012
Atlas Copco Group Q2 Results July 17, 2009.
SmartMeterTM Steering Committee Update – February 2013
California Housing Market Update
SmartMeterTM Steering Committee Update – November 2012
Presentation transcript:

1 MIS FOR CUSTOMER SUPPORT, ECC & ICA – WK OF 2 nd Mar 2015

2 Customer Support, ECC & ICA Customer Coverage Status - OEM2-Mar-14 Region Trans it WHS Norms for Domestic11 Norms for Europe63 Norms for China73 STARTERS Norms for North America 73 #WHSPART NUMBERMODELCUSTOMER EUROPEAN/N A/ AP WHS STOCKS TRANSIT STOCKS TOTAL Average Weekly Volume CUSTOME R COVERAG E - WKS Shortfall Quantity to meet norms Comments 1A&S3M5T 11000CFDV6 Saarlouis/Vale n A&S6G9N 11000ABI4Ford OEMs A&S7G9N 11000ACSIGMAFord OEMs A&S8G AAASTON MARTINAston Martin A&SAV6N 11000CASIGMA GTDIFord OEMs A&SCV6T 11000DBV408Ford OEMs A&SF1FT 11000EBF1FTFord OEMs A&SF1FT 11000MAF1FTFord OEMs A&SDG9T 11000AA Ford OEMs SML SIGMA GTDIVolvo Obsolete on 30th Mar'15, Service will continue. 13SML ESMVolvo SML I5PVolvo SML SIGMA SIDVolvo Obsolete on 6th April'15, Service will continue. 16SML DV6 - SSVolvo (57)Obsolete on 6th April'15 17SML I5P SSVolvo nos of return to Comstar due obsolence 18CHINA I5P SSVolvo Volume drop up to 50 %, Awaiting confirmation from customer nos return back to Comstar due to foreign materials inside the container.

3 Customer Support, ECC & ICA Customer Coverage Status - OEM2-Mar-14 Region Tran sit WHS Norms for Domestic11 Norms for Europe63 Norms for China73 STARTERS Norms for North America 73 #WHSPART NUMBERMODELCUSTOMER EUROPEAN/ NA/ AP WHS STOCKS TRANSIT STOCKS TOTAL Average Weekly Volume CUSTOME R COVERAG E - WKS Shortfall Quantity to meet norms Comments Domestic Customers 19TVS-P X1TML / FIAT TVS-P X1 COMMTML / FIAT Suddenly TML Increased their volume from 1536 Nos to 4300 Pcs. Nearly 300% increased considering last 6 month average of 1500 Pcs 21TVS-P FIREFIAT Discussion is going on with customer to cater parts to them. This is because of last four months they didn't pulled as per their schedule 22CHETAK SUPER ACE Supplied as per Feb 2015 Schedule 23AXPRESS NANOTML (336) 504Pcs are under TML plant as starters. 24TVS-HF ALP15Ashok Leyland D3 - 8G1T11000BA 25BAY8G1T 11000BAD3Ford OEMs BAYAV6N 11000CASIGMA GTDIFord OEMs BAYCP7C3U 11005AAARMATURE COMSTAR NA (1521) 28BAYAC3U 11390AASOLENOID COMSTAR NA

4 CodeRegionNov-14Dec’14Jan’15 Feb’15 to date Production AHVFAAsia-Pacific AHVFCEurope AHVFGNorth America – Bay100 AHVFHComstar LLC USA Service AHVFCEurope AHVFGNorth America – Bay 57 dispute rejected Dispute Rejected 85 Dispute Rejected 100 AHVFHComstar LLC USA GUR4AComstar LLC USA Refresh Date: 2 nd Mar 2015 Data period: 23 rd Feb to 27 th Feb SUPER-G Rating Summary Nov’14, Dec’14, Jan’15 & Feb’15: Customer Support, ECC & ICA

 Customer critical parts for next two weeks  Nil  Critical parts to be produced this week at Comstar to avoid line stoppage at Customer o Jatco, 98AB AC & 835X AC – After Market ( Armature Shaft Constrain) o 3S6T AD After Market (B+ Insulator Constrain) o Nano, F Series Armature, DV6SS – 125starters  Critical Containers for next two weeks o EMCU , TGHU  FCSD long pending parts to be produced this week to avoid lost delivery performance  Nil  Starters Produced against the production plan in % Customer Support, ECC & ICA Week 51 (15th Dec'14 Week) Week 52 (22nd Dec'14 Week) Week 2 (05th Jan'15 Week) Week 4 (19th Jan'15 Week) Week 5 (26th Jan'15 Week) Week 6 (2nd Feb'15 Week) Week 7 (09th Feb'15 Week) Week 8 (16th Feb'15 Week) Week 9 (23rd Feb'15 Week) Week 10 (02nd Mar'15 Week) Production Plan Qty Produced against the Plan Difference 17(861)25244(782)(134)395(653)197 Achieved in %

6  EXT - WHS sales booking status SML Whs – Sales booked up to 2 nd Mar’15 A/S Whs – Sales booked up to 2 nd Mar’15 BAY Whs – Sales booked up to 2 nd Mar’15 China Whs – Sales booked up to 2 nd Mar’15  Customer Reconciliation Status BAY Whs – Completed up to 8 th Feb’15 SML Whs & A/S Whs - Completed up to 8 th Feb’15 China Whs – Completed up to 8 th Feb’15 Comstar LLC (NA) - Completed up to 8 th Feb’15 Direct Customers – to be Completed for Feb’15 Customer Support, ECC & ICA

7  Aftermarket Budget Volume Vs Actual

8 Customer Support, ECC & ICA  Aftermarket pending orders - Approximate value is Rs. 1.9Cr Item NumberOEM RefProductTotalValueRemarks AB ACStr Armature shaft Constrain X ACStr Armature shaft Constrain S7T DCStr Armature shaft Constrain G9N ECStr Alert to be raised for Flange YC1U AFStr Armature shaft Constrain S6T FCAlt Slip ring Constrain S6T ADAlt B+ Insulator Constrain S7T CFAlt Slip ring Constrain S7T BEAlt Slip ring Constrain YC1U EAAlt Slip ring Constrain T1U BEAlt Slip ring Constrain S6T ACAlt B+ Insulator Constrain Grand Total

9 Customer Support, ECC & ICA  Aftermarket pending orders – Aging CustomerItem Number Quantity Open Due DateAge ARTEC /12/ BOSCH /28/ BOSCH /28/ CASCO /31/ CASCO /31/ CASCO /31/ CASCO /31/ AEE /2/ AEE /2/ AEE /2/ AEE /2/ PSHCV /2/ PSHCV /2/ PSHCV /2/ PSHCV /2/ PSHCV /2/ BIGOT /9/ HCA /9/ ARTEC /16/ ARTEC /16/ HCA /16/ HCA /16/ PSHCV /16/ VALEO /16/ CASCO /28/ CASCO /28/ CASCO /28/ CASCO /28/ CASCO /28/ CASCO /28/2015 5

10  AFTER MARKET PARTS SALES HIGH LIGHTS Sales Value for week 9 (23 rd Feb to 1 st Mar’15) – INR 4,267,387 Sales Value for the Month to Date (Feb’15) - INR 18,386,547 Sales Value Year to date (YTD) – INR 22,882,448 ( INR 22 Million)  Aftermarket Orders availability Status Product Open Orders as on 23rd Feb'15 Fresh Orders received Quantity produced last week Quantity Shipped last week Additional Qty on Comstar Total Balance Open Quantity as on 02nd Mar’15 Min. Required by this week Starters Alternators Total

EI - INVENTORY REDUCTION TREND Oct’14 – 17.2Lakhs. Nov’14 – 9.7Lakhs Actual. Dec’14–12.7Lakhs Actual. Jan’15 – 24Lakhs Actual Feb’ Lakhs planned and 10.48Lakhs Achieved so far. Oct’14 – 17.2Lakhs. Nov’14 – 9.7Lakhs Actual. Dec’14–12.7Lakhs Actual. Jan’15 – 24Lakhs Actual Feb’ Lakhs planned and 10.48Lakhs Achieved so far.

12 Customer Support, ECC & ICA  Total Pending – 93.2Lakhs  FCSD Sale Planned in Feb’15 & Mar’15 – 17.4Lakhs  To Bring Back to Comstar – 33.5Lakhs ( In Transit to Comstar)  – 2114pcs (29.6Lakhs)  6G9N 11000EC – 63pcs (1.0Lakhs)  BG9T 11000AA – 125Pcs (1.5Lakhs)  – 123pcs (1.4Lakhs)  Total Pending stock as on 1 St Apr’15 – 42.4Lakhs  Awaiting Ford NA FCSD order – 5.70Lakhs – Ford Buyer Confirmed 100pcs per month pull from Dec’15  BB5Z 11002C – 488pcs (5.70Lakhs)  Remaining – 36.7 Lakhs ( 3.5months FCSD Sales value) retained for future order

CYCLE COUNT ACTUAL – WEEK 09  Starter Housing \ Alternator Housing,Pulley, Regulator,Stator line Classification Parts counted Week -09 FEB-15 Total PlanFEB-15 So far Class 'A' Class 'B'74452 Class 'C' Total Variance details: Gross Variance 93,105 Net Variance 19,449  Starter Housing Variance Booked.  All Alternator Parts Variance booked by this week.

Cycle Count Variance –MIS WEEK - 09 Sl #Item NumberDescription Item type Class Cost ACVA '14 Variance Last Audit sys stock Variance Qty Variance Value 12XS6U 10336AA StatorR ASY - ALT PPC (48) 3,395 (43) (9,095) 1CPBV5U 11055AA BRSH ASY-STR MTR INS CSA119.3 (112) (14) 4,635 (67) (7,996) 21VP2C1U 10A352AA HB ASY-ALT PLY PPA (2) - 1,209 (3) (6,287) 16VP3S7U 10505AA RegulatorLATOR - PCM PPB (10) (5,818) 13VP3S7U 10A303AA BRG - ALT FRT PPC (52) 1,918 (28) (1,979) 201S7U 10336AA StatorR ASY - ALT PPB (34) 2,239 (5) (1,024) 14XS6U 10A352A1A HB - ALT PLY(MACHINED) PPC (46) 820 (16) (918) 9F75U 11A192AA CONNECTING ROD - STR ASY PPB1.5 2, ,300 1,134 1,758 8VP6G9U 11A183AA CONT-STR MTR Solenoid PPB2.0 3, ,056 1,015 2,030 7VP1S7U 11131AA HSG-STR MTR MTR DRIVE EN PPA136.7 (24) - 2, ,051 56VPXS6U 10A351CA HOUSING - ALT FRONT W.O PPA (68) 1, ,176 55VP3S7U 10316BA REINF RR FLR BMPR ASA , ,640 57R1425 M2L46ANAT ENAMELLED COPPER WIRE RMA516.9 (73) (46) 2, ,778

15  Engineering Change Control Status ECC TOTAL OPEN CHANGES DEPT WISE Dept No. Pending activities TOTAL OPEN CHANGES 87 Changes Implemented 119 Changed on Hold 1 Changes Closed/Dropped 86 PD 25 Purchase 11 SPE 43 MFG 6 Quality/IQ 4 CBG 1 MPL 6 ECC 0

16  Pending CMCs Stratification ECC DESCRIPTIONNO OF CMCs Number of CMCs open since Number of CMCs open since Number of CMCs open since Number of CMCs open since & CMCs- SUPPORT REQUIRED CMC Number Requesto r Requestor Dept CMC Raised date Change DescriptionPart number Current supplier proposed supplier Current StatusDept SUPPORT REQUIRED CMC00384garunkumPurchase23-Feb-12 Additional sourcing of F7RU 11448CA Bush to SSPL (Panther, V227, ESM) F7RU 11448CA (F7RU 11448CA1) GKN IndiaSSPLFCR StatusMFG FCR feedback from Mfg. Sudar-MFg CMC00407rsaravanPurchase11-Apr-12 Alternate source for VP6G9U 11051AA End plate to JAEIL Metals VP6G9U 11051AA to AB Sunbeam/ Gencor Jaeil Gencor die modification FCR Rejected PPAP lot & Alert for available lot SPE PPAP Lot & Alert for available 5000nos- Durai-SPE. CMC00414rsathiesPurchase26-Apr-12 Fully finished VP6G9U 11010CA Armature shaft from SRIMUKHA VP6G9U 11010CA (new part no: CP6G9U 11010EA) TKP + Inhouse Srimukha FCR Rejected RE-PPAP inspection rejected MFG trial, SCR & PPAP SPE Mfg trial, SCR & PPAP Durai-SPE. CMC00441kmariappSPE18-Oct-12 Drill depth added CPBV5U 11131AA-Gencor (also SCR00798) CPBV5U 11131AA Gencor SPE/PD to clarifyIQ/SPE Thilawar-SPE CMC00534ranandPurchase30-Oct-13 Additional sourcing for VP6G9U 11390AA Solenoid assy Huanfang automobile(China) VP6G9U 11390AAIn_house Huanfang automobile(China) Re-PPAPSPE Durai-SPE CMC00611rharishPD1-Nov-13 Fiber band instead of 1C3U 11A163AB steel band in ESM & F series models 1C3U 11A163AB(CPBV5 U 11A163AA) NeccoAngu PV Testing & Cust approval PD Ser-FTest--Parameswari-PD ESM Build-- Meenakshi-Mfg CMC00614rharishPD1-Nov-13 Fiber band instead of F7RU 11A163AA steel band in All LXD models F7RU 11A163AA (CP6G9U 11A163AA) NeccoAngu Cust. Approval requirement for FCSD(FA Model) PD FA obsolete, FCSD approval requirement- Veera-PD.

17 ECC BUILD STATUS FOR THIS WEEK S.NoDESCRIPTION NUMBER OF CHILD PARTS IN THIS BUILD MODEL NO OF MOTORS REQUIRED BUILD REQUEST DATE BUILD COMPLETION DATE BUILD AGING (in days) REMARKS 1 Chunk-23A (CPCV3S 11000AA) Sigma SID Feb-15TBD7Pending Chunk-23B18G1T 11000BA2 Chunk-23C (CPBV5U 11000AA) 20 Chunk-23D56G9N 11000FA2 2 YS4U 11A209AB INITIAL SUBMISSION NEW CAVITY #3,4 FROM HTP 1AV6N 11000CA924-Feb-1527-Feb-154Completed

18 ECC TEST STATUS IN PROGRESS DESCRIPTIONMODEL NO OF MOTORS REQUIRED BUILD COMPLETION DATE TEST START DATE TEST COMPLETION TARGET TEST AGING (in days) TEST AGING (in Months) Status INITIALREVISED CHUNK - 22A6G9N 11000FA294-Nov-145-Nov-148-Jan-1516-Mar Testing in progress CHUNK - 22B DV6SS 244-Nov-145-Nov-148-Jan-1516-Mar Testing in progress CHUNK - 22C6G9N 11000AB289-Oct-1410-Oct-1413-Dec-1416-Mar Testing in progress Retainer New tool & China Drive new Grease 8G1T 11000BA1310-Nov-1411-Nov-1414-Jan-15TBD491.6 Target exceeded, need disposition F81U 11A171AA Seal form TEKLIGHT & 3mm Tube frame 8G AA211-Dec-1412-Dec-1414-Feb-15TBD180.6 Testing in progress CHUNK-21B Additional test Feb-1511-Feb-1520-Feb-15TBD190.6 Testing in progress CHUNK-21B Additional test & CPAT2C 11390CA Feb-1521-Feb7-Mar-15TBD00.0 Testing in progress YS4U 11A209AB INITIAL SUBMISSION NEW CAVITY #3,4 FROM HTP AV6N 11000CA927-Feb-152-Mar-1512-Mar-15TBD00 Testing in progress

19 THANK YOU