By: Carrie Turner Prepared for: New Jersey Association of Environmental Authorities Annual Conference March 12, 2013 Watershed Management Planning Provides.

Slides:



Advertisements
Similar presentations
What are TMDLs? and What Might They Mean to MS4 Permittees?
Advertisements

NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
O Adopted in 1972, the CWA is known mostly to the public by its mandate for “swimmable and fishable” waterways. o With the CWA, states evaluate all of.
Water Quality Standards and MS4 Storm Water Permitting.
Pollutant Trading Discussion 22 July Why Allow Trading? §To make point sources pay §To lure nonpoint sources into doing pollution control so we.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
TMDL Implementation in the Calleguas Creek Watershed Ashli Desai Larry Walker Associates.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Bureau of Water Program Overview Local Government Interest.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Integrated Approach Planning - Ecology’s Perspectives Spokane River Forum Conference Spokane, WA March 26, 2013.
Components of every Good Watershed Management Plan NDEQ – Planning Unit August 6 th, 2014 NDEQ – Planning Unit gust 6 th 2014.
9.Monitoring Plan + 10.Implementation Plan + 4. LAs* 5. WLAs* 6. MOS* 7.Seasonal Variation* 8.Reasonable Assurance + TMDL Process 1 Problem Understanding.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Overview of Key Rule Features
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
Approaches to Addressing Bacteria Impairments Kevin Wagner Texas Water Resources Institute.
Photos from the U.S. Environmental Protection Agency.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Water Quality Associated with Urban Runoff: Sources, Emerging Issues and Management Approaches Martha Sutula and Eric Stein Biogeochemistry and Biology.
Total Maximum Daily Loads in MS4 Storm Water Programs.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Wetland Monitoring and Assessment Mid-Atlantic States
VIRGINIA’S TMDL PROCESS.
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
1 Sandra Spence EPA Region 8 TMDL Program EPA Region 8 TMDL Program Integrating Watershed Plans and TMDLs to Help Answer Watershed Planning Questions November.
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
Water Quality Standards, TMDLs and Bioassessment Tom Porta, P.E. Nevada Division of Environmental Protection Bureau of Water Quality Planning.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
The Use of Environmental Management Systems in Permitting Decisions National Environmental Partnership Summit 2006 May 10, 2006 Christine Steagall SC Department.
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Straight to the Point – Watershed-based Plans Should: be designed to restore water quality from nonpoint source impairments using sufficiently analyzed.
Source Identification Stormwater Work Group March 24, 2010.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Introduction to Water Quality Trading National Forum On Water Quality Trading July 22-23, 2003 Chicago, Illinois.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
One Water LA is a collaborative approach to develop an integrated framework for managing the City’s watersheds, water resources, and water facilities in.
1 Water Quality Antidegradation: Guidance to Implement Tier II Summary of Discussion: Review the Tier II Rule requirements. Clarify what feedback we are.
Ozone Data and Outreach Stan Belone Salt River Pima-Maricopa Indian Community Air Quality Program.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Commonwealth of Virginia TMDL Program Update Citizen for Water Quality Annual Summit September 22, 2001.
Modeling Fecal Bacteria Fate and Transport to Address Pathogen Impairments in the United States Brian Benham Extension Specialist and Associate Professor,
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Integrated Planning and Financial Capability 1 David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Integrated Regional Water Management Grant Program Implemented Jointly by Department of Water Resources and State Water Resources Control Board.
K. Bruce Jones EPA Office of Research and Development U.S. EPA Science Advisory Board Regional Vulnerability Assessment Advisory Panel Meeting October,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Framework for CSO Control Planning
VIRGINIA’S TMDL PROCESS Four Mile Run Bacteria TMDL March 25, 2002
SPU Modeling & Monitoring
Tim Cawthon TCEQ Nonpoint Source Program
Developing a Water Quality Trading Framework
Water & Wastewater Equipment Manufacturers Association March 22, 2017
Straight to the Point – Watershed-based Plans Should:
High Rock Lake TMDL Development
Presentation transcript:

By: Carrie Turner Prepared for: New Jersey Association of Environmental Authorities Annual Conference March 12, 2013 Watershed Management Planning Provides the Primary Support for Selecting Water Quality Improvement Projects

2 © 2011 Electric Power Research Institute, Inc. All rights reserved. Outline Why Water Quality? Watershed Assessment Process Implementation and Regulatory Considerations

3 © 2011 Electric Power Research Institute, Inc. All rights reserved. Executive Summary Historically, wet weather discharges are controlled based upon programmatic silo requirements Watershed and water quality data allow comparison of controls across silos – includes modeling of controls Watershed and water quality data allow comparisons that will provide basis for choosing controls with greatest environmental benefit

4 © 2011 Electric Power Research Institute, Inc. All rights reserved. Why Use Water Quality? Water quality improvement is the driving force behind the Clean Water Act –Ultimately success and need for controls will be defined by waterway conditions (“fishable and swimmable”) Water quality spans all of the elements in the EPA’s Integrated Planning Framework Water quality provides a common interest for regulatory, utility and stakeholders to reference

5 © 2011 Electric Power Research Institute, Inc. All rights reserved. Traditional Management Approach

6 © 2011 Electric Power Research Institute, Inc. All rights reserved. Integrated Management Approach

7 © 2011 Electric Power Research Institute, Inc. All rights reserved. Watershed Assessment Approach 1.Characterize watershed –Monitoring –Develop analysis tools/models 2.Set factors to prioritize evaluation of controls 3.Use tools to evaluate controls –Public and other stakeholders have an important role in identifying and prioritizing controls 4.Develop the Integrated Plan –Incorporate affordability into planning and scheduling

8 © 2011 Electric Power Research Institute, Inc. All rights reserved. Watershed Characterization Objective –Identify impairments in local waterways Not meeting designated uses Exceedances of water quality standards Adverse impacts –Identify impairments (responses), their causes (stressors or pollutants) and sources in the watershed

9 © 2011 Electric Power Research Institute, Inc. All rights reserved. Conceptual Examples of Source-Stressor-Response Approach in Watershed Characterization

10 © 2011 Electric Power Research Institute, Inc. All rights reserved. Watershed Characterization Steps 1.Identify impairments and/or other adverse impacts in the waterways Answer the Question: Why is the waterway not meeting WQS? i.e., bacteria levels are too high, metals are toxic to biota, etc. 2.Identify pollution parameters of concern and other stressors to the watershed system; Answer the Question: What pollutants in the waterway don’t meet WQS or threshold criteria? 3.Identify all potential pollutant sources and quantify their impact on the waterway Answer the Question: What does the waterway’s pollutant pie chart look like? 4.Identify critical conditions affecting waterway and watershed sources. Answer the Question: What conditions is the waterway most sensitive to and what are the associated sources? Percent of Time Meeting WQS

11 © 2011 Electric Power Research Institute, Inc. All rights reserved. Tools to Conduct Watershed Characterization Data and Monitoring –Data Types –Monitoring Considerations GIS/Spatial Data Models –Infrastructure –Watershed –Waterway Other Analysis Tools –Watershed Health Index

12 © 2011 Electric Power Research Institute, Inc. All rights reserved. Setting Prioritization Factors Important to gauge success Reflect community priorities Examples of Water Quality factors –Increase in WQ Standard compliance –Stream miles improved –Load reduction Other factors to consider –Public health risk –Flooding –Protection of drinking water supply

13 © 2011 Electric Power Research Institute, Inc. All rights reserved. Using Water Quality to Identify Mix of Controls

14 © 2011 Electric Power Research Institute, Inc. All rights reserved. Identifying Control Opportunities

15 © 2011 Electric Power Research Institute, Inc. All rights reserved. Evaluating an Integrated Control Plan CSO area: Int. Plan has better WQ than Traditional Plan with lower level of CSO control Blue = 2030 Baseline Green = 2030 Traditional Plan Yellow = 2030 Integrated Plan SSO area: Difference between blue and green is elimination of SSOs. Difference between green and yellow is added benefit of example Watershed Control Program. Headwaters: Only Int. Plan improves WQ Recreation Season Geometric Mean Density (cfu/100 ml)

16 © 2011 Electric Power Research Institute, Inc. All rights reserved. Developing a Watershed-Based Cost-Performance Analysis

17 © 2011 Electric Power Research Institute, Inc. All rights reserved. Planning with Multiple Stressors Strategies: 1.Use ranking system 2.Aggregate pollutants 3.Address most disruptive stressor first

18 © 2011 Electric Power Research Institute, Inc. All rights reserved. Putting It All Together: Watershed-Based Permitting

Additional Information: Carrie Turner LimnoTech (734) The End: Questions and Discussion