Florida Department of Environmental Protection Environmental Resource Program Workshop Series 2010/2011 - Exemptions and Self Certification Process.

Slides:



Advertisements
Similar presentations
Plate with Vehicle Plate with Owner July Plate with Owner Applies to the Following Vehicles Commercial Vehicles Noncommercial Vehicles Trailers.
Advertisements

U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Overview of Mitigation Banking Program December 10, 2009 Robert M. Brown, Director Environmental Resource Regulation Department Robert M. Brown, Director.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
Tessa Getchis Connecticut Sea Grant University of Connecticut Groton, Connecticut Do All Roads Really Lead to Rome?
We are “SLERP” State Lands & Environmental Resources
Florida Department of Environmental Protection (DEP) Environmental Resource Program Workshop 2011 Agenda -9:00-9:15-Introductions -9:15-9:45-Introduction.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
DRIs After 360. Transportation Methodology § (7) PREAPPLICATION PROCEDURES.— The levels of service required in the transportation methodology shall.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
OVERVIEW Current Ordinance Has to Change Property Owners That Do Not Use The System Should Not Pay Property Owners That Use The System Receive a Benefit.
Clean Water Act (CWA) CWA Agricultural Exemptions and Associated NRCS Conservation Practice Standards New England Farmers Union December 12, 2014 Natural.
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Preservation of Recreational & Commercial Working Waterfronts Provisions of Chapter , Laws of Florida (HB955, SB1316)
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
Chapter F.A.C. Updates Solid Waste Program.
Martin Informational Meeting. May 24, 2007Martin Informational Meeting2 Agenda 9:00 – 9:30 AM Welcome & Overview of the January Issues Identification.
Bureau of Watershed Management Regulatory Proposal Chapter 105 Dam Safety and Waterway Management February 21, 2007.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Water Quality Reduction Trading Program Draft Rule Language Policy Forum January 29,
Environmental Resource Program Workshop Series 2011 Operating Agreement Between the South Florida Water Management District & Florida Department of Environmental.
By Andrew Baumann, Esq. Lewis, Longman & Walker, P.A.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
OFFICE OF COASTAL MANAGEMENT Karl Morgan JUNE 2013 Karl Morgan JUNE 2013.
Board of County Commissioners PUBLIC HEARING January 11, 2011.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Conservation Area Impact Permit Modification and Transfer Request DFD ONE, LLC Environmental Protection Division September 22, 2015.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
Board of County Commissioners PUBLIC HEARING January 13, 2009.
Community Development Department Variance Length of Dock Roof 2 Cardinal Court.
Proposition 1 Workshop: the Grant Application Process July 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
The Public Waterfront Act. Covering the basic questions Why? Purpose of Act and Regulations Where? Geographic Jurisdiction What? Activities Subject to.
Department of Army Permitting Process: Dredging
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Submerged Lands Leasing Program Dan Prichard Bureau of Parks and Lands Department of Conservation.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
US Army Corps of Engineers BUILDING STRONG ® Intracoastal Waterway Setback Guidance Shelley Trulock Project Manager, Programs & Project Management Division.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
PROPOSED AMENDMENTS TO LEASING REGULATIONS Calendar Item 5.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
Agenda Item F 16a Moriarty Dock Replacement 2782 Bayshore Drive, Newport Beach.
TREE ORDINANCE WORKSHOP DISCUSSION September 3, 2014.
At approximately four (4) square miles in size, Lake Hopatcong is the largest freshwater body in New Jersey.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLEMOBILESAVANNAHCHARLESTONWILMINGTON Trusted Partners Delivering Value, Today and Tomorrow Tori.
Environmental Quality Board
Tori White Deputy, Regulatory Division U.S. Army Corps of Engineers
Guaranteed Energy Savings Performance Contracting
Marina and Mooring Field
Continuing Authorities Program
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Ernest Floyd Foster Foster Seafood 70 Captain Tom’s.
Public Lands Act Regulations Update
Fire Commission May 22, 2019.
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Florida Department of Environmental Protection Environmental Resource Program Workshop Series 2010/ Exemptions and Self Certification Process

What qualifies for a dock exemption? Commonly used dock exemptions

³Construction, repair, and replacement of mooring pilings ³Construction of private docks (non-commercial) ³(1,000-sq. ft. limitation/500-sq. ft. if aquatic preserve) ³Construction of private dock in artificially created waterways ³(1,000-sq. ft. limitation) ³Repair and replacement of functional docks or mooring pilings ³Construction and maintenance of boat ramps on artificial waterways and associated structures The 5 regulatory dock exemptions

Proprietary (Not in an Aquatic Preserve)- Consent by Rule { Must be 1,000-sq. ft. or less { Structure is only dock or pier per parcel and not private multi-family with 3 or more slips { Can’t impede navigation (25% Rule of Thumb) { Must be a water dependent structure { Cannot be revenue generating Proprietary - Letter of Consent { All docks proposed in AP’s 500-sq. ft. or less { Considered one minimum size private single-family dock or pier per parcel { Can’t extend beyond 20% of the water body or 500 feet, whichever is less { Must be a water dependent structure { Setbacks of 10 feet (marginal) or 25 feet (other design), unless it gets Consent by Rule or <65’ shoreline Proprietary forms of authorization-Docks

Proprietary Letter of Consent (cont’d) { Private single-family or multi-family that cumulatively preempt no more than 10 sq. ft. for each linear foot of shoreline Proprietary - Lease { Larger than minimum size or over 10:1 ratio { Commercial revenue-generating Proprietary forms of authorization-Docks

{ Construction of seawall or riprap in artificially created waterway - No more fill than necessary -Constructed at the MHW line { Repair and replacement of seawalls or riprap -within one foot of existing (as measured wetface to wetface) { Construction of private vertical seawalls and riprap -connecting existing adjacent seawalls Proprietary Authorization : Consent by Rule- seawall repair Letter of Consent- new seawalls located at MHW *No filling of SSL Seawall Exemptions

-Regulatory -Associated Docks must be < or = 500 square feet -Navigational access must exist -Must be open to the public -< 30 feet wide -No more than 25 cubic yards of material severed -No return water from dredging Proprietary No proprietary approval is necessary – Proprietary does not apply to artificial water bodies Boat Ramp Exemptions

Maintenance Dredging ­ Existing man-made canals/artificial water bodies ­ Max. of -5 feet MLW, if no prior permit exists ­ No return of deleterious water Proprietary ­ No proprietary approval is necessary – proprietary does not apply to artificial water bodies Other Exemptions (5) Transmission and Distribution Lines and Utility Poles (6) Repair, replacement of bridges

9 September 25, 2007 Floating vessel platforms (FVP) Statute (2)(s) {Float at all times {Sole purpose to support vessel out of water when not in use {Not used to moor vessels in the water (no mooring cleats) {Not used for any commercial purpose {Wholly within previously permitted boat slip (size limited to size of slip) {If associated with exempt dock or permitted dock with no defined boat slip: {< 500 sq. ft. outside OFWs {< 200 sq. ft. inside OFWs

Exemption Review Process n Department receives application n Application n Set of drawings n $100 processing fee per exemption verification n 30 Day Review process-Does it meet exemption criteria??? n Complete upon receipt-Issue within 30 days n Incomplete-Request for additional information sent to applicant

Exemptions Proprietary Review: GRANTED- if on state lands Consent by Rule Letter of Consent Letter of no objection NOT REQUIRED-if not on state lands PENDING-if proprietary is still being processed (Leases, Easements, Etc.) Federal Review (State Programmatic General Permit (SPGP)) –GRANTED- can grant Corps authorization –NOT GRANTED-can’t issue on behalf of Corps –NOT REQUIRED-out of Corps jurisdiction Regulatory Review: VERIFIED- with reference to what rule it meets NOT VERIFIED-Department was not able to verify qualification of exemption criteria

MAJOR POINT If a project is exempt from having to get an ERP permit or a proprietary consent by rule, then the applicant need not come to our Department......

New Self Certification

About the Online Business Portal Allows online application, payment and other services. Gathers and integrates DEP’s existing online services in one place. Provides new features to enhance and simplify online access. Make DEP’s work more transparent.

What are the benefits of Self Certification? Helpful to Agents/Homeowners Easy to use Obtain DEP and USCOE authorization together No waiting for time clocks Takes Less than 30 minutes Helpful to DEP Essentially free to maintain Easy to teach (online process) Workload reduction DEP Case Managers can focus on other DEP applications Streamlining efforts

ESSA Enterprise Self Service Authorization Department Wide Currently supports ERP & Waste Applications

Current Self Certification New Docks ONLY Excluded Areas

New Self-Service Authorizations  Receive an exemption for:  construction of a new single-family dock;  repair and replacement of a single-family dock;  installation of a boat lift at a single-family dock; and  construction of a new single-family dock and installation of a boat lift.  Receive a Noticed General Permit for installation of riprap along the face of an existing seawall.

Business Portal Homepage

Apply

Apply to Build

Apply - Build Access DEP’s e-permitting application to apply to build the following online. The online application provides for payment of the permit fee online by credit card and s the issued permit at the end of the application process. Boat Lift Riprap Structure Single Family Dock Single Family Dock (Repair or Replace)

ESSA Register (owner or agent) Enter your mailing address and project address Verify location of project on aerial image (Mapdirect) ESSA determines Excluded areas & COE authorization Terms and conditions Payment