AEF 9-10 Rule Sets AEFC/AEPS.

Slides:



Advertisements
Similar presentations
FY14 Force Management Program Status and Way Ahead
Advertisements

Deployed Processing Discrepancy Reporting Tool (DPDRT)
How to Load a Replacement Request
USAFCENT/A1 ORIENTATION
WJTSC 09-2 Aug  Key Points from Working Group meetings  Flow diagrams  Required Documentation  IMS Example  Way Ahead.
UN UNCLASSIFIED 1 DOD Participation Challenges in the National Exercise Program Issue : DOD Participation Challenges in the National Exercise Program.
MSgt Ralph Rueda HQ USAF/A5XW
Air & Space Expeditionary Force
Joint Contingency Contracting
WELCOME TO INNG EMERGENCY OPERATIONS LIAISON OFFICER OVERVIEW
Capability Cliff Notes Series PHEP Capability 15—Volunteer Management What Is It And How Will We Measure It?
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Reserve Command As of:1.
BLSDM Evaluation Training (AFI , MPFM & 07-45, AFI )
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit V: FAM Role in new AF Inspection System (AFIS) SAF/IGI Office of The Inspector General.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
 Definition  Purpose  Who it Applies to  When Determinations are Required  Types of Determinations  Responsibilities  LOD Packages Overview.
Office of Business Development Training
HQ NORAD and USNORTHCOM JETP Exercise Brief COL Matt Brady N-NC/J71 This Briefing is Classified UNCLASSIFIED.
USPACOM READINESS OF JTF CAPABLE HQ
Overview  Policy  Responsibilities  Consideration Criteria  Board Preparation  Board Appointment / Composition  Board Process  Post Board Action.
Role of Account Management at ERCOT PRR 672 Collaborative Analysis Presentation to RMS November 8, 2006 DRAFT ONLY.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
DoDI  Review of Para 3 of Encl 3 of DoDI  NEP Exercise After Action Activities  Information Flow  Decision Points.
Campaign Planning Process 29 March 2006 Step 7 – Prepare Operations Plan (OPLAN) / Operations Order (OPORD) & Assess UNCLASSIFIED.
1 Collaborative Provision and External Examining Nicola Clarke Centre for Academic Standards and Quality Enhancement (CASQE)
PROJECT AND PORTFOLIO MANAGEMENT AT UNM IT David McGuire, Associate Director, IT Project & Service Mgmt Tech Days, 4 June 2015, 2:30-3:30.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
PERS-453 MANNING CONTROL AUTHORITY BUREAU (MCAB)
UNCLASSIFIED 1 Partnership Opportunities Catalog United States Joint Forces Command Joint Warfighting Center Joint Warfighting Center Partnership Opportunities.
Welcome to WebEOC Resource Manager Training 1 Don Wilson Logistics Chief cell
HQ USEUCOM Exercise Austere Challenge 09 and the Interagency Management System (IMS) Tom Holston, EUCOM CIEG DSN: Comm:
“Total Army, Total Victory” For Official Use Only - Unclassified.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
Homeland Security Grant Program Guidance for Training and Exercise Presented by Rudolph Ferguson, Sr.
Prepare and Issue the Coalition / Combined Task Force OPORD Multinational Planning Augmentation Team (MPAT) Purpose References Discuss the process of preparing.
Brig Gen Henry Taylor, USAF The Joint Staff Vice Director for Logistics (VJ4) Future Joint Logistics Initiatives Panel 19 May 2004 Future Joint Logistics.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Press Kit VI: UEI Continual Evaluation SAF/IGI Office of The Inspector General 24 June 2013 OVERALL.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
GEtServices Purchasing Units & Materials Training For Suppliers Request.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Alamo Chapter Air Force Association 2005 Membership Drive Debrief As of 12 Apr 05 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Lt Col John W.
MPE – Enabling ALL to securely SEE, DECIDE, ACT MPE - Highlights  Establish Core Implementation Working Group  Build Joining, Membership, and Exiting.
UNCLASSIFIED Crisis Action Planning 01 January 2006 CTF Operation Order UNCLASSIFIED ing.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AIR FORCE CAUCUS John Heliotis AF DepSO.
1 United States Joint Forces Command United States Joint Forces Command Joint Concept Development and Experimentation (JCD&E) Interagency and Multinational.
“Fly, Fight, Win!” Unclassified 1 Command Sponsorship Program (CSP)
Joint Staff of Georgian Armed Forces J-7 Military Education and Combat Training Department The Unified System of Doctrines in Georgian Armed Forces 2010.
MPAT SECRETARIAT Multinational Force Crisis Action Planning Overview COALITION/COMBINED TASK FORCE TRAINING.
State of Georgia Release Management Training
Operational Reviews Surviving an External Records Program Inspection March 17, 2011 Presented to the Digital Government Institute.
FRG: Communicating With Families | 1 Communicating with Families Third Edition, 2006.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters Air Force Services Agency NAF Budget Process MS TERRY CICATELLO AFSVA/SVFAA.
Civilian Casualty Institutionalization Mr. Shelby Ball Joint Staff J7 Joint Lessons Learned Division 21 May 2014 UNCLASSIFIED.
Joint Action Group for the National Wildland Fire Weather Needs Assessment 16 Mar 2007, 12:00 – 2:00 EST Cochairs: Dr. Al Riebau, Mr. Eli Jacks OFCM: USAF.
© JABEE 2015 Fundamental Concept of JABEE Evaluation and Accreditation JABEE evaluation and accreditation is to confirm the engineering educational program.
Communicating with Families. Objectives of Communicating with Families Review FRG mission and activities Provide guidance on FRG mission essential activities.
Recruit, Train, and Educate Airmen to Deliver Airpower for America ENJJPT Steering Committee Briefing Facility Projects Mr. Christopher Coppala Air Education.
PERS-453 MANNING CONTROL AUTHORITY BUREAU (MCAB)
Joint Forces Command Working Group Brief-Backs
Major Changes Additional Updates
Test Strategy, Approach and guidance
CNS Disaster Recovery Planning Project
Deployable Training Division (DTD)
Curricular Practical Training
PERS-453 MANNING CONTROL AUTHORITY BUREAU (MCAB)
School Counseling Update
PERS-453 MANNING CONTROL AUTHORITY BUREAU (MCAB)
Presentation transcript:

AEF 9-10 Rule Sets AEFC/AEPS

AEF 9-10 TIMELINE Rotation Date (Movement Window Starts NET 1 Jun 04) COMACC sends Cycle 4 AEF 9-10 certified forces message to CDRUSJFCOM 18 May 04 Book/confirm reservations with AMC’s Passenger Reservation Center 1 May 04 AF Component Commands Publish intratheater PAX reception/ onward movement plan as applicable 30 Apr 04 AFCC Validation Deadline 21 Apr 04 Execution Conference XX Apr 04 TACC/XOPC Publish Bookable AEF Contingency Missions 1 Apr 04 17 Mar 04 Component Command Level 4 Data to TACC/XOPC For Mission Purchase 23 Feb 04 AEFC Completes Rotation Tasking Flow/ Unit Notification 12 Feb 04 MAJCOMS Complete Sourcing Verification 29 Jan 04 AEFC Completes DCAPES Sourcing Nomination 13 Jan 04 Commanders Ensure ART Fully Updated//Prepare Forces to Deploy // ARC Buy Complete 24 Dec 03 Requirements Available for ARC Buy 18 Dec 03 CENTAF/USAFE/CONR/PACAF/SOUTHAF Approved ECS and Aviation Requirements in DCAPES W/CRM Codes

AEF 9-10 SOURCING PRIORITIES AEFC schedulers will source from the AEF 9-10 TPFDD Library to fill all requirements Determine if AEF 9-10 can be replaced by Cycle 5 AEF 1-2. If not, AEF 9-10 may require 135- or 179-day initial ETL - must be coordinated through the AEFC Division Chief to AEFC/CC, or designated representative – AEFC/CV, AEFC/CD, for approval* (see extension rules) When there is an incumbent in place, and, AEF 9-10 is exhausted: AEFC scheduler will forward an EETL request to extend the incumbent through the AEFC Division Chief to AEFC/CC, or designated representative for approval* (see extension rules) S:\AEP\AEPS\Cycle 4\9-10\EETL When there is not an incumbent in place, and, AEF 9-10 is exhausted: AEFC scheduler will forward an “Air Force Shortfall Request” through AEFC Division Chief to AEFC/CC, or designated representative, for approval and for AEFC CAT to forward to AFOG. S:\AEP\AEPS\Cycle 4\9-10\AF Shortfall Request.doc * see notes page The AEFC scheduler should continue to work with the AFCC FAM to determine if all requirements are still valid. Request the AFCC continue to validate requirements. If the AF FAM determines a requirement no longer needs to be filled, the AEFC Scheduler should request the AFCC FAM initiate an RCR (Requirements Change Request) to delete the requirement. The AEFC Scheduler should document the request in the “Comments” section and select “No Fill” in ECSS.

AEF 9-10 Resources Sourcing resource order (AEF 9-10) (1) ARC volunteer buys (full UTCs only) ARC complete buy NLT 13 Jan 04 AEFC Schedulers update ARC buy in ECSS and DCAPES NLT 21 Jan 04 (2) Cycle 4/AEF 9-10 TPFDD Library Enablers (must be approved by the MAJCOM FAM) and ARC residuals (additional requirements ARC agrees to fill – AEFC scheduler coordinates w/ARC AEF Cell) AEFC scheduler forwards request to AFCC FAM to use other “suitable subs” (i.e. substitute UTC that can meet MISCAP) - document request/result in ECSS AEFC scheduler forwards EETL request to extend the incumbent through AEFC Division Chief to AEFC/CC, or designated representative, for approval (6) AEFC scheduler will forward an “Air Force Shortfall request” through AEFC Division Chief to AEFC/CC, or designated representative, for approval then to AEFC CAT to forward to AFOG.

ECS SOURCING Individual Augmentee (IA) Requirements The following IA requirements take precedence over normal AEF 9-10 requirements** ISG – Iraqi Survey Group (“D” series ULNs) CPA – Coalition Provisional Authority (“D” series ULNs) CMATT – Coalition Military Advisor Training Team (“D” series ULNs) JTF7 – Joint Task Force 7 JTF-HOA – Horn of Africa (104HD) Non-IA 9-10 requirements take priority over other IA requirements Source currently filled IA requirements Do not source: 1) new staff IA requirements (JS in the non-baseline field in DCAPES 2) unfilled staff IA requirements (JS) AEFC IA Manager will notify AEFC Schedulers of new Joint IA requirements validated / approved for sourcing Contact AEFC IA Manager for further guidance if required * See notes pages for internal AEFC process ** IN follows AF guidance approved by AEFC/CC Internal AEFC IA Process 1. Upon receipt of rotational requirements, the IA Manager (Mr. Mike Miller / Mr. Kelley Bronson) will review and insure appropriate coding in DCAPES: JU – Joint Mission IA requirements: - AEFC IA Manager forwards annotated spreadsheet to AEFC Schedulers - AEFC Schedulers source as appropriate JS – Joint Staff IA requirements - AEFC Schedulers determine if JS billet is currently vacant or new - if yes, do not source (annotate “vacant” or “new” in the “comments” field on spreadsheet) - if no, source as appropriate to avoid “hostage” situation (annotate “filled” in the “ comments” field on spreadsheet) 2. AEFC IA Manager will provide annotated list to AEFC senior leadership for review.

ECS SOURCING Extension Rules AEF 9-10 REQUIRES AEFC/CC approval (AEFC/CV or AEFC/CD if designated) Extending AEF 9-10 During Initial Sourcing Effort: Compare AEF 9-10 requirements to Cycle 5 AEF 1-2 assets to determine if AEF 9-10 initial extended ETL (135 or 179 days) is required If AEF 9-10 requirements are not available in Cycle 5 AEF 1-2, EETL = 135, unless requirements are reduced (Cycle 5 AEF 3-4 replacements may need to deploy 45 days early). If AEF 9-10 requirements are not available in Cycle 5, AEF 3-4, ETL = 179 AEF 9-10 stays through Cycle 5 AEF 1-2 (May require shortfall request) Do not extend ARC Volunteers (Man-days) without permission of all concerned parties T-Codes T1 Initial ETL 135 T2 Initial ETL 179 T3 Early Report ETL 135 T5 Ext In-Place ETL 135 T6 Ext In-Place ETL 179 TA Early Report ETL 150 TC Ext In-Place ETL 150 TD Early Report ETL 165 TE Ext In-Place ETL 165 TF Initial ETL 180 TG Early Report ETL 180 TH Ext In-Place ETL 180 TJ Initial ETL 240 TM Ext In-Place ETL 240 TN Initial ETL 165 TP Initial ETL 150 ?? Ext In-Place ETL 210 VE Volunteer Extension

ECS SOURCING Extension Rules - AEF 9-10 (cont.) REQUIRES AEFC/CC approval (AEFC/CV or AEFC/CD if designated) Extending AEF 7-8: Compare AEF 9-10 assets to Cycle 5 AEF 1-2 assets to determine if AEF 7-8 extended ETL (135 or 179 days) is required If AEF 9-10 Rotation holes can be filled with Cycle 5 AEF 1-2 assets: AEF 7-8 Extended ETL = 135 (90+45) Cycle 5 AEF 1-2 will replace extended AEF 7-8 45 days early – EETL = 135 If AEF 9-10 Rotation holes cannot be filled with Cycle 5 AEF 1-2 assets: AEF 7-8 Extended ETL = 179 days Process AF shortfall request for subsequent AEF pair – Elevate to Division Chief ASAP If AF shortfall is disapproved, AEFC/CC, or designated representative, will work with deployed leadership, to determine alternative methods to meet future requirements Do not extend ARC Volunteers (Man-days) without permission of all concerned parties * see notes page Reference Maj Teresa Forest, AF/DPPPC, the SECAF waiver for TDYs in excess of 180 is still in effect as of 6 Nov 03. Maj Melissa Flattery, AF/DPPPA is the AF POC. T-Codes T1 Initial ETL 135 T2 Initial ETL 179 T3 Early Report ETL 135 T5 Ext In-Place ETL 135 T6 Ext In-Place ETL 179 TA Early Report ETL 150 TC Ext In-Place ETL 150 TD Early Report ETL 165 TE Ext In-Place ETL 165 TF Initial ETL 180 TG Early Report ETL 180 TH Ext In-Place ETL 180 TJ Initial ETL 240 TM Ext In-Place ETL 240 TN Initial ETL 165 TP Initial ETL 150 ?? Ext In-Place ETL 210 VE Volunteer Extension

ECS SOURCING Other Considerations If ARC shortfalls any ARC buys, report changes to the Requirements Branch to update “A” rotation – before sourcing to another MAJCOM (Forward to AEPX Branch box for dissemination to the applicable AOR OPR) Continue to monitor ALL crisis PIDs in ECSS and S/T: Crisis folders, for new requirements, to ensure timely nomination, and to respond to shortfalls Source DWS, DWX, DXS, DXX not to exceed total simultaneous DW (see: https://www.xo.hq.af.mil/xox/xoxw/hot_stuff.htm and AFI 10-400 para 7.21 http://www.e-publishing.af.mil/pubfiles/af/10/afi10-400/afi10-400.pdf for coding/ posturing/sourcing information) Nominated units must meet capability specified in TPFDD Only AFCC can add, delete, change, or substitute requirements Tasked units can request waivers from deployed commanders (e.g. Line remarks, rank substitutions) IAW AFI 10-400, para 5.10.3 Sourcing of one UTC to multiple FOLs is permitted No early rotations authorized! Coordination is key to success! “Longer” tours remain, specified in TPFDD & DRMD – as previously approved by CSAF Limited to joint positions, or those requiring continuity, host nation liaison, or critical to security

ECS SOURCING Other Considerations (cont) Review current procedures for using and processing ECSS, ART and DCAPES data Ensure you have needed reference material* Base alignment template, sourcing rule-sets, PAS and MAC codes, MANFOR, GLOC table, “T” and “N” codes, line remarks table, UICs, T-PAS ARC UTCs Schedulers will work with the AFRC and ANG AEF Cells and AEFC CG and CR for additional ARC volunteers LINK SOURCING TO LIBRARIES If UTCs are broken to fill other UTC requirements notify the MAJCOM FAM which AEF library UTC is being broken, so it can be appropriately marked as tasked in ART Coordinate with MAJCOM counterparts Your judgment is key. If in doubt, ask AES, AEO and AEP Share good ideas – processes *see notes page for helpful links Line Remarks: http://www.afpc.randolph.af.mil/readiness/ MISCAPS without going through DCAPES:  https://www.afmia.randolph.af.mil/ Go to:  Wartime Readiness (bottom left of page)  MANFOR (3rd button on left of screen)   Click 1st UTC MISCAP file (In excel and allows you to set a filter) AF_PAS.xls : available at \\LFI-FS-ACC-DRU\AEFCShared\AEF Center Shared Information\Pas\AF_PAS.xls

QUESTIONS?