DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Chapter-2 Parts of Steel Bridge.
Public Works Road Fund Overview May 2, 2013 Tanya Heaton, PW Budget Manager.
Bridge Engineering (6) Superstructure – Concrete Bridges
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Rating of Local Bridges for SHVs Using Virtis Software Virtis/Opis User Group Meeting August 3-4, 2010 Moises C. Dimaculangan, P.E. Minnesota Department.
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
1 South Slough Bridge # APWA National Project of the Year Transportation Category, Projects Less Than $2 million.
Chapter 34 Bridge Construction.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
POWERPOINT PRESENTATION
Totally Precast Concrete Bridges
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Reconstruction of the Eads Bridge Highway Deck
Improving Operational and Structural Performance of the Burlington-Bristol Bridge Design Team 25: Dan Kramer Nate Dubbs Tom Golecki Jim Gardner Kyle Kessler.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
FOUNDATION The foundation of a structure is the lowest part of the sub-structure interfering with the soil and the structure. It consists of some structural.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
2012 Section Engineer Meeting Wednesday October 3, 2012 Presented by Steve Applegate – Project Consultant Tom Nein - Plate Production & Plant Manager.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
Commercial Foundations
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Chapter 2b Foundations Shallow & Deep Foundations.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Other Construction Projects
Highways/BridgesHighways/Bridges American Bar Association Forum on the Construction Industry American Bar Association Forum on the Construction Industry.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Reading Structural Drawings
Bridge Engineering (5) Substructure – Abutments and Piers
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
C. C. Fu, Ph.D., P.E. The BEST Center
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Foundation Loads Dead Load Live Load Wind Load
Geometric Design: General Concept CE331 Transportation Engineering.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Money.
College of Engineering, EEIC Ethical Dilemmas Ethical dilemmas arise when there are multiple Stakeholders with conflicting interests. Good ethical practice.
Understand foundation design and construction
Viktor Krivenkov Pavel Titov Roman Zinovjev Dmitry Pinezhko TTK/UAS, 2010.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Replacement of Vehicle Bridge over Spring Creek
Pearl Condominiums Philadelphia, PA
2016 FHWA National Hydraulic Engineers Conference
Advisor: Professor M. Kevin Parfitt
Sandra Larson, P.E. Iowa Department of Transportation
EAG346-Sem II 2014/2015 Lesson 2.
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
WE-WC Almaty – Khorgos Road Section Materials prepared in %
Replacement of Vehicle Bridge over Spring Creek
Presentation transcript:

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH 2014 Maryland Concrete Conference Kevin J. Sabolcik, P.E. Baltimore County DPW David Berkhimer Brawner Builders, Inc.

AN ECONOMIC APPROACH TO A SMALL BRIDGE REPLACEMENT PROJECT OR ‘BRIDGE ON THE QUICK & CHEAP’ DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION

Problem Analysis – Decision Process Design Construction Conclusion DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION

What is a project? A series of planned events undertaken in a systematic manner to achieve a specific outcome while balancing the constraints of schedule, cost and performance or quality. DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION

Existing Structure Built Circa 1920 Concrete Slab w/Encased Steel Beam Superstructure Concrete Abutments on Spread Footings 16’ Long Span, 20’ Clear Roadway, 24’ Out to Out Width

Bridge No. B-0427 Dairy Road Elevation DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION

Bridge B-0427 Dairy Road Approach

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Interim Action

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Structure Condition Overall Sufficiency Rating ≈ 38% Superstructure in Poor Condition Substructure in Satisfactory Condition Some Minor Lowering of the Stream Bottom along Abutments/Exposed Footings

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Dairy Road Characteristics Rural Local Road (Northern Balt. Co.) Width Varied 16’ to 18” Tangential / Flat Alignment ADT ≈ 575 VPD/2% TRUCKS 30 MPH Design Speed No History Of Accidents At Site

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Other Design Consideration Adjacent Overhead Utilities Soil Borings Indicated 10’ Silt/Sand Mix, 15’ Decomposed Rock then Rock No ROW beyond Existing Footprint USE III Waterway (10/1 to 4/30 Restriction)

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Project Needs Need to Replace Deteriorated Structure Safety – Current Code (Loads, Widths, Barriers, etc.) Get In – Get Out – Stay Out

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Project Wants Want to Avoid Right of Way Acquisition – Highest Priority Want to Minimize Permitting & Utility Issues – Secondary Priority Want Most Cost Effective Solution – Lowest Priority

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION Design Direction Leave Existing Abutments for Scour Protection & Minimize Stream Impacts Maintain Low Chord/Road Profile 24’ Clear Roadway Width (Design Exception Documented) Reinforced Precast Concrete Slabs Cast-in-Place Concrete Abutments on Micro-Piles.

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION

Performance Specification for Pile Foundation

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION

Conclusions Total Project Cost ≈ $500,000 Total Project duration < 12 Months Avoided ROW Issues by Discussing Project with Adjacent Property Owners Achieved Project Purpose

DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION QUESTIONS??? Teamwork